USPTO serial 78222088
IMES
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Apr 5, 2005
- Examiner
- HOLTZ, ALLISON
- Law office
- GENERIC WEB UPDATE
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with IMES?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
Aberdeen, AB23 8JX, GB
Aberdeen, AB23 8JX, GB
Aberdeen, AB23 8JX, GB
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Ronald E. Shapiro
Ronald E. Shapiro Shapiro and Silverstein PLLC11350 Random Hills Road, Suite 740Fairfax, VA 22030UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Apparatus and instruments for monitoring, measuring and testing load bearing and load lifting structures and devices, namely, strain gauges, stress gauges, load sensors, temperature sensors, vibration sensors, rotation sensors, heat sensors, pressure sensors, current sensors, torque sensors; electrical and electronic monitoring and measuring apparatus and instruments, namely, electronic and electrical strain gauges, stress gauges, load sensors, temperature sensors, vibration sensors, rotation sensors, heat sensors, pressure sensors, current sensors, torque sensors; computer software for use in monitoring, measuring, and testing load bearing and load lifting structures and devices; data logging and data processing equipment, namely, computer hardware; computer software for use in data logging and data processing | SECTION 8 - CANCELLED | — |
| 037 | rental of load testing apparatus and instruments; rental of lifting equipment; installation, maintenance and repair of load testing, load bearing and load lifting equipment; maintenance and repair of plant, machinery and instrumentation | SECTION 8 - CANCELLED | — |
| 042 | Monitoring, measuring and testing services for load bearing and load lifting structures and devices; structural inspection and verification services for quality control and safety approval; testing, analysis and evaluation of the goods of others for the purpose of certification; provision of load measuring, data logging and electronic tracking services for use in logistics management of equipment for monitoring, measuring and testing the structural integrity of load bearing and load lifting structures and devices; design engineering; technical consulting in the field of engineering; project engineering, and project management services, namely, design, construction and installation of computer and mechanical systems for monitoring, measuring and testing the structural integrity of load bearing and load lifting structures and devices | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by IMES Group Limited
- Other trademarks owned by IMES Group Limited
- Other trademarks owned by IMES Group Limited
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named IMES
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 17, 2025 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Apr 5, 2024 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Nov 21, 2014 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Nov 21, 2014 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Nov 21, 2014 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Nov 20, 2014 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 3, 2014 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Oct 19, 2010 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Oct 18, 2010 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 13, 2010 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Apr 5, 2005 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 11, 2005 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 22, 2004 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 3, 2004 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Oct 29, 2004 | ALIE | ASSIGNED TO LIE | — |
| Oct 25, 2004 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 21, 2004 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Oct 7, 2004 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 7, 2004 | PAPER RECEIVED | — | |
| Apr 9, 2004 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 8, 2004 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 8, 2004 | PAPER RECEIVED | — | |
| Sep 5, 2003 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 3, 2003 | DOCK | ASSIGNED TO EXAMINER | — |