USPTO serial 78571348
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Amy E. Carroll
AMY E CARROLL DRINKER BIDDLE & REATH LLP1500 K ST NW STE 1100WASHINGTON, DC 20005-1209UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys, namely, carbon, ferritic and austenitic steels in tubular and plate form for use in further manufacture; metal building materials, namely, structural steelwork, roofing and cladding materials, namely, girders, roofing sheets and metal cladding for construction or building; non-electric cables and wires of common metal; ironmongery, namely, stairways, ladders, handrails, floor grating, support steelwork, hangers, brackets, cable and pipe work support racks; small items of metal hardware, namely, metal gas dampers for furnaces, pipes and tubes of metal; metal parts for all the aforesaid goods, namely, nuts, bolts, plates and support fittings; metal seals; doors of metal; manually operated metal valves | SECTION 8 - CANCELLED | — |
| 007 | Coal grinding machines; coal handling machines; coal feeding machines; soot blowers; machine tools for cutting, milling, bending, drilling, smoothing, boring, pressing, grinding, tapping and straightening; motors and engines for fans, pumps, valves and dampers; machine coupling and transmission components, namely, motor couplers for gearboxes for fans, pumps, valves and dampers; electrical components, namely, motors for pumps and fans; electric generators; electric industrial power generators; emission control devices, namely, low NOx combustion units; de NOx Catalyst, NOx auto catalytic reduction units; sox reduction and removal units; reduction equipment for oxides of nitrogen, namely, de NOx Catalyst and NOx auto catalytic reduction units; machine parts, namely, apparatus and installations for use in the reduction of nitrogen oxides, namely, de nox catalyst, nox auto catalytic reduction units; welding machines; mechanical seals; machine parts, namely, baffles, soot blowers, cyclones, scrubbers, separator devices, ferrules and piping; water pumps for power stations; gas and air compressors | SECTION 8 - CANCELLED | — |
| 009 | Automatic valves and switches; thermocouples, relays, control units for controlling water and steam flow through a boiler to limit the emission of pollutants, flame management sensors and controls; electrical circuits for flame management systems; electrical circuits for soot blower control systems; electrical circuits for temperature and pressure monitoring and control systems; electrical circuits for valve, pump and damper control systems; electrical circuits for water level, coal feed, emission measuring, emission control, air flow and air temperature control units; electrical flame management controllers; electrical soot blower controllers; electrical temperature and pressure monitors and controllers; electrical valve, pump and damper controllers; electrical water level monitors; electrical coal feed monitors; electrical emission monitors; electrical emission controllers; electrical air flow and air temperature controllers; electrical water level controllers; electrical water flow controllers; electrical flue gas controllers; ash handling controllers; steam flow controllers; switches for electric lights; electrical cabling for lights; electrical sockets for electric lights; motor switchgear | SECTION 8 - CANCELLED | — |
| 011 | Apparatus for lighting, heating, steam generating, refrigerating, drying, ventilating and water supply, namely, electrical lighting fixtures and steam taps; steam generators; heat recovery steam generators; boilers; burners; furnaces; pressure vessels, namely, vessels for holding, collecting or containing steam or water; boiler vessels; steam valves; apparatus and installations for heating, namely, electrical trace heating units, steam trace heating units, gas air-heaters and steam air-heaters; apparatus and installations for power generation, namely, water conditioning units, coal combustion units, steam generation units; heaters; air filters; feed water storage tanks; treatment vessels, namely, water conditioning vessels; apparatus and installations for carrying out chemical processes, namely, water purification and water treatment units; apparatus and installations for use in the reduction of nitrogen oxides and not being parts of machines, namely, burners, de nox catalyst, nox auto catalytic reduction units; air heaters; steam generators; steam industrial power generators; fans for boilers; oil burners / gas burners for use in reduction of nitrogen oxides | SECTION 8 - CANCELLED | — |
| 035 | Advertising for others, namely, providing print advertising for others in the field of technical publications in the field of energy; business management of company projects for others; contract management for others; business administration for others; procurement, namely, purchasing industrial power plant parts for others; arranging contracts for others; business management services, namely, managing logistics, reverse logistics, supply chain services, supply chain visibility and synchronization, supply and demand forecasting and product distribution processes for others; provision of office management services for others; procurement, namely, purchasing fuel for others; project management services, namely, activities related to the execution of contracts for steam boilers or steam generators or other related plant and equipment; contract energy management services; industrial plant management services; energy audit services; energy auditing services; energy price comparison services; energy usage management; industrial plant commissioning services; industrial plant operation services for others; analyzing and compiling data for measuring the performance of industrial plants; business efficiently advice in the field of industrial plant performance optimization; procurement, namely, purchasing of steam boilers, steam generators and all associated and related components thereof for others; operational support services to industrial plants, namely, monitoring industrial plants for the purpose of efficiency | SECTION 8 - CANCELLED | — |
| 037 | Building construction, namely, erection of steam generators and other component equipment including steel structure, pressure vessels, pumps, fans, ducting, walls, control rooms and other facilities, building cladding, insulation, pipe work and other coal handling, storage and milling equipment; repair services, namely, the repair of damaged equipment on steam generators and all their ancillary equipment; installation services, namely, the installation, or repair of steam generators and all their ancillary equipment; maintenance, and enhancement of industrial plants; repair services, namely, the re-installation, or repair of steam generators and all their ancillary equipment; maintenance services, namely, the maintenance of steam generation plants and all related ancillary equipment; industrial plant retrofitting services; industrial plant rehabilitation services; repair and maintenance of rotating equipment; demolition services; rental of construction, repair and installation equipment; excavation; plumbing services; safe maintenance supervision; supervision of construction; valve leak sealing | SECTION 8 - CANCELLED | — |
| 039 | Utility services, namely, the transmission of electricity; transmission of oil and gas through pipelines | SECTION 8 - CANCELLED | — |
| 040 | Treatment of materials, namely, the welding, joining, cutting and heating of material forming steel structures, pressure vessels, steam generators, ducting and other equipment on steam generators; custom manufacturing services for the assembly and construction of steam generators, pressure vessels, pipe work, coal milling equipment, ducting, burners and other equipment associated with steam boilers and steam generating plants; machining services for cutting, milling, bending, drilling, smoothing, boring, pressing, grinding, tapping or straightening of steel and other materials; waste treatment services; nuclear decontamination services; welding services; energy production services; custom manufacture of pressure containment boxes and vessels; water chemistry services, namely, water treatment | SECTION 8 - CANCELLED | — |
| 042 | Scientific and technological services and research and design relating thereto, namely, the engineering, design, research, investigation, testing and development of steam boilers and all related components, including burners, pressure vessels, pipe work, collectors and other vessels and emission control equipment; industrial analysis and research services, namely, the investigation, testing and development of steam boilers and all related components, including burners, pressure vessels, pipe work, collectors and other vessels and emission control equipment; design and development of computer hardware and software, namely, the creation of computer programs for the design and engineering of steam boilers and generators; legal services related to the operation of a company and the execution of contracts awarded to a company; assessment of industrial plants to determine how many years of service they can provide, for the purposes of planning and management of energy supply; design services, namely, undertaking engineering design activities related to steam boilers or steam generators and all related components and equipment on electricity or steam generating power plants; environmental impact assessment services; emission monitoring services; emission control services; feasibility study services; engineering services, namely, engineering activities related to the design, research, testing, investigation and development of steam boilers, steam generators or other related plant and equipment; research and development services, namely, testing, investigation, engineering, modeling on computer or hardware, of steam boilers, steam generators and all related plant, components and equipment; testing services, namely, the investigation of the operation, performance or condition of metals, materials, machinery, plant or other equipment to ensure or discover the life expectancy or condition of such metals, materials, machinery, plant or other equipment; metallurgical services, namely, the testing, investigation or analysis of metals; engineering services; design for others in the field of industrial plant design; industrial plant inspection services; industrial plant survey services | SECTION 8 - CANCELLED | — |
| 045 | Reviewing practices to determine compliance with environmental laws; safety assessment services; safety risk assessment services; operational support services to industrial plants, namely, monitoring industrial plants for the purpose of worker safety, regulatory compliance and efficiency; radiological survey services and radiological protection services for the purpose regulatory compliance | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 3, 2017 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Mar 29, 2011 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 11, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 11, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 9, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 9, 2010 | ALIE | ASSIGNED TO LIE | — |
| Nov 17, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 17, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 17, 2010 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 17, 2010 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 17, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 14, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 13, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 13, 2010 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 13, 2010 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 13, 2010 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 13, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 13, 2010 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Mar 5, 2010 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Feb 22, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 17, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 14, 2010 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 13, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 13, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jul 13, 2009 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jul 13, 2009 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 13, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 13, 2009 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 12, 2009 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 12, 2009 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 12, 2008 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 12, 2008 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 12, 2008 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 21, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 21, 2008 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Nov 21, 2008 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Nov 21, 2008 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Nov 21, 2008 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Nov 20, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 20, 2008 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| May 21, 2008 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| May 21, 2008 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| May 21, 2008 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 20, 2008 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 20, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 19, 2008 | ERSI | TEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED | — |
| Nov 19, 2007 | GNS2 | NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED | — |
| Nov 19, 2007 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Nov 19, 2007 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| May 17, 2007 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| May 17, 2007 | CNSL | SUSPENSION LETTER WRITTEN | — |
| May 17, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 17, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 17, 2007 | ALIE | ASSIGNED TO LIE | — |
| Apr 25, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 25, 2006 | GNSI | INQUIRY TO SUSPENSION E-MAILED | — |
| Oct 25, 2006 | CNSI | SUSPENSION INQUIRY WRITTEN | — |
| Oct 25, 2006 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Apr 25, 2006 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Apr 25, 2006 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Apr 4, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 20, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 20, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 19, 2005 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 19, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 15, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Mar 2, 2005 | NWAP | NEW APPLICATION ENTERED | — |