USPTO serial 78430419
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Warrington, Cheshire, GB
SOUTHAMPTON, HAMPSHIRE, GB
SOUTHAMPTON, HAMPSHIRE, GB
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Dana L. Tangren
DANA L TANGREN WORKMAN NYDEGGER60 E SOUTH TEMPLE STE 1000EAGLE GATE TWRSALT LAKE CITY, UT 84111| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Uranium, uranium oxide, plutonium, plutonium oxide; radioactive elements and isotopes for scientific and industrial use; fuel for nuclear reactors; gadolinium; boron; cadmium; boric acid; hafnium; neutron poisons, namely, boric acid, hafnium; neutron moderating materials, namely, distilled water, heavy water, graphite, beryllium, hydrocarbons, polymers; chemicals used in industry and science; chemicals used in industry and science for reducing the energy of neutrons passing through them for the purpose of assisting the detection of neutrons, namely neutron moderators | SECTION 8 - CANCELLED | — |
| 004 | Nuclear fuels; fuels | SECTION 8 - CANCELLED | — |
| 009 | Emergency warning lights and emergency evacuation lights; scientific, optical, weighing, measuring, checking, monitoring, surveying, detecting, assaying, and information gathering apparatus and instruments for use in the construction, operation, maintenance, decommissioning and repair of industrial plants, power stations, nuclear repositories, nuclear fuel producing facilities, nuclear fuel re-processing facilities, nuclear material storage facilities and waste storage facilities for use in scientific research, industrial research, research and development of new products for others and material testing; laboratory monitoring, surface monitoring and contamination determination apparatus and instruments for use in the fields of radioactivity, fission production, health physics, and alpha particle, beta particle and gamma emission detection and monitoring, for use in the imaging, assaying and monitoring of nuclear materials, plutonium, uranium, waste containing plutonium and uranium, and nuclear materials used in isotopic identification, spatial determination, and radioactive materials identification, for further use in conducting tomographic investigations, segmented gamma detection, radiometric detection, density determination and differential peak absorption detection and monitoring, namely, alpha detectors, beta detectors, gamma detectors, neutron detectors, ion detectors, scintillators, scintillation probes, dosimeters, radiation shields, collimators, neutron moderators, laboratory furniture in the nature of rotatable platforms, lifting platforms, and weighing platforms, pan and tilt mountings, tripods for cameras, electric wire and cables, fiber optics, amplifiers for signals arising from detectors, electronic digital signal processors, audible and visible radiation detection alarms, power supplies, photographic cameras, video cameras, range finders; keyboards and display screens; computers and computer operating software sold as a integral component of the aforesaid goods; computers and computer software for use in the construction, operation, maintenance, decommissioning and repair of industrial plants, power stations, nuclear repositories, nuclear fuel producing facilities, nuclear fuel re-processing facilities, nuclear material storage facilities and waste storage facilities; computers and computer software for processing images, graphics and text for use in scientific research, industrial research, research and development of new products for others and material testing; alarms for the detection of nuclear materials, smoke and fire; smoke detectors; amplifiers; anodes; weighing apparatus and instruments, namely, balances and scales; bar code readers, photographic cameras, cathode ray tubes; electric control panels; laboratory apparatus, namely, crucibles; metal detectors; distance measuring apparatus, namely, range finders; dosimeters, ear plugs not for medical purposes, computer hardware for the remote control of industrial machines; electromagnetic coils; radioactivity exposure meters; furnaces for laboratory experiments; lasers, not for medical purposes; pressure gauges, pressure indicators; printers for use with computers; probes for scientific purposes, namely, probes for testing integrated circuits; tripods for cameras and scientific instruments; calculators; protective clothing, namely footwear, headwear, helmets, masks; protective devices against x-ray, gamma ray, beta particle and alpha particles, namely, radiation shields and screens made of lead and concrete; radiological screens for industrial purposes; pre-recorded video cassettes, compact discs, DVD's and magnetic data carriers all featuring information, data and instruction on the construction, operation, maintenance, decommissioning and repair of industrial plants, power stations, nuclear repositories, nuclear fuel producing facilities, nuclear fuel re-processing facilities, nuclear material storage facilities and waste storage facilities, relating to scientific research, industrial research, research and development of new products for others and material testing; computer accessories, namely, mouse pads, mice, printers | SECTION 8 - CANCELLED | — |
| 011 | Installations for processing nuclear fuel and nuclear moderating material and nuclear waste, namely, nuclear fuel manufacturing plants, nuclear fuel recycling plants, nuclear waste processing plants; nuclear reactors; heaters, for industrial use, furnaces, steam generators, industrial dryers for gases, air, nuclear materials, powders; air conditioning units; air filtering installations, namely, air filters for industrial installations, water filters for industrial installations, air, water, liquid or gas filters for removing nuclear materials; industrial boilers; cooling appliances and installations, namely, heat exchanges and refrigeration machines; drying apparatus and installations, namely, dehumidifiers; ventilating fans and blowers, namely, for moving air or gases within a process plant for handling nuclear materials; gas scrubbers, gas generators for industrial installations, heat exchanges, lamps, microwave power generators for industrial heating and melting uses; roasting apparatus, namely industrial ovens and industrial roasters powered by oil and gas; flash lights, pocket flash lights; electric fans, namely, electric air and gas moving fans | SECTION 8 - CANCELLED | — |
| 037 | Construction, maintenance, and repair of buildings, industrial plants, nuclear repositories, nuclear fuel producing facilities, nuclear fuel re-processing facilities, nuclear material storage facilities and waste storage facilities; installation and repair of alarms for the detection of nuclear materials, smoke and fire; cleaning of buildings, exterior and interior; construction, installation and repair of heating and power generation equipment; installation, maintenance and repair of machinery for industrial plants, power stations, nuclear repositories, nuclear fuel producing facilities, nuclear fuel re-processing facilities, nuclear material storage facilities and waste storage facilities; pipeline construction and maintenance | SECTION 8 - CANCELLED | — |
| 039 | Transportation, packaging for transportation and storage of materials, namely, nuclear fuel, nuclear fuel rods, nuclear fuel assemblies, spent nuclear fuel, spent nuclear fuel rods, spent nuclear fuel assemblies, reprocessed nuclear materials, uranium, uranium oxide, plutonium, plutonium oxide, radioactive elements and isotopes and nuclear waste | SECTION 8 - CANCELLED | — |
| 040 | Treatment of nuclear fuel, spent nuclear fuel, fission products, neutron poisons, neutron moderating materials and waste; purification of air and other gases; decontamination of buildings, plant and land affected by chemicals, nuclear materials, nuclear waste, fission products, radioactive materials; processing and re-processing of nuclear fuels and of materials used in the manufacture of nuclear fuels; production of energy and electricity; vitrification of materials, namely encasing chemicals, nuclear materials, nuclear waste, fission products, radioactive materials in vitreous material or glass; providing information in the field of material treatment; material treatment, namely, galvanization, plating, lamination, casting, tempering and refining of materials for use in nuclear power generation, for use in nuclear reactors, for use in producing or assembly or storing or transporting or disassembling or reprocessing or encapsulation or treating nuclear fuel, spent nuclear fuel, neutron poisons, neutron moderating materials, nuclear waste or fission products | SECTION 8 - CANCELLED | — |
| 041 | Education and training services, namely, providing courses, lectures, seminars, conferences and instructional talks in the fields of nuclear fuel, nuclear waste, the nuclear fuel cycle and apparatus, instruments and processes used therein | SECTION 8 - CANCELLED | — |
| 042 | Scientific and industrial research; research and development of new products for others; material testing; facility decommissioning, namely, engineering services relating to the closure and termination of operations for industrial plants, nuclear repositories, nuclear fuel producing facilities, nuclear fuel re-processing facilities, nuclear material storage facilities and waste storage facilities; providing technical and scientific information in the fields of producing, refining, manufacturing, reprocessing and storing nuclear fuel | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 14, 2015 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Jan 13, 2009 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 28, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Oct 8, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Sep 20, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 20, 2008 | ALIE | ASSIGNED TO LIE | — |
| Sep 20, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 30, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Aug 29, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 29, 2008 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 20, 2008 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| May 9, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 9, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 9, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 5, 2008 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 28, 2008 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Apr 12, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 10, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 10, 2008 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 10, 2008 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 10, 2008 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 10, 2008 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 10, 2008 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Mar 28, 2008 | ISIR | WITHDRAWN FROM ISSUE - TQR/NON-ATTY REQUEST | — |
| Mar 19, 2008 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Mar 19, 2008 | DP1B | 1(B) BASIS DELETED; PROCEED TO REGISTRATION | — |
| Mar 14, 2008 | IUCN | NOTICE OF ALLOWANCE CANCELLED | — |
| Mar 14, 2008 | FAXX | FAX RECEIVED | — |
| Nov 21, 2007 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Nov 16, 2007 | ASGN | AUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP | — |
| Nov 13, 2007 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 21, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 1, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| May 16, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 16, 2007 | ALIE | ASSIGNED TO LIE | — |
| Apr 27, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 27, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 27, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 27, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 20, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 15, 2006 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 15, 2006 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 3, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| May 5, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 11, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 11, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 11, 2005 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 11, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 20, 2005 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 11, 2005 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 11, 2005 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 10, 2005 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 10, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 6, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 11, 2004 | NWAP | NEW APPLICATION ENTERED | — |