Drawing for MASTER PLUMBER

USPTO serial 77879039

MASTER PLUMBER

Reviewed by CopyMark Law Group

Reg. 3980030Status 800Registered
Filing date
Status date
Registration date
Jun 21, 2011
Examiner
BOONE, JOHN C
Law office
TMEG LAW OFFICE 104

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with MASTER PLUMBER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher J. Schulte

Christopher J. Schulte Attorney of Record, Minnesota Bar memberP.O. Box 2910Minneapolis, MN 55402United States

Goods and services

ClassDescriptionStatusFirst use
003[ Sandpaper, namely, plumber's abrasive sand cloth used for cleaning, polishing, and for preparation of joints for soldering ]SECTION 8 - CANCELLEDJul 1, 2009
004Lubricant for faucets, namely, silicone greaseACTIVEJul 1, 2009
006Deep flanges made of metal; Shallow pipe covers with a chrome metal finish; Hardware mounting system comprised of metal brackets for mounting shower heads, handheld shower heads, shower arms, and shower swivel connectorsACTIVEJul 1, 2009
007[ Pump control valves, namely, sump pump check valves; Electric pumps, namely, non-ejector sewage pumps, effluent pumps, and sewage ejector pumps; Electric pump system comprised of a sump pump, ten-gallon storage tank, check valve, grommets, and fittings, for use under laundry tubs, wet bars, air conditioner draining, sink draining, or tub draining ]SECTION 8 - CANCELLEDJul 1, 2009
008[ Hand tools, namely, rigid and rod hand benders for use on pipes; Hand tools, namely, lever-style tube benders; Hand tools, namely, stainless steel cable saws for cutting through plastic pipe; Hand-operated drill pumps ]SECTION 8 - CANCELLEDJul 1, 2009
009[ Replacement electric switches for column sump pump machines; Gas leak detectors in liquid form; Electric switches, namely, tethered universal float switches for sump pumps and submersible vertical pump switches for sump pumps ]SECTION 8 - CANCELLEDJul 1, 2009
011[ Plumbing fixtures and fittings, namely, Sewage check valves, Chrome-plated metal connectors for shower swivels, Manually-operated chrome shower flow valves, Faucet stems, Chrome-plated compression fittings consisting of nuts and sleeves, Chrome-plated straight compression fittings, Chrome-plated compression nuts and sleeves, Chrome-plated angled compression fittings, Faucet adapters, Snap-on stainless steel drain covers, Top assembly anti-siphon fill valve replacement caps, Plastic flush valve with rubber flappers, and Flush valves in the nature of handle assemblies made of metal; ] Plumbing fixtures, namely, sink spray hose guide with plastic chrome finish; Chrome or powder-coated steel sink hole covers with bolts and wing nuts for installation; [ Plumbing fixtures, namely, toilet fill valve repair kit consisting of plunger washers and thumb screws; ] Plumbing fittings, namely, toilet fill valve repair kit for replacing ballcock assemblies; Plumbing fittings, namely, anti-siphon toilet fill valves; Plumbing fixtures, namely, toilet fill valve repair kits consisting of a combination of O-rings or diaphragms, plastic plunger assemblies, plastic seats, and screws; [ Plumbing fixtures, namely, flush valve seals made of rubber; ] Plumbing fittings, namely, stainless steel toilet flapper chains with hooks; [ Plumbing fittings, namely, pipe strappings made of copper and steel; Plumbing fixtures, namely, shower arm ball adapters; Plumbing fixtures, namely, relief valves made of plastic; Plumbing fixtures, namely, water saver valve assemblies for siphon jet toilets and water closets; ] Plumbing supplies, namely, snap-in sink hole covers made of chrome; [ Chrome nut kits for plumbing purposes consisting of slip joint nuts, washers, and brass friction rings; Faucet shank nut kit for plumbing purposes consisting of metal faucet shank nut, cone washer, and brass friction ring; ] Toilet tank repair kits comprised of fill valves, refill tubes, clips, floats, flappers, float rods, chains, lock nuts, and coupling nuts; [ Water saver toilet repair kits comprised of anti-siphon fill valves, adjustable water saver flappers, floats, float rods, refill tubes, cone washers, lock nuts, and coupling nuts; ] Toilet repair kits comprised of plastic bullock nuts, cone washers, and brass rings for connecting the water supply line to the tank; Plumbing fixtures in the nature of toilet flappers, namely, replacement flush valve actuator with metal chains; Plumbing fixtures in the nature of toilet flush valve and actuating units comprised of metal chains, metal Y hooks, rubber snap on seat discs, and rubber washers to connect tank to bowl; Metal log lighter keys, namely, devices for controlling gas delivery systems in gas fireplaces; Plumbing fixtures, namely, shower arms and adjustable shower arms made of chrome or brass; Plumbing fixtures in the nature of toilet/urinal top fill valve assembly made of plastic; Plumbing fixtures in the nature of shower couplings with mounting arms, used for mounting handheld shower heads, shower heads, shower arms, and shower swivel connectorsACTIVEJul 1, 2009
017[ Outdoor faucet protectors, namely, foam insulation for outdoor faucets; ] Pipe plug kits for use in plumbing consisting of sealing plugs made primarily from rubber; Washers of rubber for use as flush valve discs for plumbing uses; Flush valve shank washers of rubber for plumbing purposes; [ Soldering shields, namely, fiberglass sheets used to cover and protect objects from heat while soldering; ] Sump pump accessories, namely, nonmetal gas suction and discharge hoses for use with engine driven sump pumpsACTIVEJul 1, 2009
021Wire brushes, not being machine parts, for use as tube cleaning brushes for cleaning the inside or outside of tubes; Chrome-finish liquid soap dispenserACTIVEJul 1, 2009

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 13, 2025TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 13, 2025ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 13, 2025REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 13, 2025CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jan 13, 2025COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 18, 2024ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Nov 1, 2021NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Nov 1, 2021RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Nov 1, 20219G8PREGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8—
Nov 1, 20218PRTREGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED—
Nov 1, 2021APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 17, 2021E89RTEAS SECTION 8 & 9 RECEIVED—
Jun 21, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 13, 2018ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 23, 2018ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
May 9, 2018ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 6, 2018NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Jan 6, 2018C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Jan 6, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 11, 2017E815TEAS SECTION 8 & 15 RECEIVED—
Dec 17, 2014ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jun 21, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 5, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 16, 2011NPUBNOTICE OF PUBLICATION—
Feb 25, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 25, 2011ALIEASSIGNED TO LIE—
Feb 1, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 1, 2011CNEAEXAMINERS AMENDMENT MAILED—
Jan 31, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Jan 31, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 29, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 29, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 29, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Nov 5, 2010CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 4, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 29, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 28, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 28, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 10, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 10, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 3, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 3, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 3, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 3, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 2, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 24, 2010DOCKASSIGNED TO EXAMINER—
Nov 27, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 26, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance