USPTO serial 78718391
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Washington Group International, Inc.
Boise, ID
Other trademarks owned by Washington Group International, Inc.
Washington Group International, Inc.
Boise, ID
Other trademarks owned by Washington Group International, Inc.
Washington Group International, Inc.
Boise, ID
Other trademarks owned by Washington Group International, Inc.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Timothy P. Fraelich
TIMOTHY P FRAELICH JONES DAY901 LAKESIDE AVECLEVELAND, OH 44114UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 016 | News magazine in the fields of large construction projects, engineering, project management, facility start-up, operations and maintenance, and shut-down and decommissioning | SECTION 8 - CANCELLED | Jul 31, 2003 |
| 035 | Business management services in the fields of oil refining, radioactive and hazardous waste processing and mining safety and facilities | SECTION 8 - CANCELLED | Jul 31, 2003 |
| 037 | Construction services, namely, construction of military bases, storage facilities, pharmaceutical plants, food and beverage plants, oil refineries, fiber optics cable facilities, electronic chip manufacturing facilities, highways, bridges, rail systems, dams, hydroelectric plants, power generating plants, and chemical agent disposal facilities; collection and removal of radioactive waste; disposal of radioactive waste; construction planning services in the fields of threat reduction, defense infrastructure, environmental remediation, nuclear processing, power generating, mining, manufacturing facilities, rail systems, highways and bridges, airports, dams, hydroelectric plants, hazardous waste, high hazard facilities, chemical agent disposal and geologic evaluation | SECTION 8 - CANCELLED | Jul 31, 2003 |
| 039 | Waste handling services, namely, packaging for storage, storage, and transportation of radioactive waste | SECTION 8 - CANCELLED | Jul 31, 2003 |
| 040 | Waste handling services, namely, incineration of toxic chemical gases | SECTION 8 - CANCELLED | Jul 31, 2003 |
| 042 | Technical services, namely, engineering studies, conducting economic feasibility studies and technical feasibility studies, conceptual and detail design for others of processing facilities, buildings and other structures, in the fields of threat reduction, defense infrastructure, environmental remediation, nuclear processing, power generating, mining, manufacturing facilities, railway systems, highways and bridges, airports, dams, hydroelectric plants, hazardous waste, high hazard facilities, chemical agent disposal and geologic evaluation Technical services, namely, engineering studies, conducting economic feasibility studies and technical feasibility studies, conceptual and detail design for others of processing facilities, buildings and other structures, in the fields of threat reduction, defense infrastructure, environmental remediation, nuclear processing, power generating, mining, manufacturing facilities, railway systems, highways and bridges, airports, dams, hydroelectric plants, hazardous waste, high hazard facilities, chemical agent disposal and geologic evaluation | SECTION 8 - CANCELLED | Jul 31, 2003 |
| 045 | Security services, namely, threat simulations, vulnerability analysis and mitigation, emergency and crisis response and deployment of security technology, namely, airborne nuclear, chemical and biological material detectors and unconventional nuclear warfare defense systems; consultation services regarding the safety needs of commercial and industrial companies and government agencies in the fields of refining, radioactive and hazardous waste processing and mining | SECTION 8 - CANCELLED | Jul 31, 2003 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 12, 2013 | C8.. | CANCELLED SEC. 8 (6-YR) | — |
| Nov 21, 2007 | ASCK | ASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY | — |
| Dec 5, 2006 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 9, 2006 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 9, 2006 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 19, 2006 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 30, 2006 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 28, 2006 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 24, 2006 | ALIE | ASSIGNED TO LIE | — |
| Jul 20, 2006 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 30, 2006 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jun 19, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 19, 2006 | PAPER RECEIVED | — | |
| Jun 4, 2006 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jun 4, 2006 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| May 13, 2006 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| May 9, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 28, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 28, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 21, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 21, 2006 | PAPER RECEIVED | — | |
| Dec 23, 2005 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 23, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 22, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 29, 2005 | NWAP | NEW APPLICATION ENTERED | — |