Drawing for IMAGINATION AT WORK

USPTO serial 78190324

IMAGINATION AT WORK

Reviewed by CopyMark Law Group

Reg. 3133667Status 800Renewal
Filing date
Status date
Registration date
Aug 22, 2006
Examiner
FERRAIUOLO, DOMINIC
Law office
GENERIC WEB UPDATE

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with IMAGINATION AT WORK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*

Plus Government fees of $850

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Cindy M. Zelson

Cindy M. Zelson General Electric Company901 Main Avenue (Trademarks: 801-4)Corporate Trademark OperationNorwalk, CT 06851

Goods and services

ClassDescriptionStatusFirst use
009ELECTRONIC, NUCLEAR, INDUSTRIAL AND LABORATORY TESTING, MEASURING, COMPUTING AND CONTROL INSTRUMENTS, APPARATUS AND PARTS THEREOF; COMPUTERS; COMPUTER SOFTWARE; ELECTRICAL ARRESTERS; BATTERIES; ELECTRICAL BUSWAYS; ELECTRICAL CAPACITORS; ELECTRICAL FUSES; FIBER OPTICS; LIGHTING CONTROLS; LEDS; LED SIGNALS; ELECTRICAL METERS; ELECTRICAL RELAYS; ELECTRICAL TIMERS; ELECTRICAL RESISTORS; ELECTRICAL SENSORS; ELECTRICAL SOLENOIDS AND ELECTRICAL LIMIT SWITCHES; ELECTRICAL CONTROLLERS; PROGRAMMABLE LOGIC CONTROLLERS; ELECTRIC LIGHTING CONTROLS; LEDS, NAMELY LIGHT EMITTING DIODES; ELECTRIC STARTERS; ELECTRIC FULL-VOLTAGE MANUAL STARTERS; ELECTRIC REDUCED VOLTAGE STARTERS; ELECTRIC PUSH MOTORS; ELECTRIC TERMINAL BLOCKS; ELECTRIC MOTOR CONTROLS; ELECTRIC LIGHTING PANELBOARDS; ELECTRIC POWER PANELBOARDS; ELECTRICAL WIRING FIXTURES; ELECTRIC ENERGY CELLS; FUEL CELLS; CIRCUIT BREAKERS AND DISCONNECTS; CIRCUIT BREAKER LOAD CENTERS; CIRCUIT CLOSERS; CIRCUIT INTERRUPTERS; COMMUTATORS; CONTACTORS; CURRENT RECTIFIERS; CURRENT LIMITERS; ELECTRIC CONTACTS; ELECTRIC COLLECTORS; ELECTRIC CONNECTORS; ELECTRIC CONTROLLERS; ELECTRIC INDUCTORS; ELECTRICITY DISTRIBUTION BOARDS AND BOXES; ELECTRICITY DISTRIBUTION CONSOLES; ELECTRICITY SWITCHBOARDS AND SWITCHBOXES; ELECTRIC POWER SUPPLIES; TRANSFORMERS; MOTOR CONTROL; LIGHTING PANELBOARDS; POWER PANELBOARDS; ELECTRICAL WIRES, CABLES, CORDS AND CONDUCTORS; LIGHTING ARRESTORS; ELECTRICAL RESISTORS; VOLTAGE REGULATORS; COMPUTER MOUSE PADS, AND COMPONENT PARTS OF ALL THE FOREGOINGACTIVENov 28, 2004

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 22, 2025REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 31, 2016NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Oct 31, 2016RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Oct 31, 201689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Oct 31, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 12, 2016TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Aug 17, 2016E89RTEAS SECTION 8 & 9 RECEIVED—
Aug 22, 2015REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Sep 4, 2012NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Sep 4, 2012C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Sep 4, 2012APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 14, 2012E815TEAS SECTION 8 & 15 RECEIVED—
Aug 22, 2006R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 6, 2006REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Jun 30, 2006ALIEASSIGNED TO LIE—
May 30, 2006ALIEASSIGNED TO LIE—
May 23, 2006CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
May 20, 2006SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Mar 9, 2006IUAFUSE AMENDMENT FILED—
Mar 9, 2006EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Feb 14, 2006EX3GSOU EXTENSION 3 GRANTED—
Feb 14, 2006EXT3SOU EXTENSION 3 FILED—
Feb 14, 2006EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 30, 2005EX2GSOU EXTENSION 2 GRANTED—
Aug 11, 2005EXT2SOU EXTENSION 2 FILED—
Aug 11, 2005EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Mar 7, 2005EX1GSOU EXTENSION 1 GRANTED—
Feb 17, 2005EXT1SOU EXTENSION 1 FILED—
Feb 17, 2005EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Aug 17, 2004NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 25, 2004PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 5, 2004NPUBNOTICE OF PUBLICATION—
Apr 9, 2004CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 9, 2004GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 6, 2004ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Dec 1, 2003CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 17, 2003GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 29, 2003GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 17, 2003CFITCASE FILE IN TICRS—
Jul 14, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 14, 2003EMRVEMAIL RECEIVED—
Jul 1, 2003GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 11, 2003DOCKASSIGNED TO EXAMINER—

Frequently asked questions

Related guidance