Drawing for TRANSFORMING IDEAS INTO REALITY

USPTO serial 78398435

TRANSFORMING IDEAS INTO REALITY

Reviewed by CopyMark Law Group

Reg. 3019935Status 800Registered
Filing date
Status date
Registration date
Nov 29, 2005
Examiner
SHOSHO II, ERNEST
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection. Calendar the next Section 8 and 9 deadline in 10 years and maintain monitoring.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with TRANSFORMING IDEAS INTO REALITY?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Christopher P. Sherwin

Christopher P. Sherwin The Webb Law Firm420 Fort Duquesne Boulevard, Suite 1200One Gateway CenterPittsburgh, PA 15222

Goods and services

ClassDescriptionStatusFirst use
037Land development and planning, namely, site selection and design, land use studies, economic feasibility, and site planning, community and regional planning, planning and engineering approval/permitting, land surveying and construction layout, code impact assessment and permit acquisition, facilities planning and infrastructure design, and landscape architecture and streetscape design; and construction services, namely, construction engineering, monitoring and inspection, [ constructability reviews, ] [ materials testing, ] [ critical path method (CPM) scheduling and reporting, ] innovative construction management, and utility construction coordinationACTIVE—
042Environmental engineering, sciences and remediation, namely, hydrogeologic and hydraulic studies and design, ground-water modeling and monitoring, water and wastewater treatment systems, flood control and coastal studies, solid and hazardous waste management design, industrial hygiene and safety compliance, environmental impact statements and assessments, wetland delineation, watershed and stream restoration, threatened and endangered species analysis, gas and electric transmission lines sighting, geographic information systems (GIS) mapping and information management; transportation planning and design, namely, bridge, highway, and roadway design, bridge inspection and rehabilitation, transportation planning and transit studies, airport facilities design and reconstruction, traffic studies and traffic control plans, eminent domain consultation, public and private agency coordination, and NEPA/Section 4f studies and Section 106 studies; geotechnical and structural engineering, namely, dam rehabilitation and design, transmission line design, geologic studies and subsurface explorations, subsidence studies and remediation, mining engineering [ and mine fire abatement, ] vibration, seismic, and structural reliability studies, slope stabilization analysis and design, foundation research and design, earth and rock retaining structure design, and structural rehabilitation; and cultural resources and historic preservation, namely, historic architectural surveys and context studies, comprehensive historic preservation plans, geographic information systems predictive modeling, prehistoric, historical and urban archaeology, Phase I, II, and III surveys and mitigation, public outreach programs, geomorphology, pedology, and soils surveys, and National Register inventories and evaluationsACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 25, 2026NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Feb 25, 2026RNL2REGISTERED AND RENEWED (SECOND RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 25, 202689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 23, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 26, 2025E89RTEAS SECTION 8 & 9 RECEIVED—
Nov 29, 2024REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 1, 2019ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 1, 2019REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 8, 2016NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Feb 8, 2016RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Feb 8, 201689AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Feb 8, 2016APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 23, 2015E89RTEAS SECTION 8 & 9 RECEIVED—
Dec 29, 2011NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Dec 29, 2011C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 29, 2011APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 14, 2011E815TEAS SECTION 8 & 15 RECEIVED—
Nov 29, 2005R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 6, 2005PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 17, 2005NPUBNOTICE OF PUBLICATION—
May 26, 2005PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 17, 2005ALIEASSIGNED TO LIE—
May 11, 2005CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 5, 2005TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 21, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 21, 2005TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 31, 2004GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2004CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 31, 2004DOCKASSIGNED TO EXAMINER—
Apr 16, 2004NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance