Drawing for C C

USPTO serial 77949146

C C

Reviewed by CopyMark Law Group

Reg. 3979079Status 710
Filing date
Status date
Registration date
Jun 14, 2011
Examiner
BELLO, ZACK
Law office
TMO LAW OFFICE 111

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with C C?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
011Air cleaning units; Air cleaning units containing an air filter, ultraviolet lights and a photocatalytic filter; Air conditioners; Air conditioners for vehicles; Air conditioning apparatus and installations; Air conditioning installations; Air conditioning units; Air cooling apparatus; Air filtering installations; Air filters for air conditioning units; Air filters for domestic use; Air purification units; Air purifiers; Air purifiers; Air purifying apparatus; Air purifying apparatus and machines; Air-conditioning apparatus; Air-conditioning apparatus and installations; Air-conditioning installations; Air-conditioning, air cooling and ventilation apparatus and instruments; Boilers for heating installations; Central air-conditioning installations; Components for air conditioning and cooling systems, namely, evaporative air coolers; Dampers, namely, control devices used in air ducts to regulate the flow of air; Furnace boilers; Gas water heaters; Gas water heaters; Geothermal-based HVAC units; Heating boilers; Heating systems composed primarily of tubes, pipes and manifolds through which warm or high temperature water circulates; Heating systems composed primarily of tubes, pipes and pre-assembled manifolds through which cold or low temperature water circulates; Heating systems for residential and commercial buildings comprised of boilers, valves, pipes, manifolds, solar panels, control panel, switches and electrical wire, all sold as a unit; Hot water heaters; Hot water tanks; Hot-water space heating apparatus; Hybrid water heater; Solar water heaters; Tankless water heaters; Water heatersSECTION 8 - CANCELLEDJun 18, 2008
037Air conditioning contractor services; Air duct cleaning services; Basement waterproofing; Boiler cleaning and repair; Building construction services; Building construction supervision; Building construction, remodeling and repair; Building maintenance and repair; Building sealing and caulking services; Electrical contracting; Electrical contractor services; Heating contractor services; Heating equipment installation and repair; Home energy assessment services for the purpose of determining home improvements needed to improve energy use and efficiency; HVAC contractor services; Installation and maintenance of solar energy based power plants; Installation and maintenance of solar thermal installations; Installation and repair of air conditioning apparatus; Installation and replacement service for heating, ventilating and air conditioning systems; Installation and replacement service for water heaters; Installation of geothermal energy based power plants; Installation, repair and maintenance of condensing apparatus, steam condensers, radiators for motors and engines, air reheaters, boiler tubes; Installation, repair and maintenance of heating equipment; Maintenance and repair of heating installations; Mechanical contractor services; Plumbing; Plumbing and gas and water installation; Plumbing contractor services; Plumbing services; Repair and installation services, namely, the installation of heating, cooling and environmental control systems primarily using solar energy, renewable energy resources and rainwater; Repair or maintenance of boilers; Repair or maintenance of gas water heatersSECTION 8 - CANCELLEDJun 11, 2008

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 27, 2022NCS8NOTICE OF CANCELLATION SEC. 8 EMAILED—
Jan 26, 2022C8.TCANCELLED SEC. 8 (10-YR)—
Jun 25, 2020PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Jun 25, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 15, 2020E89RTEAS SECTION 8 & 9 RECEIVED—
Jun 14, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 25, 2016NAS8NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED—
Jun 25, 20168.OKREGISTERED - SEC. 8 (6-YR) ACCEPTEDThe USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline.
Jun 25, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 14, 2016ES8RTEAS SECTION 8 RECEIVED—
Jun 14, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 14, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jun 14, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 7, 2011SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 6, 2011REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
May 4, 2011CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 4, 2011XAECEXAMINER'S AMENDMENT ENTERED—
May 4, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 4, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
May 4, 2011SNEASU-EXAMINER'S AMENDMENT WRITTEN—
Apr 21, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 21, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 21, 2011CNRTSU - NON-FINAL ACTION - WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 29, 2011SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 29, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Mar 19, 2011IUAFUSE AMENDMENT FILED—
Mar 19, 2011EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Sep 21, 2010NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jul 27, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 27, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 23, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 22, 2010ALIEASSIGNED TO LIE—
Jun 7, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 6, 2010DOCKASSIGNED TO EXAMINER—
Mar 9, 2010MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Mar 8, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 6, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance