USPTO serial 77925275
ATCO STRUCTURES & LOGISTICS
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Mar 3, 2015
- Examiner
- OH, WON TEAK
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with ATCO STRUCTURES & LOGISTICS?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Calgary, Alberta, CA
Calgary, Alberta, CA
Calgary, Alberta, CA
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Connie L. Ellerbach, Esq.
ERIC BALL FENWICK & WEST LLPSILICON VALLEY CENTER801 CALIFORNI STREETMOUNTAIN VIEW, CA 94041Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | PREFABRICATED AND PORTABLE METAL CLAD BUILDINGS USED, NAMELY, AS WORK FORCE HOUSING, DORMITORIES, CAMP, KITCHENS, SCHOOLS, MOTELS, HOTELS, ACCOMMODATION FACILITIES, OFFICES, CLASSROOMS, RECREATIONAL COMPLEXES, OIL DRILL CAMPS, WASH CARS, LAUNDRY FACILITIES, AND OFFICES | SECTION 8 - CANCELLED | — |
| 007 | SIMPLE CYCLE CATALYST SYSTEMS FOR REDUCING PARTICULATE EMISSIONS AND MINIMIZING AMMONIA SLIP IN GAS TURBINES USED IN POWER GENERATION FACILITIES COMPRISED OF COMBUSTION TURBINES NOT FOR LAND VEHICLES | SECTION 8 - CANCELLED | — |
| 011 | TURBINE INTAKE AND EXHAUST SYSTEMS COMPRISED OF BYPASS STACKS, DIVERTER DAMPERS, GUILLOTINE DAMPER, VERTICAL SILENCER DUCTS, EXHAUST STACKS, BYPASS DIVERTERS, AND EXHAUST DIFFUSER/PLENUM; DIVERTER DAMPERS IN THE NATURE OF HEAT RECOVERY STEAM GENERATOR OF A GAS TURBINE BYPASS SYSTEM WHICH ALLOW WORKERS AT POWER GENERATION FACILITIES TO PERFORM MAINTENANCE TO THE HEAT RECOVERY SYSTEM WITHOUT ENDANGERING WORKERS TO HOT LETHAL GASES, BY DIVERTING GASES FROM THE HEAT RECOVERY STEAM GENERATOR | SECTION 8 - CANCELLED | — |
| 017 | INDUSTRIAL ACOUSTIC NOISE BARRIER UNITS FOR INDUSTRIAL FACILITIES FOR RETROFITTING EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, REGULATOR, METER AND PUMPING STATIONS, NAMELY, ACOUSTIC ROOFING PANELS, WALLS AND WALL BARRIER PANELS; INDUSTRIAL ACOUSTIC NOISE BARRIER SYSTEMS FOR INDUSTRIAL FACILITIES, FOR RETROFITTING EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, REGULATOR, METER AND PUMPING STATIONS, COMPRISED OF NOISE SILENCERS IN THE NATURE OF LAYERED ACOUSTICAL TILES, MODULAR ACOUSTICAL PANELS, ACOUSTICAL INSULATION BARRIER PANELS, ACOUSTICAL INSULATION FOR BUILDINGS, ACOUSTICAL EQUIPMENT ENCLOSURES, ACOUSTICAL MECHANICAL SYSTEMS, ACOUSTICAL DOORS AND WINDOWS; ACOUSTIC BUILDING VENTILATION, NAMELY, ACOUSTIC BUILDING HEATING, AIR CONDITIONING AND VENTILATION SYSTEMS, COMPRISED OF ACOUSTIC NOISE SILENCERS, MUFFLERS AND ACOUSTIC WALLS, NOISE AND VIBRATION DAMPENING MATERIALS | SECTION 8 - CANCELLED | — |
| 019 | INDUSTRIAL ACOUSTIC NOISE BARRIER UNITS FOR INDUSTRIAL FACILITIES, FOR RETROFITTING OF EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, METER AND PUMPING STATIONS, NAMELY, NON-METAL DOORS AND WINDOW | SECTION 8 - CANCELLED | — |
| 035 | BUSINESS PROJECT MANAGEMENT SERVICES RELATING TO POWER PLANTS, RADAR SITES, REMOTE AIRPORTS, WEATHER STATIONS AND MICROWAVE TOWERS; OPERATION OF BUSINESS FOR OTHERS, NAMELY, POWER PLANTS, RADAR SITES, REMOTE AIRPORTS, WEATHER STATIONS AND MICROWAVE TOWERS; BUSINESS MANAGEMENT OF CAMP SERVICES RELATING TO ACCOMMODATIONS, CATERING, HOUSEKEEPING AND JANITORIAL; TRANSPORTATION LOGISTICS SERVICES, NAMELY, ARRANGING THE TRANSPORTATION OF GOODS FOR OTHERS RELATING TO EQUIPMENT SUPPLIES; BUSINESS SERVICES, NAMELY, FACILITY AND MANAGEMENT SERVICES OF TECHNICAL OPERATIONS FOR FACILITIES, NAMELY, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN AND MILITARY AIRPORTS; BUSINESS MANAGEMENT AND OPERATION OF A BUSINESS FOR OTHERS, NAMELY, JOINT VENTURES AND ALLIANCE PROJECTS RELATING TO POWER PLANTS, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, REMOTE AIRPORTS, WEATHER STATIONS, MICROWAVE TOWERS, MODULAR AND PREFABRICATED BUILDINGS FOR TEMPORARY AND PERMANENT OCCUPANCY; PROCUREMENT, NAMELY, THE PURCHASE OF NOISE REDUCTION SYSTEMS FOR OTHERS; PROVIDING TECHNICAL INFORMATION IN THE FIELD OF BUILDING MANAGEMENT FOR MODULAR AND PREFABRICATED BUILDINGS VIA A GLOBAL NETWORK; PROVIDING TECHNICAL INFORMATION IN THE FIELD OF LOGISTICS MANAGEMENT FOR MODULAR AND PREFABRICATED BUILDING CONSTRUCTION | SECTION 8 - CANCELLED | — |
| 036 | PROPERTY MANAGEMENT SERVICES FOR FACILITIES, NAMELY, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN AND MILITARY AIRPORTS; FINANCIAL ASSET MANAGEMENT SERVICES FOR RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN AND MILITARY AIRPORTS; RENTAL AND LEASING OF MODULAR AND PREFABRICATED BUILDINGS FOR PERMANENT OCCUPANCY | SECTION 8 - CANCELLED | — |
| 037 | MAINTENANCE AND REPAIR OF PROJECT FACILITIES INCORPORATED IN DEFENSE SYSTEMS, NAMELY, RADAR SITES, REMOTE AIRPORTS, WEATHER STATIONS AND MICROWAVE TOWERS; MAINTENANCE, CONSTRUCTION AND REPAIR SERVICES RELATING TO ELECTRONIC COMMUNICATION SYSTEMS, NAMELY, RADAR SITES AND CENTRAL MONITORING STATIONS FOR RADAR DATA, MICROWAVE TRANSMITTERS, RECEIVERS, POWER SUPPLIES AND TOWERS, SATELLITE GROUND STATIONS AND RADIO TRANSMITTERS AND RECEIVERS, CONSTRUCTION SITE SELECTION SERVICES; GENERAL CONSTRUCTION CONTRACTING SERVICES; CONSTRUCTION AND INSTALLATION OF FACILITIES AND SYSTEMS IN THE NATURE OF MODULAR AND PREFABRICATED BUILDINGS FOR TEMPORARY AND PERMANENT OCCUPANCY, POWER PLANTS, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN, MILITARY AND REMOTE AIRPORTS, WEATHER STATIONS, MICROWAVE TOWERS, AND GAS TURBINE SYSTEMS AT POWER PLANTS; CONSTRUCTION, INSTALLATION, REPAIR AND MAINTENANCE OF MODULAR AND PREFABRICATED BUILDINGS; ENVIRONMENTAL SERVICES, NAMELY, HAZARDOUS WASTE CLEAN UP AND HAZARDOUS WASTE DISPOSAL; INSTALLATION OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS AND ACOUSTIC AND MODELING SURVEYING; INSTALLATION OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS; PROVIDING TECHNICAL INFORMATION ABOUT MODULAR AND PREFABRICATED BUILDING CONSTRUCTION VIA A GLOBAL NETWORK; PROVIDING TECHNICAL INFORMATION ABOUT INSTALLATION OF NOISE REDUCTION AND BUILDING ACOUSTICS VIA A GLOBAL NETWORK | SECTION 8 - CANCELLED | — |
| 039 | TRANSPORTATION AND STORAGE OF FUELS; UTILITY SERVICES, NAMELY, PROVIDING WATER, AND SEWAGE SERVICES AND TRANSMISSION OF ELECTRICITY; TRANSPORTATION OF MODULAR AND PREFABRICATED BUILDINGS | SECTION 8 - CANCELLED | — |
| 040 | CUSTOM MANUFACTURE TO THE ORDER AND SPECIFICATION OF OTHERS OF MODULAR AND PREFABRICATED BUILDINGS; SITE SERVICES, NAMELY, WATER TREATMENT FOR MODULAR BUILDINGS, PERMANENT MODULAR BUILDINGS, CAMPS AND WORKFORCE HOUSING; UTILITY SERVICES, NAMELY, GENERATION OF POWER | SECTION 8 - CANCELLED | — |
| 042 | DESIGN AND ENGINEERING SERVICES RELATING TO ELECTRONIC COMMUNICATION SYSTEMS, NAMELY, RADAR SITES AND CENTRAL MONITORING STATIONS FOR RADAR DATA, MICROWAVE TRANSMITTERS, RECEIVERS, POWER SUPPLIES AND TOWERS, SATELLITE GROUND STATIONS AND RADIO TRANSMITTERS AND RECEIVERS, SCADA SYSTEMS AND ELECTRONIC COMMUNICATION SUPPORT SYSTEMS; CUSTOM DESIGN OF MANUFACTURED SHELTER SOLUTIONS FOR OTHERS, NAMELY, MODULAR AND PREFABRICATED BUILDINGS; TURNKEY SERVICES FOR OTHERS, NAMELY, DESIGN OF NOISE REDUCTION SYSTEMS; INDUSTRIAL DESIGN, DRAFTING, ENGINEERING, MATERIAL TESTING, MECHANICAL RESEARCH, AND TECHNICAL PROJECT STUDIES RELATING TO SILENCING ARTICLES AND STRUCTURES, NAMELY, LAYERED ACOUSTICAL ASSEMBLIES, MODULAR ACOUSTICAL PANEL PACKAGES, ACOUSTICAL BARRIERS, ACOUSTICAL BUILDINGS, ACOUSTICAL EQUIPMENT ENCLOSURES, ACOUSTICAL MECHANICAL SYSTEMS, ACOUSTICAL DOORS AND WINDOWS; DESIGN OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS; SITE SERVICES, NAMELY, FIELD ENGINEERING, INSPECTION AND TESTING OF MODULAR BUILDINGS, PERMANENT MODULAR BUILDINGS, CAMPS AND WORKFORCE HOUSING | SECTION 8 - CANCELLED | — |
| 043 | HOTEL SERVICES; RENTAL AND LEASING OF MODULAR AND PREFABRICATED BUILDINGS FOR TEMPORARY OCCUPANCY | SECTION 8 - CANCELLED | — |
| 044 | EMERGENCY SERVICES, NAMELY, PROVIDING 24-HOUR RESPONSE CENTER OF EMERGENCY MEDICAL PERSONNEL AND EMERGENCY MEDICAL ASSISTANCE | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by ATCO LTD.
- Other trademarks owned by ATCO LTD.
- Other trademarks owned by ATCO LTD.
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 011
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 035
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Other trademarks in Class 043
- Other trademarks in Class 044
- Similar marks named ATCO STRUCTURES & LOGISTICS
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 8, 2021 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Mar 3, 2020 | REM1 | COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED | — |
| Dec 17, 2018 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Dec 17, 2018 | CANT | CANCELLATION TERMINATED NO. 999999 | — |
| Dec 17, 2018 | CAND | CANCELLATION DENIED NO. 999999 | — |
| Jul 20, 2017 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 20, 2017 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jul 11, 2017 | PETC | CANCELLATION INSTITUTED NO. 999999 | — |
| Apr 21, 2015 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Apr 21, 2015 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Mar 3, 2015 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 13, 2015 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 13, 2015 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 24, 2015 | CHPB | POST PUBLICATION AMENDMENT - ENTERED | — |
| Jan 24, 2015 | APET | ASSIGNED TO PETITION STAFF | — |
| Jan 20, 2015 | ETOP | EXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED | — |
| Jan 9, 2015 | EPPA | TEAS POST PUBLICATION AMENDMENT RECEIVED | — |
| Jul 8, 2014 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Jul 8, 2014 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 18, 2014 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 13, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 30, 2014 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 15, 2014 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2014 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 24, 2014 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 24, 2014 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 13, 2013 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 12, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 4, 2013 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Oct 20, 2013 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Oct 7, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 2, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 12, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 12, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 9, 2013 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jun 25, 2013 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Jun 25, 2013 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jun 24, 2013 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Dec 18, 2012 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Dec 18, 2012 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Dec 17, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 17, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 12, 2012 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jun 15, 2012 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Jun 15, 2012 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jun 14, 2012 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Dec 14, 2011 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Dec 13, 2011 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Dec 1, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 1, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 1, 2011 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Jun 2, 2011 | CNSI | INQUIRY AS TO SUSPENSION MAILED | — |
| Jun 1, 2011 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Jun 1, 2011 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jun 1, 2011 | ALIE | ASSIGNED TO LIE | — |
| Nov 29, 2010 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Nov 29, 2010 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Nov 9, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 8, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 8, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 7, 2010 | CPRA | PRIORITY ACTION MAILED | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| May 7, 2010 | CPRA | PRIORITY ACTION WRITTEN | A priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline. |
| Apr 30, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 9, 2010 | MPMK | NOTICE OF PSEUDO MARK MAILED | — |
| Feb 8, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Feb 4, 2010 | NWAP | NEW APPLICATION ENTERED | — |