Drawing for AKER KVÆRNER

USPTO serial 78204359

AKER KVÆRNER

Reviewed by CopyMark Law Group

Reg. 3930604Status 710
Filing date
Status date
Registration date
Mar 15, 2011
Examiner
KIM, SOPHIA SUJIN
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with AKER KVÆRNER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey H. Kaufman

JEFFREY H KAUFMAN Oblon, McClelland, Maier & Neustadt, L.L.P.1940 Duke StreetAlexandria, VA 22314-3451UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Oil and gas production machinery, apparatus and plant, being parts, equipment, systems or other apparatus or oil and gas well machinery, namely, onshore and offshore hydrocarbon separation machines, water injection machines, pumping machines, gas compression machines, gas conversion machines, and mass transfer machines for the extraction, processing and exporting of oil and natural gas, for accommodation facilities, for safety systems and safety facilities, for drilling and workover systems, for topdrive systems, for equipment for tide and wave-motion compensation, for drawworks, for pipe handling equipment, for mud handling systems for removing and treating drill cuttings and reconditioning the drilling fluid, for well intervention systems, for workover risers, for downhole tools and deployment systems, and for workover operations; oil and gas production machinery, apparatus and plant, being parts, equipment, systems or other apparatus or oil and gas well machinery, namely, production riser machines, drilling riser machines, service/workover riser machines, riser connector machines and riser handling machines; gantrys, tether hangoff and bottom connectors, winches, windlasses, and cable handling machines; chain stopping machines for use in equipping and building sea-going vessels and oil and gas drilling production rigs/platforms; oil and gas production and well machinery, apparatus and plant being machine parts, machine equipment, machine systems or other machine apparatus for offshore loading between a sea-going vessel and an oil and gas installation, or another sea-going vessel, namely, chain stopping machines, winches, power-operated hose reels, hose cranes, hose conveyors, and hose tray conveyors; oil and gas well machinery, apparatus and plant being parts, equipment, systems or other apparatus or oil and gas production machinery, namely, wellheads, Christmas trees, subsea pumping, compression and processing systems comprising separation machines, crude oil conditioning machines, water treatment machines and/or injection machines, pumping compression machines, heat exchange mass transfer machines for use in subsea components, products and systems for the extraction, processing and exporting of oil and natural gas; oil and gas well machinery, apparatus and plant being parts, equipment systems or other apparatus or oil and gas well machinery, namely, wireline machines, logging machines, surface power and control machines, and tractor tools for functions such as scale removal, milling, side-tracking, sand-bailing, perforating and plug-setting for use in downhole components, products and systems for the extraction, processing and exporting of oil and natural gas; machinery, apparatus and plant being parts, equipment, systems or other apparatus for production of cellulose pulp, namely, chip feeding machines, digester machines, delignification machines, bleaching machines, dewatering machines, washing machines, evaporation machines, recausticising machines; pumps, namely, medium consistency fluidizing pump, centrifugal pumps, line shaft pumps and multiphase pumps used for crude oil transportation, firefighting and seawater systems, lift pumps, lift caissons, booster pumps, control and distribution pumps, subsea compressor pumps for gas/liquid separation, liquid pumping and gas compressor pumps for the pressure boosting of natural gasSECTION 8 - CANCELLED—
009Controllers and instrumentation for drilling and workover systems, these systems comprising drilling derricks for topdrive systems, for equipment for tide and wave-motion compensation, for drawworks, for pipe handling equipment, for mud handling systems, for removing and treating drill cuttings and reconditioning the drilling fluid, for well intervention systems, for workover risers, for downhole tools and deployment systems, and for workover operations; oil and gas production machinery, apparatus and plant, being parts, equipment, systems or other apparatus for safety systems and safety facilities comprising smoke and fire detector devices and systems, firewater pump and/or distribution devices and systems comprising fire extinguishers, smoke and fire detectors, chemical composition for suppression of fires, powder, foam, water mist and Carbon Dioxide storage and distribution systems; electric line cable for use in oil and gas well machinery, apparatus and partsSECTION 8 - CANCELLED—
012Ships, fast boats, sea-going vessels, and structural parts thereof for use in equipping, building, maintaining and fitting out of sea-going vessels, ships and other fixed and floating sea-going vessels for the storage and transportation of gas; tractor machines; wireline tractor machinesSECTION 8 - CANCELLED—
017Non-metallic gas, oil and water loading hoses for offshore loading between a sea-going vessel and an oil and gas installation, or another sea-going vesselSECTION 8 - CANCELLED—
037Building construction; repair and installation services relating to offshore oil and gas production plants and onshore industrial facilities including plants for the processing of waste water and the processing and manufacturing of nuclear materials, pharmaceuticals, metals, polymers and chemicals, oil refining and onshore oil and gas processing; construction, modification, repair and installation of pulp and paper plants and of chemical recovery, pollution control and energy generating energy plants for use in the chemical, pulp and paper industries; construction, modification, repair and installation of power plants; technical consultancy in the fields of oil and gas drilling and pumping, namely, automated drilling and pumping, fixed and floating concrete platform/marine structure construction, downhole drilling and pumping, reservoir construction, subsea drilling and pumping, fixed and floating oil and gas platform construction, hulls and jackets construction, and riser systems construction; technical consultancy in the field of custom shipbuildingSECTION 8 - CANCELLED—
039Technical consultancy in the fields of oil and gas storage, distribution and transportation of oil and gasSECTION 8 - CANCELLED—
040Technical consultancy in the fields of oil and gas production and processing, fuel reprocessing and pumping, and treatment and process of ferrous and non-ferrous metals and oresSECTION 8 - CANCELLED—
042Scientific and industrial research in the field of production and exploitation of oil and gas; engineering; computer programming; preparation, updating and maintenance of computer programs; technical consultancy in connection to pharmaceutical technology research and development; technology consultancy in the fields of oil and gas drilling and pumping technology, namely, fixed and floating concrete platform/marine structure technology, downhole technology, reservoir technology, subsea technology, fixed and floating oil and gas platform technology; technology consultancy in the fields of fuel reprocessing and pumping technologySECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 20, 2017C8..CANCELLED SEC. 8 (6-YR)—
Mar 15, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Feb 11, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Mar 15, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 4, 2011DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Feb 3, 2011AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Feb 2, 2011IUCNNOTICE OF ALLOWANCE CANCELLED—
Feb 2, 2011D1BRTEAS DELETE 1(B) BASIS RECEIVED—
Jan 18, 2011NOAMNOA E-MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Nov 23, 2010NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Nov 23, 2010PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 19, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 19, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 19, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Oct 19, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 19, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 19, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 10, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 10, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 10, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 10, 2010GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 10, 2010GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 10, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 18, 2010ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Feb 13, 2010PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jan 30, 2010PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 28, 2010CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 28, 2010XAECEXAMINER'S AMENDMENT ENTERED—
Jan 28, 2010GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Jan 28, 2010GNEAEXAMINERS AMENDMENT E-MAILED—
Jan 28, 2010CNEAEXAMINERS AMENDMENT -WRITTEN—
Nov 19, 2009ACECAMENDMENT FROM APPLICANT ENTERED—
Nov 19, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 12, 2009MAILPAPER RECEIVED—
May 11, 2009GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
May 11, 2009GECGACTION GRANTING REQ FOR RECON E-MAILED—
May 11, 2009CNCFACTION CONTINUING A FINAL - COMPLETED—
Mar 12, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 12, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 12, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 12, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 12, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 12, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 11, 2008EXPTEXPARTE APPEAL TERMINATED—
Aug 8, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Aug 1, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jul 19, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 16, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 29, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 29, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 27, 2008ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 11, 2008GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Jan 11, 2008GECGACTION GRANTING REQ FOR RECON E-MAILED—
Jan 11, 2008CNCFACTION CONTINUING A FINAL - COMPLETED—
Oct 31, 2007ACECAMENDMENT FROM APPLICANT ENTERED—
Oct 31, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 26, 2007MAILPAPER RECEIVED—
May 22, 2007ALIEASSIGNED TO LIE—
Apr 26, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 26, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 26, 2007RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Aug 8, 2006RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Feb 3, 2006GNSLLETTER OF SUSPENSION E-MAILED—
Feb 3, 2006CNSLSUSPENSION LETTER WRITTEN—
Nov 21, 2005EXPIEX PARTE APPEAL-INSTITUTED—
Nov 21, 2005JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Nov 18, 2005EXAFEXPARTE APPEAL RECEIVED AT TTAB—
May 13, 2005GECGACTION GRANTING REQ FOR RECON E-MAILED—
May 13, 2005CNCFACTION CONTINUING FINAL - COMPLETED—
Apr 1, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Mar 17, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 17, 2005MAILPAPER RECEIVED—
Mar 15, 2005DOCKASSIGNED TO EXAMINER—
Jan 7, 2005DOCKASSIGNED TO EXAMINER—
Sep 17, 2004GNCFCONTINUATION OF FINAL REFUSAL E-MAILED—
Sep 17, 2004CNCFACTION CONTINUING A FINAL - COMPLETED—
Aug 26, 2004ACECAMENDMENT FROM APPLICANT ENTERED—
Aug 26, 2004ALIEASSIGNED TO LIE—
Aug 17, 2004CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 17, 2004MAILPAPER RECEIVED—
Feb 17, 2004CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 19, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 17, 2003CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 7, 2003GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 1, 2003DOCKASSIGNED TO EXAMINER—
May 19, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 19, 2003MAILPAPER RECEIVED—
Apr 24, 2003CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 24, 2003MAILPAPER RECEIVED—

Frequently asked questions

Related guidance