Drawing for CREAFORM

USPTO serial 77961259

CREAFORM

Reviewed by CopyMark Law Group

Reg. 4030400Status 800Registered
Filing date
Status date
Registration date
Sep 27, 2011
Examiner
HAMMEL, LAURA A
Law office
GENERIC WEB UPDATE

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with CREAFORM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

James H. Johnson, Jr.

James H. Johnson, Jr. EVERSHEDS SUTHERLAND (US) LLP999 PEACHTREE STREET NE Suite 2300ATLANTA, GA 30309-3996UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009Optical measurement devices and instruments, namely, handheld self-positioning laser scanners, portable handheld laser scanners, laser scanners for industrial inspection, 3D scanning laser scanners, self-positioning 3D scanners specially adapted for products engineering, designing and development, portable high accuracy and high definition laser camera for scanning of solid object, self-positioning 3D scanner specially adapted for products engineering, designing and development in the aerospace, automotive, biomechanics, consumer products, education, heritage preservation and architecture and multimedia industries; Wireless portable coordinate-measuring machine (CMM) for inspection and reverse engineering of geometrical entitiesACTIVE—
040Consultation services in the field of custom lean manufacture of third party's machine and tooling assembly and production lineACTIVE—
041Training services in the operation of major metrology, reverse engineering, 3D inspection and digital data post -treatment software and equipmentACTIVE—
042Technical product research in the fields of inspection and adjustments of assemblies and sub-assemblies, issuance of conformity certification, first-article inspection and supplier quality inspection, inspection and alignment of industrial machines, automated inspection programming, large scale scanning, high definition surveying for as-built, topographic, detail, and engineering survey, 3D scanning, colors and texture scanning, post-treatment of data and digital files in generic CAD formats, 3D archiving, design and engineering turnkey projects, design of sheet metal, plastic or composite parts, design of pneumatic and hydraulic systems, 2D drawing, 3D modeling, geometric dimensioning and tolerancing, mechanical and industrial design and kinematics analysis, reverse engineering, mechanical design, creation of 2D plans from scan file, data preparation for stress analysis and digital stimulation and finite element analysis; consultation services in the field of product developmentACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 3, 2022NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Feb 3, 2022RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 3, 202289AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 3, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 26, 2021E89RTEAS SECTION 8 & 9 RECEIVED—
Sep 27, 2020REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Mar 14, 2018CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Mar 14, 2018COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Oct 6, 2017NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 6, 2017C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 6, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 7, 2017E815TEAS SECTION 8 & 15 RECEIVED—
Sep 27, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jun 9, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 9, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Sep 27, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 12, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 12, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 7, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 3, 2011ALIEASSIGNED TO LIE—
May 20, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 25, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 25, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 25, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Dec 16, 2010GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Dec 16, 2010GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 16, 2010CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 24, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 24, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 24, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 25, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 25, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 25, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 18, 2010DOCKASSIGNED TO EXAMINER—
Mar 22, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 20, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance