Drawing for INDIE ENERGY

USPTO serial 77900013

INDIE ENERGY

Reviewed by CopyMark Law Group

Reg. 4040148Status 710
Filing date
Status date
Registration date
Oct 18, 2011
Examiner
COLEMAN, CIMMERIAN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with INDIE ENERGY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
009Computer hardware and software for remotely monitoring environmental conditions and controlling devices within a building, facility, grounds, or designated spatial area; environmental monitoring system comprised of meters and sensors that measure pressure, humidity, temperature and includes alarm and reporting functions; environmentally friendly automation systems, namely, embedded operating systems and PC based software, for monitoring specified conditions and controlling respective innovative devices within a designated area; computer software for simulation and design of renewable energy systems for buildings and infrastructure; renewable energy monitoring, measurement, and verification system, namely, hardware and software to remotely measure, record, and broadcast information from energy system via internet to remote hosted server, where calculations verifying and optimizing performance are performedSECTION 8 - CANCELLED—
011Renewable energy systems, namely, heating and cooling systems composed primarily of heat pumps, chillers, boilers, cooling towers, ground or borehole heat exchangers, thermal energy storage systems, and related piping, ducts, electronics, sensors, and controls for buildings and infrastructure in the nature of geothermal heat exchange property, HVAC equipment, and solar equipmentSECTION 8 - CANCELLED—
035Business consultation services in the field of energy conservation, namely, geothermal energy for heating and cooling systems for buildings and infrastructure; arranging of buying and selling contracts for third parties, namely, energy service agreements and power purchase agreements for geothermal-based building systems and infrastructureSECTION 8 - CANCELLED—
037Geothermal heating and cooling contractor services; installation of geothermal heating and cooling systems; maintenance of geothermal heating and cooling systems; construction of energy systems for others, namely, heating and cooling systems that incorporate geothermal heat pumps; construction of renewable energy systems for others, namely, heating and/or cooling systems for roadways and bridgesSECTION 8 - CANCELLED—
042metering and monitoring of geothermal heating and cooling systems for buildings and infrastructure; design for others in the field of renewable energy systems in the nature of heating and cooling systems for roadways and bridges; engineering and design for others in the field of renewable energy systems, namely, heating and cooling systems for buildings and infrastructure; development of new technology for others in the field of renewable energy systems, namely, heating and cooling systems for buildings and infrastructure; integration of computer systems and networks with renewable energy systems; design and development of software and hardware for renewable energy systems for buildingsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 25, 2018C8..CANCELLED SEC. 8 (6-YR)—
Oct 18, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Oct 18, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 8, 2011DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Sep 8, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 7, 2011PG1BPETITION GRANTED - REQUEST TO DELETE 1(B) FILED—
Sep 6, 2011APETASSIGNED TO PETITION STAFF—
Sep 1, 2011EPGSTEAS PETITION TO REVIVE AND REQUEST TO DELETE 1B OR G/S—
Aug 29, 2011MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Aug 29, 2011ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jul 25, 2011IUCNNOTICE OF ALLOWANCE CANCELLED—
Jul 22, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 22, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 25, 2011NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 30, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 10, 2010NPUBNOTICE OF PUBLICATION—
Oct 22, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 22, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 21, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Oct 21, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 30, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 30, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 30, 2010ALIEASSIGNED TO LIE—
Sep 28, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 29, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 29, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 23, 2010DOCKASSIGNED TO EXAMINER—
Dec 30, 2009NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 26, 2009NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance