USPTO serial 78180975
Reviewed by CopyMark Law Group
Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Philadelphia, PA
Philadelphia, PA
Philadelphia, PA
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Timothy D. Pecsenye
Timothy D. Pecsenye Blank Rome LLPONE LOGAN SQUARE8th FloorPHILADELPHIA, PA 19103-6998| Class | Description | Status | First use |
|---|---|---|---|
| 009 | protective safety apparel and safety gear, namely, safety pants, safety vests, hard hats, hard hat nape protectors and nape liners, and specialty liners for hard hats, head wear, aprons, dust masks, welding jackets, welding gloves, vests, visors, and back support belts, safety harnesses, shock absorbing lanyards for fall purposes, protective suits, protective glasses, protective gloves, work gloves, latex utility gloves, vinyl gloves, boots; hearing protection, namely ear muffs, foam ear plugs and corded ear plugs; safety equipment, namely, warning flags, safety flags, barricade tape, warning/barricade safety tape, warning barrier fences, measuring markers, safety ropes, warning tapes, reflective warning tape, hazard stripe tape, traffic barricades, and barricade lights, welding electrodes, and welding torches | ACTIVE | Dec 31, 1987 |
| 035 | mail order catalog services featuring safety pants, safety vests, hard hats and hard hat accessories including nape protectors, nape liners, specialty liners, protective suits, protective glasses, protective gloves, work gloves, latex utility gloves, vinyl gloves, boots, rebar caps, first aid kits, industrial burn kits, perimeter markers, spray paint, barricade tape, safety tape, warning flags, safety flags, sand bags, jute, warning barrier fences, silt fences, head wear, coveralls, aprons and dust masks, welding safety accessories, vests, visors, back support belts, hearing protectors, namely ear muffs, foam plugs, corded ear plugs, blood borne pathogens protection lists, eye wash stations, gravity eye wash stations, safety harnesses, shock absorbing lanyards, measuring tapes, measuring markers, safety rope, warning tapes, reflective warning tape, hazard stripe tape, steel fence posts, geotextiles, namely, ground covers used for liner protection, drainage systems, asphalt overlay, railroad stabilization, erosion control, roadway stabilization and waste management, erosion control grounds covers, blankets, filters, and barriers, traffic barricades, barricade lights; on-line retail store services and electronic catalog services featuring safety pants, safety vests, hard hats and hard hat accessories including nape protectors, nape liners, specialty liners, protective suits, protective glasses, protective gloves, work gloves, latex utility gloves, vinyl gloves, boots, rebar caps, first aid kits, industrial burn kits, perimeter markers, spray paint, barricade tape, safety tape, warning flags, safety flags, sand bags, jute, warning barrier fences, silt fences, head wear, coveralls, aprons and dust masks, welding safety accessories, vests, visors, back support belts, hearing protectors, namely ear muffs, foam plugs, corded ear plugs, blood borne pathogens protection lists, eye wash stations, gravity eye wash stations, safety harnesses, shock absorbing lanyards, measuring tapes, measuring markers, safety rope, warning tapes, reflective warning tape, hazard stripe tape, steel fence posts, geotextiles, namely, ground covers used for liner protection, drainage systems, asphalt overlay, railroad stabilization, erosion control, roadway stabilization and waste management, erosion control grounds covers, blankets, filters, and barriers, traffic barricades, barricade lights | ACTIVE | Dec 31, 1987 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 12, 2024 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Nov 12, 2024 | RNL2 | REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Nov 12, 2024 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Nov 12, 2024 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 12, 2024 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Aug 24, 2023 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Dec 18, 2013 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Dec 18, 2013 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Dec 18, 2013 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Dec 18, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 10, 2013 | 89AF | REGISTERED - COMBINED SECTION 8 (10-YR) & SEC. 9 FILED | — |
| Dec 10, 2013 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Sep 10, 2010 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Sep 10, 2010 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 24, 2010 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Aug 24, 2004 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jun 1, 2004 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 12, 2004 | NPUB | NOTICE OF PUBLICATION | — |
| Feb 26, 2004 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 12, 2004 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 12, 2004 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 10, 2004 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 2, 2003 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 2, 2003 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 14, 2003 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 8, 2003 | DOCK | ASSIGNED TO EXAMINER | — |