Drawing for GREENTECH

USPTO serial 77872150

GREENTECH

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
GLASSER, CARYN
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with GREENTECH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Donald C. Lucas

DONALD C. LUCAS Lucas & Mercanti, LLP30 BROAD STREET, 21st FLOORNew York, NY 10004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Electrical equipment for the railway industry, namely, lightning arresters, electric resistor boxes, capacitators, inverters; AC and DC traction systems for the railway industry, namely, traction converters, remote circuit breakers control switch operators; electric control systems, namely, train control systems used in the railway industry for detecting and controlling trains or track switches and lights; computer hardware and software for the railway industry for controlling the direction, movement, speed of trains, for controlling the operation of trains present on the railway network, for coordinating the operation of electric or hydraulic brake equipment, for managing and controlling the cooling system of the motors, the filters and the brake resistors, for self-diagnosing and signaling faults of the components of train equipment; calculating machines and data processing equipment for use by the railway industry; software for use on electric traction current converters for the railway industry; software for checking rail equipments and apparatuses; electric traction current converters for the railway industry; electronic control systems, namely, proprietary control electronics based on microprocessors and digital signal processors with high processing capacity and modular input/output configuration that integrate with sensors and power train components to provide the functions of product transportation, accumulation, merging, diverting and information tracking for railway machines and rolling stock; electronic circuit cards; electric and electronic instruments and apparatuses for the conduction, distribution, transformation, accumulation, adjustment and control of electric current for railway machines and rolling stock, namely, current converters, electric current switches, electronic monitors and monitor modules for monitoring electric current and electrical signals; electric control panelsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 17, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 12, 2013MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Nov 11, 2013ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Apr 11, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 10, 2013EX5GSOU EXTENSION 5 GRANTED—
Mar 28, 2013EXT5SOU EXTENSION 5 FILED—
Mar 28, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 1, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 31, 2012EX4GSOU EXTENSION 4 GRANTED—
Aug 29, 2012EXT4SOU EXTENSION 4 FILED—
Aug 29, 2012EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 20, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 19, 2012EX3GSOU EXTENSION 3 GRANTED—
Mar 6, 2012EXT3SOU EXTENSION 3 FILED—
Mar 6, 2012EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Sep 7, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 6, 2011EX2GSOU EXTENSION 2 GRANTED—
Sep 6, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 1, 2011EXT2SOU EXTENSION 2 FILED—
Sep 1, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 26, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Mar 24, 2011EX1GSOU EXTENSION 1 GRANTED—
Mar 24, 2011EXT1SOU EXTENSION 1 FILED—
Mar 24, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 5, 2010NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Aug 10, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 10, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 2, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 2, 2010ALIEASSIGNED TO LIE—
Jun 21, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 7, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 7, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 7, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 22, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 22, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 22, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 19, 2010DOCKASSIGNED TO EXAMINER—
Nov 20, 2009MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Nov 19, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 17, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance