Drawing for RIGSAFE

USPTO serial 78627640

RIGSAFE

Reviewed by CopyMark Law Group

Reg. 3219453Status 710
Filing date
Status date
Registration date
Mar 20, 2007
Examiner
GAYNOR, BARBARA ANNE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with RIGSAFE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

HERBERT DUBNO

HERBERT DUBNO KARL F ROSS PC5676 RIVERDALE AVE STE 310BRONX (RIVERDALE), NY 10471-0900UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
009MEASURING, SIGNALING AND CONTROL DEVICES FOR DRILLING AND PRODUCTION PLATFORMS IN THE OIL AND NATURAL GAS INDUSTRIES, NAMELY, ACCELEROMETERS AND SENSORS FOR THE DETECTION OF THE OPERATING CONDITIONS OF THE MONITORED EQUIPMENT ON THE RIG NAMELY ROTATIONAL SPEED, POWER CONSUMPTION, TEMPERATURES AND TORQUE, DATA COLLECTORS, DATA PROCESSORS, PERSONAL COMPUTERS AND SOFTWARE FOR CONDITION MONITORING PURPOSES FOR MONITORING WEAR, LOAD AND PROCESS PARAMETERSSECTION 8 - CANCELLED—
035APPOINTMENT SCHEDULING SERVICES FOR THE MAINTENANCE OF DRILLING EQUIPMENT, NAMELY PUMPS, GENERATORS AND DRIVESSECTION 8 - CANCELLED—
037INSTALLATION, MAINTENANCE AND REPAIR OF MONITORING DEVICES FOR DRILLING AND PRODUCTION PLATFORMS IN THE OIL AND NATURAL GAS INDUSTRIESSECTION 8 - CANCELLED—
040ASSEMBLY OF MONITORING DEVICES FOR DRILLING AND PRODUCTION PLATFORMS IN THE OIL AND NATURAL GAS INDUSTRIESSECTION 8 - CANCELLED—
042CONDITION MONITORING OF EQUIPMENT ON DRILLING AND PRODUCTION PLATFORM IN THE OIL AND NATURAL GAS INDUSTRIES TO INSURE EQUIPMENT AVAILABILITY AND TO AVOID FAILURES DUE TO EQUIPMENT WEAR; MAINTENANCE ASSESSMENT OF THE PERFORMANCE AND RELIABILITY OF ACCELEROMETERS AND SENSORS FOR THE DETECTION OF THE OPERATING CONDITIONS OF THE MONITORED EQUIPMENT ON THE RIG NAMELY ROTATIONAL SPEED, POWER CONSUMPTION, TEMPERATURES AND TORQUE, DATA ACQUISITION EQUIPMENT AND PERSONAL COMPUTERS WITH SOFTWARE FOR CONDITION MONITORING PURPOSES; ENGINEERING SERVICESSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 25, 2013C8..CANCELLED SEC. 8 (6-YR)—
Feb 7, 2011ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jan 19, 2011ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jan 12, 2011ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Dec 29, 2010ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Dec 15, 2010ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Mar 20, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 2, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 13, 2006NPUBNOTICE OF PUBLICATION—
Nov 13, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 3, 2006ALIEASSIGNED TO LIE—
Oct 28, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 27, 2006ACECAMENDMENT FROM APPLICANT ENTERED—
Sep 25, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 25, 2006MAILPAPER RECEIVED—
Jul 31, 2006CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 31, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2006ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 7, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 7, 2006MAILPAPER RECEIVED—
Dec 9, 2005CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 9, 2005CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 8, 2005DOCKASSIGNED TO EXAMINER—
May 17, 2005NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance