Drawing for ATCO STRUCTURES & LOGISTICS

USPTO serial 77925287

ATCO STRUCTURES & LOGISTICS

Reviewed by CopyMark Law Group

Reg. 4693706Status 710
Filing date
Status date
Registration date
Mar 3, 2015
Examiner
OH, WON TEAK
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ATCO STRUCTURES & LOGISTICS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Connie L. Ellerbach, Esq.

ERIC BALL FENWICK & WEST LLPSILICON VALLEY CENTER801 CALIFORNI STREETMOUNTAIN VIEW, CA 94041

Goods and services

ClassDescriptionStatusFirst use
006PREFABRICATED AND PORTABLE METAL CLAD BUILDINGS USED, NAMELY, AS WORK FORCE HOUSING, DORMITORIES, CAMP, KITCHENS, SCHOOLS, MOTELS, HOTELS, ACCOMMODATION FACILITIES, OFFICES, CLASSROOMS, RECREATIONAL COMPLEXES, OIL DRILL CAMPS, WASH CARS, LAUNDRY FACILITIES, AND OFFICESSECTION 8 - CANCELLED—
007SIMPLE CYCLE CATALYST SYSTEMS FOR REDUCING PARTICULATE EMISSIONS AND MINIMIZING AMMONIA SLIP IN GAS TURBINES USED IN POWER GENERATION FACILITIES COMPRISED OF COMBUSTION TURBINES NOT FOR LAND VEHICLESSECTION 8 - CANCELLED—
011TURBINE INTAKE AND EXHAUST SYSTEMS COMPRISED OF BYPASS STACKS, DIVERTER DAMPERS, GUILLOTINE DAMPER, VERTICAL SILENCER DUCTS, EXHAUST STACKS, BYPASS DIVERTERS, AND EXHAUST DIFFUSER/PLENUM; DIVERTER DAMPERS IN THE NATURE OF HEAT RECOVERY STEAM GENERATOR OF A GAS TURBINE BYPASS SYSTEM WHICH ALLOW WORKERS AT POWER GENERATION FACILITIES TO PERFORM MAINTENANCE TO THE HEAT RECOVERY SYSTEM WITHOUT ENDANGERING WORKERS TO HOT LETHAL GASES, BY DIVERTING GASES FROM THE HEAT RECOVERY STEAM GENERATORSECTION 8 - CANCELLED—
017INDUSTRIAL ACOUSTIC NOISE BARRIER UNITS FOR INDUSTRIAL FACILITIES FOR RETROFITTING EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, REGULATOR, METER AND PUMPING STATIONS, NAMELY, ACOUSTIC ROOFING PANELS, WALLS AND WALL BARRIER PANELS; INDUSTRIAL ACOUSTIC NOISE BARRIER SYSTEMS FOR INDUSTRIAL FACILITIES, FOR RETROFITTING EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, REGULATOR, METER AND PUMPING STATIONS, COMPRISED OF NOISE SILENCERS IN THE NATURE OF LAYERED ACOUSTICAL TILES, MODULAR ACOUSTICAL PANELS, ACOUSTICAL INSULATION BARRIER PANELS, ACOUSTICAL INSULATION FOR BUILDINGS, ACOUSTICAL EQUIPMENT ENCLOSURES, ACOUSTICAL MECHANICAL SYSTEMS, ACOUSTICAL DOORS AND WINDOWS; ACOUSTIC BUILDING VENTILATION, NAMELY, ACOUSTIC BUILDING HEATING, AIR CONDITIONING AND VENTILATION SYSTEMS, COMPRISED OF ACOUSTIC NOISE SILENCERS, MUFFLERS AND ACOUSTIC WALLS, NOISE AND VIBRATION DAMPENING MATERIALSSECTION 8 - CANCELLED—
019INDUSTRIAL ACOUSTIC NOISE BARRIER UNITS FOR INDUSTRIAL FACILITIES, FOR RETROFITTING OF EXISTING FACILITIES, FOR POWER GENERATION PLANTS, FOR COMPRESSOR, METER AND PUMPING STATIONS, NAMELY, NON-METAL DOORS AND WINDOWSECTION 8 - CANCELLED—
035BUSINESS PROJECT MANAGEMENT SERVICES RELATING TO POWER PLANTS, RADAR SITES, REMOTE AIRPORTS, WEATHER STATIONS AND MICROWAVE TOWERS; OPERATION OF BUSINESS FOR OTHERS, NAMELY, POWER PLANTS, RADAR SITES, REMOTE AIRPORTS, WEATHER STATIONS AND MICROWAVE TOWERS; BUSINESS MANAGEMENT OF CAMP SERVICES RELATING TO ACCOMMODATIONS, CATERING, HOUSEKEEPING AND JANITORIAL; TRANSPORTATION LOGISTICS SERVICES, NAMELY, ARRANGING THE TRANSPORTATION OF GOODS FOR OTHERS RELATING TO EQUIPMENT SUPPLIES; BUSINESS SERVICES, NAMELY, FACILITY AND MANAGEMENT SERVICES OF TECHNICAL OPERATIONS FOR FACILITIES, NAMELY, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN AND MILITARY AIRPORTS; BUSINESS MANAGEMENT AND OPERATION OF A BUSINESS FOR OTHERS, NAMELY, JOINT VENTURES AND ALLIANCE PROJECTS RELATING TO POWER PLANTS, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, REMOTE AIRPORTS, WEATHER STATIONS, MICROWAVE TOWERS, MODULAR AND PREFABRICATED BUILDINGS FOR TEMPORARY AND PERMANENT OCCUPANCY; PROCUREMENT, NAMELY, THE PURCHASE OF NOISE REDUCTION SYSTEMS FOR OTHERS; PROVIDING TECHNICAL INFORMATION IN THE FIELD OF BUILDING MANAGEMENT FOR MODULAR AND PREFABRICATED BUILDINGS VIA A GLOBAL NETWORK; PROVIDING TECHNICAL INFORMATION IN THE FIELD OF LOGISTICS MANAGEMENT FOR MODULAR AND PREFABRICATED BUILDING CONSTRUCTIONSECTION 8 - CANCELLED—
036PROPERTY MANAGEMENT SERVICES FOR FACILITIES, NAMELY, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN AND MILITARY AIRPORTS; FINANCIAL ASSET MANAGEMENT SERVICES FOR RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN AND MILITARY AIRPORTS; RENTAL AND LEASING OF MODULAR AND PREFABRICATED BUILDINGS FOR PERMANENT OCCUPANCYSECTION 8 - CANCELLED—
037MAINTENANCE AND REPAIR OF PROJECT FACILITIES INCORPORATED IN DEFENSE SYSTEMS, NAMELY, RADAR SITES, REMOTE AIRPORTS, WEATHER STATIONS AND MICROWAVE TOWERS; MAINTENANCE, CONSTRUCTION AND REPAIR SERVICES RELATING TO ELECTRONIC COMMUNICATION SYSTEMS, NAMELY, RADAR SITES AND CENTRAL MONITORING STATIONS FOR RADAR DATA, MICROWAVE TRANSMITTERS, RECEIVERS, POWER SUPPLIES AND TOWERS, SATELLITE GROUND STATIONS AND RADIO TRANSMITTERS AND RECEIVERS, CONSTRUCTION SITE SELECTION SERVICES; GENERAL CONSTRUCTION CONTRACTING SERVICES; CONSTRUCTION AND INSTALLATION OF FACILITIES AND SYSTEMS IN THE NATURE OF MODULAR AND PREFABRICATED BUILDINGS FOR TEMPORARY AND PERMANENT OCCUPANCY, POWER PLANTS, RADAR SITES, DEPLOYED MILITARY CAMPS, MINE SITES AND CAMPS, AND CIVILIAN, MILITARY AND REMOTE AIRPORTS, WEATHER STATIONS, MICROWAVE TOWERS, AND GAS TURBINE SYSTEMS AT POWER PLANTS; CONSTRUCTION, INSTALLATION, REPAIR AND MAINTENANCE OF MODULAR AND PREFABRICATED BUILDINGS; ENVIRONMENTAL SERVICES, NAMELY, HAZARDOUS WASTE CLEAN UP AND HAZARDOUS WASTE DISPOSAL; INSTALLATION OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS AND ACOUSTIC AND MODELING SURVEYING; INSTALLATION OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS; PROVIDING TECHNICAL INFORMATION ABOUT MODULAR AND PREFABRICATED BUILDING CONSTRUCTION VIA A GLOBAL NETWORK; PROVIDING TECHNICAL INFORMATION ABOUT INSTALLATION OF NOISE REDUCTION AND BUILDING ACOUSTICS VIA A GLOBAL NETWORKSECTION 8 - CANCELLED—
039TRANSPORTATION AND STORAGE OF FUELS; UTILITY SERVICES, NAMELY, PROVIDING WATER, AND SEWAGE SERVICES AND TRANSMISSION OF ELECTRICITY; TRANSPORTATION OF MODULAR AND PREFABRICATED BUILDINGSSECTION 8 - CANCELLED—
040CUSTOM MANUFACTURE TO THE ORDER AND SPECIFICATION OF OTHERS OF MODULAR AND PREFABRICATED BUILDINGS; SITE SERVICES, NAMELY, WATER TREATMENT FOR MODULAR BUILDINGS, PERMANENT MODULAR BUILDINGS, CAMPS AND WORKFORCE HOUSING; UTILITY SERVICES, NAMELY, GENERATION OF POWERSECTION 8 - CANCELLED—
042DESIGN AND ENGINEERING SERVICES RELATING TO ELECTRONIC COMMUNICATION SYSTEMS, NAMELY, RADAR SITES AND CENTRAL MONITORING STATIONS FOR RADAR DATA, MICROWAVE TRANSMITTERS, RECEIVERS, POWER SUPPLIES AND TOWERS, SATELLITE GROUND STATIONS AND RADIO TRANSMITTERS AND RECEIVERS, SCADA SYSTEMS AND ELECTRONIC COMMUNICATION SUPPORT SYSTEMS; CUSTOM DESIGN OF MANUFACTURED SHELTER SOLUTIONS FOR OTHERS, NAMELY, MODULAR AND PREFABRICATED BUILDINGS; TURNKEY SERVICES FOR OTHERS, NAMELY, DESIGN OF NOISE REDUCTION SYSTEMS; INDUSTRIAL DESIGN, DRAFTING, ENGINEERING, MATERIAL TESTING, MECHANICAL RESEARCH, AND TECHNICAL PROJECT STUDIES RELATING TO SILENCING ARTICLES AND STRUCTURES, NAMELY, LAYERED ACOUSTICAL ASSEMBLIES, MODULAR ACOUSTICAL PANEL PACKAGES, ACOUSTICAL BARRIERS, ACOUSTICAL BUILDINGS, ACOUSTICAL EQUIPMENT ENCLOSURES, ACOUSTICAL MECHANICAL SYSTEMS, ACOUSTICAL DOORS AND WINDOWS; DESIGN OF INTERIOR ACOUSTIC AND BUILDING ENCLOSURES, NAMELY, WALLS, DOORS, ROOFS AND WINDOWS; SITE SERVICES, NAMELY, FIELD ENGINEERING, INSPECTION AND TESTING OF MODULAR BUILDINGS, PERMANENT MODULAR BUILDINGS, CAMPS AND WORKFORCE HOUSINGSECTION 8 - CANCELLED—
043HOTEL SERVICES; RENTAL AND LEASING OF MODULAR AND PREFABRICATED BUILDINGS FOR TEMPORARY OCCUPANCYSECTION 8 - CANCELLED—
044EMERGENCY SERVICES, NAMELY, PROVIDING 24-HOUR RESPONSE CENTER OF EMERGENCY MEDICAL PERSONNEL AND EMERGENCY MEDICAL ASSISTANCESECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 8, 2021C8..CANCELLED SEC. 8 (6-YR)—
Mar 3, 2020REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Dec 17, 2018TMBNTTAB RELEASE CASE TO TRADEMARKS—
Dec 17, 2018CANTCANCELLATION TERMINATED NO. 999999—
Dec 17, 2018CANDCANCELLATION DENIED NO. 999999—
Jul 20, 2017ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 20, 2017REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 11, 2017PETCCANCELLATION INSTITUTED NO. 999999—
Apr 21, 2015CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Apr 21, 2015COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Mar 3, 2015R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 13, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 13, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 24, 2015CHPBPOST PUBLICATION AMENDMENT - ENTERED—
Jan 24, 2015APETASSIGNED TO PETITION STAFF—
Jan 20, 2015ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Jan 9, 2015EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Jul 8, 2014ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Jul 8, 2014PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 18, 2014NPUBNOTICE OF PUBLICATION—
Jun 13, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 30, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 15, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 25, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 24, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 24, 2014TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 13, 2013CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 12, 2013CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 4, 2013ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Oct 20, 2013PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Oct 7, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 2, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 12, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 12, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 9, 2013ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 25, 2013CNSIINQUIRY AS TO SUSPENSION MAILED—
Jun 25, 2013CNSISUSPENSION INQUIRY WRITTEN—
Jun 24, 2013RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Dec 18, 2012CNSLLETTER OF SUSPENSION MAILED—
Dec 18, 2012CNSLSUSPENSION LETTER WRITTEN—
Dec 14, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 14, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 12, 2012ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 18, 2012CNSIINQUIRY AS TO SUSPENSION MAILED—
Jun 18, 2012CNSISUSPENSION INQUIRY WRITTEN—
Jun 14, 2012RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Dec 14, 2011CNSLLETTER OF SUSPENSION MAILED—
Dec 13, 2011CNSLSUSPENSION LETTER WRITTEN—
Dec 1, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 1, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 1, 2011ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 2, 2011CNSIINQUIRY AS TO SUSPENSION MAILED—
Jun 1, 2011CNSISUSPENSION INQUIRY WRITTEN—
Jun 1, 2011RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jun 1, 2011ALIEASSIGNED TO LIE—
Nov 29, 2010CNSLLETTER OF SUSPENSION MAILED—
Nov 29, 2010CNSLSUSPENSION LETTER WRITTEN—
Nov 9, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 8, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 8, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 7, 2010CPRAPRIORITY ACTION MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
May 7, 2010CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Apr 30, 2010DOCKASSIGNED TO EXAMINER—
Feb 9, 2010MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Feb 8, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 4, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance