Drawing for VAPORTECH

USPTO serial 78446872

VAPORTECH

Reviewed by CopyMark Law Group

Reg. 3259963Status 710
Filing date
Status date
Registration date
Jul 10, 2007
Examiner
JACKSON, STEVEN W
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with VAPORTECH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Carolyn Walters; Lorraine Pinsent; Kimberley Cunningham

Kimberley A. Cunningham Bennett Jones LLP3200 TELUS House, 10020 - 100 StreetEdmonton, AB, T5J0N3CANADA

Goods and services

ClassDescriptionStatusFirst use
007Natural gas compression units used for vapor recovery and fugitive gas collection and compression, condensate liquids collection and handling, booster gas compression and flare and vent gas compression all used for the collection and transportation of natural gas and natural gas liquids; Plunger lift systems and related equipment comprising a wellhead lubricator, receiver, arrival sensor, wellhead chambering, sold ring plungers, pad plungers, brush plungers, element sealed plungers, downhole bumper springs and associated equipment and peripherals sold together as a unit; gas and oil well optimization equipment, namely, wellhead piping, connectors and wireline retrieval tools designed specifically for plunger lift; low friction heavy oil rod-pumping equipment for use in primary heavy production; electronic submersible progressive cavity pumping equipment for use in relation to oil, gas and water wells; Artificial lift systems, namely downhole mechanical pumps and electric submersible pumps that use either the natural energy of a producing well or external power to cause the device to lift oil or water from wells; and gas recovery compression systems, namely, gas compression units designed to recover natural gas from land fills and recover fugitive emissions in chemical plantsSECTION 8 - CANCELLED—
009Computer modeling software to predict and optimize gas and oil well production; computer modeling software to track gas and oil well productionSECTION 8 - CANCELLED—
037Installation, and field servicing of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals for oilfield, gas/oil processing plant and refinery applications; Installation, and field servicing, of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals, used primarily for recovery of fugitive emissions from storage tanks, pressurized and non-pressurized vessels, dehydrator stills, treaters, separators, and tanks; Installation, and field servicing of oilfield production tools installed on surface wellheads and at the bottom of producing oil and gas wells to enhance and optimize production; Field services, repair and maintenance services on oil and gas wells; Installation of low horsepower field booster compressors; Installation, and field servicing of Artificial Lift systems to lift oil and water from wells; Field services, repair and maintenance on Artificial Lift systems; and Evaluation, installation, and servicing of compressor packages and systems designed to recover natural gas from land fills and recover fugitive emissions in chemical plantsSECTION 8 - CANCELLED—
040Construction of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals for oilfield, gas/oil processing plant and refinery applications; Construction of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals, used primarily for recovery of fugitive emissions from storage tanks, pressurized and non-pressurized vessels, dehydrator stills, treaters, separators, and tanks; Construction of oilfield production tools installed on surface wellheads and at the bottom of producing oil and gas wells to enhance and optimize production; Construction of low horsepower field booster compressors; Construction of Artificial Lift systems to lift oil and water from wells; and construction of compressor packages and systems designed to recover natural gas from land fills and recover fugitive emissions in chemical plants, all to the order and specification of othersSECTION 8 - CANCELLED—
042Engineering and design of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals for oilfield, gas/oil processing plant and refinery applications; Engineering and design, of compressor packages and systems, namely, a compressor, engine, cooling systems for pressurized gas and liquids, process piping and spooling, pressure vessels, electrical and instrument process controls, floor and structural steel skid, building enclosure and associated peripherals, used primarily for recovery of fugitive emissions from storage tanks, pressurized and non-pressurized vessels, dehydrator stills, treaters, separators, and tanks; Evaluation of refinery and oilfield applications to determine the need and specification for the wares described herein, including the re-design of pre-existing competitive systems that are not functioning according to requirements; Design and design consulting services with respect to the design and supply of complex gas compression and liquid handling equipment, consultation on general arrangement, equipment recommendations, P and ID review, piling layout, process flows and material/equipment selection materials that comprise a compressor unit; Engineering and design of oilfield production tools installed on surface wellheads and at the bottom of producing oil and gas wells to enhance and optimize production; Troubleshooting services on oil and gas wells; Design of low horsepower field booster compressors; Design and design consulting services with respect to the design and supply of well optimization and production equipment, including consultation on equipment recommendations, production and operating techniques and material/equipment selection; Engineering and design of Artificial Lift systems to lift oil and water from wells; Troubleshooting on Artificial Lift systems; and Engineering, design, and trouble shooting of compressor packages and systems designed to recover natural gas from land fills and recover fugitive emissions in chemical plantsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 14, 2014C8..CANCELLED SEC. 8 (6-YR)—
Feb 22, 2010TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 10, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 18, 2007ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Jan 25, 2007ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Jan 2, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 13, 2006NPUBNOTICE OF PUBLICATION—
Nov 11, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 9, 2006ALIEASSIGNED TO LIE—
Nov 7, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 1, 2006XAECEXAMINER'S AMENDMENT ENTERED—
Oct 31, 2006GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 31, 2006CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 23, 2006ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Oct 16, 2006PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Sep 23, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 22, 2006ALIEASSIGNED TO LIE—
Sep 19, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 31, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 22, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 22, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 28, 2006TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 24, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 24, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 24, 2006ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 14, 2006PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jun 21, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 16, 2006ALIEASSIGNED TO LIE—
Jun 12, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 24, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 17, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 17, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 11, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 11, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 17, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 7, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 7, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 20, 2005GRMLCORRESPONDENCE E-MAILED—
Oct 20, 2005CNSLSUSPENSION LETTER WRITTEN—
Oct 6, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Sep 27, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 27, 2005TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 23, 2005GNSLLETTER OF SUSPENSION E-MAILED—
Aug 23, 2005CNSLSUSPENSION LETTER WRITTEN—
Jul 21, 2005ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 7, 2005CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 7, 2005TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 6, 2005ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 6, 2005REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 10, 2005GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 10, 2005CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 10, 2005DOCKASSIGNED TO EXAMINER—
Jul 13, 2004NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance