Drawing for INDUSTRIAL IT CERTIFIED

USPTO serial 78016779

INDUSTRIAL IT CERTIFIED

Reviewed by CopyMark Law Group

Status 608
Filing date
Status date
Registration date
—
Examiner
BERK, STEVEN R
Law office
FILE REPOSITORY (FRANCONIA)

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with INDUSTRIAL IT CERTIFIED?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Materials and components composed of metal for oil and gas drilling and production both onshore, offshore and subsea, and for refineries, chemical and petrochemical plants and for the pulp and paper industries, namely wellhead equipment namely metal drill pipes, casings and tubings, metal pipeconnectors and couplings, exhaust manifolds for engines, and fluid control equipment namely, valves and chokes; metallic distribution cabinets, cable cases for metal cable wire, metal oil-troughs for electrical transformersACTIVE—
007Electric motors and electric generators for machines; compressors for machines, hydraulic turbines; turbochargers for internal combustion engines; industrial robotsACTIVE—
009Apparatus and instruments for measuring, analyzing, recording, controlling and regulating physical quantities, chemical properties, and industrial processes namely, flowmeters, scanners, sensors, actuators, automatic valves, transmitters for signals, temperature and/or pressure, positioners, electric converters, recorders, gas and liquid analyzers; water, gas, electricity and energy meters; computers, microprocessors; computer operating programs; electrical and computer cables, conductors, wires; electrical equipment, namely transformers; switchgear, circuit breakers, contactors, plugs, sockets, surge arrestors; electrical substation automation equipment comprised of controllers for substation environment and protection performance, namely, controllers for current protection, earth fault protection, voltage protection, frequency protection, thermal/energy protection, line/cable distance protection, line/cable differential protection, transfer differential protection, busbar differential protection, generator protection, motor protection, capacitor bank protection, railway supply protection, software for use in an electrical substation, namely, software for setting protection parameters and providing an interface to an operator, software for analyzing faults, software for retrieving a disturbance record, software for allowing remote retrieval of disturbance data, software for monitoring and controlling a substation electrical network, software for remotely controlling a substation by supervisory control and data acquisition (SCADA), software for providing an interface to an operator, software for configuring and tuning a substation control application, software for analyzing data, namely software for analyzing faults data, fault location data, software for managing maintenance of a substation; and power system protective relays; reactive power compensators; electric capacitors, electric reactors, electric converters and inverters; and semiconductor elementsACTIVE—
011Ventilation equipment and fans, namely, high temperature fans for circulating gases or clean air in combustion furnaces, annealing furnaces, steel mills for circulating exhaust gases, gas cleaning equipment corrosive or erosive environments, mechanical draft fans for the power or utility industry, axial fans for use in power generation and in industrial plants, paint finishing systems, namely, spray booths, surface preparation and pre-treatment machines, ovens, paint robots, and atomizersACTIVE—
016Journals, publications namely, a magazine addressed to enterprises that produce automobiles, use continuous or batch processes in their manufacturing and generate, transmit and distribute electrical power, manuals, and technical literature namely trade journals and newsletters on the subject of process automationACTIVE—
036Financial services, financial and monetary affairs, namely, securing financing and loans for enterprises that use continuous and batch manufacturing in their manufacturing; leasing of apparatus and instruments for measuring, analyzing, recording, controlling and regulating physical quantities, chemical properties, and industrial processes namely, scanners, computers, microprocessors; computer operating programs; substation automation equipment and power system protective relays; ventilation equipment and fans, namely, high temperature fans for circulating gases or clean air in combustion furnaces, annealing furnaces, steel mills for circulating exhaust gases, gas cleaning equipment corrosive or erosive environments, mechanical draft fans for the power or utility industry, axial fans for use in power generation and in industrial plants; paint finishing systems, namely, spray booths, surface preparation and pre-treatment machines, ovens, paint robots, and atomizers; and industrial robots; providing financing services for project and tradeACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 3, 2002PR.WPETITION TO REVIVE WITHDRAWN—
Jul 16, 2002MAILPAPER RECEIVED—
Jul 2, 2002ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Apr 26, 2002PETRPETITION TO REVIVE-RECEIVED—
Apr 12, 2002MAILPAPER RECEIVED—
Oct 4, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 29, 2001CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 3, 2001CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 5, 2000DOCKASSIGNED TO EXAMINER—
Dec 5, 2000DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance