Drawing for FORTUM

USPTO serial 77961884

FORTUM

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
RICHARDS, SUSAN
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FORTUM?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Amy F. Divino

AMY F. DIVINO COZEN O'CONNOR277 PARK AVENEW YORK, NY 10172-0003UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001Automotive chemicals and their derivatives, namely, coolants, brake fluids, and antifreezes; chemicals used in refining and production of oil; chemical additives to motor fuels and solvents for use in paints, coatings and degreasing agentsACTIVE—
003Windscreen cleanersACTIVE—
004Gases, namely, butane, propane, liquefied petroleum gas and liquefied natural gas; coals; gasoline; diesel oils; light and heavy oils; aviation fuel; non-chemical additives to motor fuels; base oils for use in the manufacture of engine oils, gear oils and circulation oils; lubricants for engines; lubricant components, namely, paraffinic based oils, high viscosity index base oils, extra high viscosity index base oils, synthetic base oils; napthenic oils, namely, napthene used in process oils and hydraulic oils; specialty fuels for use in motors, lawnmowers, chain saws and outboard motorsACTIVE—
009Equipment for electrochemical storage of energy, namely, accumulators, batteries, dry fuel cells; electrical apparatus and instruments used in connection with electrochemical storage of energy, namely, battery rechargers; equipment for power conditioning and power conversion, namely, converters; electric storage batteries; electrical apparatus and instruments used in connection with storage batteries, namely, battery rechargers; electrical ductsACTIVE—
011Oil heating apparatus, electrical heating apparatus, gas heating apparatus, and central heating apparatus, namely, furnacesACTIVE—
036Services relating to the distribution of electricity, namely, brokerage of electricityACTIVE—
037Installation of electrical apparatus, installation and repair of heating apparatus and central heating apparatus; asphalting, laying of oil pipelines; covering, coating and maintenance of oil pipelines; regulation and repair of oils-burners; service station services; drilling of oil wells; construction and maintenance of nuclear power plants, hydro power plants, combined heat and power plants, heat production plants, waste disposal, processing and treatment plantsACTIVE—
039Services relating to distribution of electricity, namely, transmission of electricity; services relating to transport by land, air and water, namely, transportation of passengers and/or goods by boat, rail or truck; shipping of freight by land, air and sea; freighting and renting of ships; transfer of oil through pipelines; transmission of oil or gas through pipelines; distribution of energy; consultancy concerning the transmission and distribution of energyACTIVE—
040Generation of electricity; production of energy; municipal waste processing, namely, decontamination of nuclear waste; incineration of waste; consultancy concerning the production of energyACTIVE—
042Drawing up of expert technical opinions in connection with oil deposits; product development; consultancy concerning geographical surveys; oil prospecting; test, control and analysis of oil wells; geological estimation, geological prospecting; geological surveys; consultation services in the field of electrical engineering; design of computer network services for others in the oil and petroleum industries; website design services and computer consultation, namely, consultations in the field of information and data system services; testing services relating to production, transmission and distribution of energy for the purposes of certification; pipeline inspection services; engineering services for the construction of nuclear power plants, hydro power plants, combined heat and power plants, heat production plants; inspection of oil burnersACTIVE—
045Environmental protection services relating to industry, namely, reviewing standards and practices to assure compliance with environmental lawsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Mar 31, 2014MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Mar 31, 2014ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Sep 17, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Sep 16, 2013EX5GSOU EXTENSION 5 GRANTED—
Sep 13, 2013AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Aug 16, 2013EXT5SOU EXTENSION 5 FILED—
Aug 16, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 19, 2013EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Feb 17, 2013EX4GSOU EXTENSION 4 GRANTED—
Feb 15, 2013EXT4SOU EXTENSION 4 FILED—
Feb 15, 2013EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 3, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Aug 2, 2012EX3GSOU EXTENSION 3 GRANTED—
Jul 30, 2012EXT3SOU EXTENSION 3 FILED—
Jul 30, 2012EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 21, 2012EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jan 20, 2012EX2GSOU EXTENSION 2 GRANTED—
Jan 20, 2012AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 19, 2011EXT2SOU EXTENSION 2 FILED—
Dec 19, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 7, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jul 5, 2011EX1GSOU EXTENSION 1 GRANTED—
Jul 5, 2011EXT1SOU EXTENSION 1 FILED—
Jul 5, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Feb 22, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Dec 28, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 28, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 20, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 19, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 18, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 18, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 18, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 18, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 18, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 18, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 26, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 11, 2010PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 29, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 29, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 28, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jun 28, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jun 28, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Jun 28, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 20, 2010DOCKASSIGNED TO EXAMINER—
May 19, 2010AMPXPRELIMINARY/VOLUNTARY AMENDMENT - ENTERED—
May 19, 2010ALIEASSIGNED TO LIE—
Apr 26, 2010PARITEAS VOLUNTARY AMENDMENT RECEIVED—
Mar 23, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 22, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions