Drawing for XAREN

USPTO serial 77910104

XAREN

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
THOMAS, JANICE
Law office
TMEG LAW OFFICE 103 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with XAREN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
001Environmental quality control fluid samples for calculating standards for testing and verifying the quality of water; Environmental quality control gas samples for calculating standards for testing and verifying the quality of water; Inorganic ultrafying calcium peroxide compound in liquid form for environmental remediation purposes; Sample container filled with a preservative in the container for use in the environmental testing fieldACTIVEFeb 10, 1994
009Audio speakers that may be attached with adhesive to the abdominal area of pregnant women for the purpose of transmitting music/sounds to the fetus, not for medical purposes; Audio tapes featuring music; Automotive, industrial, construction, locomotive, aviation, navigation and marine safety-warning lights, namely, strobes, rotating lights and bar lights; Children's educational music CDs and DVDs; Compact disc players; Compact discs featuring music; Computer hardware and software for processing digital music files; Computer hardware and software system for remotely monitoring environmental conditions and controlling devices within a building, facility, grounds, or designated spatial area; Computer programs recorded on data media (software) designed for use in construction and automated manufacturing (cad/cam); Computer software featuring musical sound recordings and musical video recordings; Computer software for processing digital music files; Digital music downloadable from the Internet; Digital music system that synchronizes digital music files stored on a home unit and a car unit; Digital music systems that synchronizes digital radio files stored on a home unit, a car unit, or portable unit and that may be backed up to an internet depository; Digital photo frames for displaying digital pictures, video clips and music; Downloadable MP3 files, MP3 recordings, on-line discussion boards, webcasts, webinars and podcasts featuring music, audio books and news broadcasts; Downloadable musical sound recordings; Downloadable ring tones, graphics and music via a global computer network and wireless devices; Electric, electronic, or electrochemical oxygen monitors and sensors for environmental use; Electrical cables for musical instruments; Electrical circuits for use in amusement game machines for reproducing music, speech and special effects; Music-composition software; Musical instrument adaptors; Musical instrument amplifiers; Musical instrument connectors; Musical sound recordingsACTIVEFeb 10, 1994
036Collecting license fees on behalf of independent writers and publishers and making payments to the copyright owners of the music; Providing project grants for environmental and health awareness projectsACTIVEFeb 10, 1994
037Building construction; Building construction and repair; Building construction services; Building construction supervision; Building inspection; Construction and construction management of tunnels and underground structures; Construction and renovation of buildings; Construction and repair of buildings; Construction management; Construction of buildings; Construction of roads, underground utilities, and housing pads; Construction planning; Construction project management services in the field of construction of offshore oil and gas facilities; Construction project management services in the field of construction of renewable energy and energy generation equipment support structures and ancillary structures for supporting meteorological data gathering equipment; Construction services, namely, concrete paving, site clearing, excavation, pad preparation, grading, and asphalt paving services; Construction services, namely, manhole adjusting; Construction services, namely, planning, laying out and construction of a planned residential community; Construction services, namely, planning, laying out and custom construction of commercial buildings; Construction services, namely, planning, laying out and custom construction of residential and commercial communities; Construction supervision; Construction, maintenance and renovation of property; Consultation in building construction supervision; Consultation services in the field of construction of environmentally-conscious buildings; Consulting in the field of building construction; Consulting services for the construction of water treatment and purification plants, solid waste treatment plants and other municipal infrastructure facilities; Environmental remediation services, namely, waste disposal; General construction contracting; Housing services, namely, development of real property, namely, repair, improvement, and new construction; Housing services, namely, repair, improvement, and construction of residential real property; Information with relation to aircraft construction, repair and maintenance; Marine construction; Pier construction; Pipeline construction and maintenance; Providing on-line information to assist customers in selecting appropriate foundations for constructing and supporting street lighting structures; Real estate development and construction of commercial, residential and hotel property; Rental of construction and building equipment; Rental of construction equipment; Residential and building construction consulting; Residential and commercial building construction; Road construction; Scaffolding, earthworks or concrete construction; Street constructionACTIVEFeb 10, 1994
038Delivery of digital music by electronic transmissionACTIVEFeb 10, 1994
040Environmental remediation services, namely, soil treatment services; Mold remediation servicesACTIVEFeb 10, 1994
041Music composition and transcription for others; Music composition for others; Music production servicesACTIVEFeb 10, 1994
045Advice and consultancy on environmental regulatory matters; Control of building environmental access and security systems; Preparing environmental compliance reports; Safety inspection audits to improve safety of construction workers on residential construction sitesACTIVEFeb 10, 1994

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Jul 11, 2011MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jul 11, 2011ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Dec 7, 2010CEPECOMBINED EXAMINER'S AMENDMENT/PRIORITY ACTION ENTERED—
Dec 6, 2010GEANNOTIFICATION OF EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Dec 6, 2010GEAPEXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED—
Dec 6, 2010CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Jul 27, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 27, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 27, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 20, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 20, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2010ALIEASSIGNED TO LIE—
Jul 9, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 7, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 7, 2010DOCKASSIGNED TO EXAMINER—
Jan 19, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 15, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance