USPTO serial 78402480
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
Tokyo, JP
TOKYO, JP
Tokyo, JP
NIPPON STEEL NISSHIN CO., LTD.
TOKYO, JP
Tokyo, JP
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Brian B. Darville
Brian B. Darville Oblon, McClelland, Maier & Neustadt, L.L.P.1940 Duke StreetAlexandria, VA 22314UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Irons and steels [; metal materials for building or construction, namely, stair treads, fasteners for casement windows, guardrails, wall linings, pilings, gratings, tunneling materials, fences, shutters, tiles, steel frames for buildings, shelf boards, hinges, handrails, gabions of steel wire, ceiling boards, ceiling decorations, electric poles, door knockers, gutters, gutter brackets, sliding door pulleys, sliding door rollers, doors, door handles, door closers, pillars, wainscottings, beams, fire retarding doors, floor pavings, windows, window knobs, window frames, window pulleys, gates, floor boards, louver doors, and laths; metal joinery fittings; metal hardware, namely, metal key rings, casters, nails, wedges, metal washers, nuts, screws, tacks, plugs, bolts and rivets; prefabricated building assembly kits of metal; reservoirs of metal; metal pulleys; springs and valves; industrial packaging containers of metal; loading and unloading pallets of metal; metal turn-tables for load handling; metal traversers for load handling; artificial fish reefs of metal; metal moldings for forming cement products; transportable greenhouses of metal for household use; paint spraying booths of metal, namely, booths made of metal for paint spraying, used to protect against the scattering of sprayed paint; poultry cages of metal; metal keys for locks; road signs of metal; cotter pins; metal junctions for pipes; metal flanges; anchors; mooring bitts of metal; mooring bollards of metal; anvils; metal swage blocks; wire nets and gauzes; wire ropes; metal chains for dogs; water tanks of metal for household purposes; tool boxes of metal; money boxes of metal; metal stepladders and ladders; metal nameplates and door nameplates; towel dispensers of metal; hat-hanging hooks of metal; letter boxes of metal; metal safes; upright sign boards of metal; non-precious metal gravestones and metal tomb plaques; buckles of metal, namely, buckles for fastening and tightening automobile seat belts, for securing loads on the platform of a truck, and for securing pillars and beams; crampons; diving platforms of metal; rock pitons; stirrups of metal; and spurs] | ACTIVE | Oct 24, 2004 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 19, 2026 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Feb 17, 2021 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Sep 11, 2019 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Jul 21, 2017 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Jul 21, 2017 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Jul 21, 2017 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Jul 21, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 14, 2017 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jun 19, 2016 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Jan 29, 2015 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 22, 2013 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Jun 22, 2013 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Jun 21, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 7, 2013 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Sep 5, 2007 | PRA7 | REGISTERED - SEC. 7 REQUEST ABANDONED | — |
| Aug 20, 2007 | PLGL | ASSIGNED TO PARALEGAL | — |
| Jul 18, 2007 | AMD7 | SEC 7 REQUEST FILED | — |
| Jul 18, 2007 | PAPER RECEIVED | — | |
| Jun 19, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 13, 2007 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Apr 13, 2007 | ALIE | ASSIGNED TO LIE | — |
| Mar 23, 2007 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Mar 15, 2007 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Dec 18, 2006 | IUAF | USE AMENDMENT FILED | — |
| Dec 18, 2006 | PAPER RECEIVED | — | |
| Jul 6, 2006 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Jun 7, 2006 | EXT1 | SOU EXTENSION 1 FILED | — |
| Jun 7, 2006 | PAPER RECEIVED | — | |
| Dec 20, 2005 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Sep 27, 2005 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 7, 2005 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 9, 2005 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 3, 2005 | ALIE | ASSIGNED TO LIE | — |
| May 31, 2005 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 12, 2005 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| May 4, 2005 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 4, 2005 | PAPER RECEIVED | — | |
| Nov 10, 2004 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 10, 2004 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 8, 2004 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 4, 2004 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Jun 4, 2004 | PAPER RECEIVED | — | |
| Apr 23, 2004 | NWAP | NEW APPLICATION ENTERED | — |