Drawing for RENEWABLE POWER SOLUTIONS

USPTO serial 77876354

RENEWABLE POWER SOLUTIONS

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
TENG, SIMON
Law office
TMEG LAW OFFICE 105 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with RENEWABLE POWER SOLUTIONS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Solar-powered electricity generatorsACTIVEMay 1, 1998
009Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic solar modules; Apparatus for converting electronic radiation to electrical energy, namely, photovoltaic thermal module; Apparatus for converting electronic radiation to electrical energy, namely, PVT module; Photovoltaic cells; Photovoltaic cells also including a solar thermal collector sold as a unit; Photovoltaic cells and modules; Solar batteries; Solar cells; Solar panels for production of electricity; Thin-film solar, vertical axis wind turbine and Hybrid TFS VAWT off-grid power and deep cycle battery storage systems composed of batteries, charge controllers and inverters with integrated LED bulbs and LED light fixturesACTIVEMay 1, 1998
042Design of solar photovoltaic systems; Drafting and development of photovoltaic systems; Technical planning of photovoltaic installations; Technical planning of photovoltaic/solar thermal hybrid installations; Technical planning of solar thermal installations; Technology planning and consulting in the field of solar energy, specifically specializing in substrates primarily of ceramic, silicon and non-metals for electrical or thermal insulation of solar cells, photovoltaic cells, and solar collectorsACTIVEMay 1, 1998

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Oct 1, 2010MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Oct 1, 2010ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 3, 2010CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Mar 2, 2010ALIEASSIGNED TO LIE—
Mar 2, 2010GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Mar 2, 2010GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Mar 2, 2010CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Feb 25, 2010DOCKASSIGNED TO EXAMINER—
Nov 26, 2009MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Nov 25, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 23, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance