USPTO serial 78642497
GRIDPOINT INTELLIGENT ENERGY MANAGEMENT
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Nov 20, 2007
- Examiner
- RINGLE, JAMES W
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
Need help with GRIDPOINT INTELLIGENT ENERGY MANAGEMENT?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Owner
WASHINGTON, DC
WASHINGTON, DC
WASHINGTON, DC
Equinox Energy Solutions, Inc.
Washington, DC
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Steven J. Wadyka, Jr.
Steven J. Wadyka, Jr. Greenberg Traurig, LLP1750 Tyson BoulevardSuite 1200McLean, VA 22102Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Distributed power generation products, namely, inverters for transforming DC current into AC current and AC current into DC current; Uninterruptible power supply products and equipment namely, batteries, namely, lead acid batteries, nickel-metal hydride batteries, lithium batteries, sodium-metal chloride batteries, flywheels, compressed air storage units and capacitors for grid connected customers; charge controllers, control system comprised of local user interface displays with networked control and dispatching ability; energy monitoring circuits with predictive scheduling and control algorithms; safety-related circuits for energy management; peak shaving electric circuits; electric/lightning surge protectors; remote communications and monitoring circuits namely, Ethernet, WiFi, 3G cellular or telephone connectivity and circuit breakers; temperature monitoring equipment, namely, equipment monitoring the temperature of batteries, charge controllers and inverters and energy monitoring circuits, power control relays, and circuit breakers | SECTION 8 - CANCELLED | Aug 31, 2006 |
| 037 | Installation and maintenance of power equipment namely, distributed generators, surge protectors and energy conditioners for use in distributed generation products for others | SECTION 8 - CANCELLED | — |
| 042 | Design of home and business electric energy control systems for others and engineering services in the field of computerized temperature, fire, safety, security and light control, energy usage management monitoring; energy monitoring services for others, namely, viewing or recording the timing or level of use and control of electricity used by selected devices; technical consultation in the field of electrical power generation and storage systems | SECTION 8 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by GRIDPOINT, INC.
- Other trademarks owned by GRIDPOINT, INC.
- Other trademarks owned by GRIDPOINT, INC.
- Other trademarks owned by Equinox Energy Solutions, Inc.
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named GRIDPOINT INTELLIGENT ENERGY MANAGEMENT
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 8, 2019 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| May 1, 2019 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Jun 27, 2014 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Nov 20, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 16, 2007 | REGV | LAW OFFICE REGISTRATION REVIEW COMPLETED | — |
| Oct 16, 2007 | ALIE | ASSIGNED TO LIE | — |
| Oct 12, 2007 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 12, 2007 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 15, 2007 | CNPR | ALLOWED PRINCIPAL REGISTER - SOU ACCEPTED | — |
| Sep 14, 2007 | SUPC | STATEMENT OF USE PROCESSING COMPLETE | — |
| Aug 31, 2007 | IUAF | USE AMENDMENT FILED | — |
| Aug 31, 2007 | PAPER RECEIVED | — | |
| Mar 20, 2007 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Dec 26, 2006 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 6, 2006 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 14, 2006 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 9, 2006 | ALIE | ASSIGNED TO LIE | — |
| Nov 3, 2006 | ALIE | ASSIGNED TO LIE | — |
| Nov 2, 2006 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 1, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 31, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 31, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 25, 2006 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 25, 2006 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 10, 2006 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jun 5, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 5, 2006 | PAPER RECEIVED | — | |
| Dec 23, 2005 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 23, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 22, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 8, 2005 | NWAP | NEW APPLICATION ENTERED | — |