Drawing for HABDANK

USPTO serial 77967937

HABDANK

Reviewed by CopyMark Law Group

Reg. 4168372Status 710
Filing date
Status date
Registration date
Jul 3, 2012
Examiner
FOSDICK, GEOFFREY A
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with HABDANK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Nicolette R. Hudson

Nicolette R. Hudson Frost Brown Todd LLC3300 Great American Tower, 301 E. 4th StCincinnati, OH 45202UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal reinforcement materials for building purposes; cladding of metal for construction and building; metal structures for mounting solar panels; frameworks of metal for building; metal frameworks; metal posts; metal poles; metal tubes and masts of metal; metal profiles and frameworks for arranging devices on and in walls, ceiling and other surfaces; metal clamps, mounting components and connectors of metal for building and installation, namely, screws, nuts, rivets, clasps; prefabricated metal buildings; transportable prefabricated metal buildings, all above mentioned building materials for use in connection with rooftop photovoltaic solar systems and solar thermal systemsSECTION 8 - CANCELLEDJul 26, 2010
007Equipment for motorized adjustment of photovoltaic components and plants according to the sun position other than for land vehicles, namely, servo motors, servo-valvesSECTION 8 - CANCELLEDJul 26, 2010
009Photovoltaic equipment, namely, photovoltaic modules for the generation of electricity; electric control and regulating apparatus for solar power plants and photovoltaic power plants, namely, electronic controls for motors, electric control devices for heating and energy management for inner operation procedures as well as position controlling of collectors and modules; computer programs for development and project planning of photovoltaic power plants as well as for calculating the energy output of photovoltaic power plantsSECTION 8 - CANCELLEDJul 26, 2010
011Solar collectors; solar heating modules, namely, solar heat collection panels; photovoltaic equipment, namely, photovoltaic power plants for the generation of electricitySECTION 8 - CANCELLEDJul 26, 2010
037Installation, maintenance and repair of installations, machines and components for regenerative energy production; roofing services; construction management and construction supervisionSECTION 8 - CANCELLEDJul 26, 2010
042Architectural and engineering services; consulting services for others in the field of design, planning, and implementation project management of renewable energy; construction drafting; technical planning of solar energy based power plants; technological consultancy and engineering in the field of photovoltaic energy; structural engineering design services; surveyingSECTION 8 - CANCELLEDJul 26, 2010

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 8, 2019C8..CANCELLED SEC. 8 (6-YR)—
Jul 3, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Jul 3, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 1, 2012SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
May 31, 2012REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
May 30, 2012CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 30, 2012SUPCSTATEMENT OF USE PROCESSING COMPLETE—
May 21, 2012AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Apr 25, 2012IUAFUSE AMENDMENT FILED—
Apr 25, 2012EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Nov 10, 2011EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Nov 8, 2011EX1GSOU EXTENSION 1 GRANTED—
Nov 8, 2011EXT1SOU EXTENSION 1 FILED—
Nov 8, 2011EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Oct 31, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 27, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
May 10, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 9, 2011CORVREVIEW OF CORRESPONDENCE COMPLETE—
May 4, 2011APETASSIGNED TO PETITION STAFF—
May 3, 2011EPPATEAS POST PUBLICATION AMENDMENT RECEIVED—
Mar 15, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Mar 15, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Feb 10, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 7, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 7, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Feb 7, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Feb 7, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 7, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 4, 2011ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 28, 2011PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jan 20, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 20, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 19, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 19, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 12, 2011ALIEASSIGNED TO LIE—
Dec 22, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 24, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 24, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 24, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2010DOCKASSIGNED TO EXAMINER—
Mar 31, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Mar 27, 2010NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance