USPTO serial 78725794
Reviewed by CopyMark Law Group
Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Raymond R. Ferrera
RAYMOND R. FERRERA ADAMS AND REESE LLP1221 MCKINNEY STSTE 4400HOUSTON, TX 77010-2023| Class | Description | Status | First use |
|---|---|---|---|
| 001 | [ Chemicals used in industry and science, namely, fluids useful for stimulating and furthering the exploration and production of natural energy resources, namely, oil reclamation fluid for the separation of crude oil from soil and water; chemical additives for gasoline, oil, natural gas and liquid natural gas, unprocessed artificial resins and plastics for use in energy exploration and production; and adhesives used in the fields of energy exploration and production; wetting agents ] | SECTION 8 - CANCELLED | — |
| 004 | [ Lubricants and fuels, namely, ] *Crude * oil, natural gas and liquid natural gas [ ; industrial oils and greases; motor oils and motor fuels, namely, gasoline and diesel motor fuels ] | SECTION 8 - CANCELLED | — |
| 006 | [ Metal goods, namely, metals, namely, tubes and pipe connectors, and metal alloys for buildings, transportable buildings, non-electric cable wires, pipes and tubes ] | SECTION 8 - CANCELLED | — |
| 007 | [ Machinery, namely, machines and machine tools for use in the fields of energy exploration and production, for capturing, controlling, raising and coupling sea vessels in a sea dock or a docking port; machine-driven couplings as parts of machines; buoyancy chambers for use in the fields of offshore exploration and production, namely, chambers that are structural parts of energy exploration and production machines used for making energy exploration and production machines buoyant ] | SECTION 8 - CANCELLED | — |
| 009 | [ Surveying devices, namely, surveying machines and instruments; optical devices, namely, optical cables and fiber optic cables; signaling devices, namely, signaling buoys and subsurface signaling plumbs; and supervision devices, namely, microscopes and telescopes; apparatus and instruments for controlling ships, namely, apparatus and instruments for monitoring and recording weather and operating conditions, and for transmitting and receiving orders and instructions relating thereto; computer programs for use in the fields of energy exploration and production, namely, recording topography data and analyzing data obtained from exploration and production system location and motion sensors in order to plan and operate exploration, drilling and production sites ] | SECTION 8 - CANCELLED | — |
| 035 | [ Advertising and business services, namely, business management and administration for others in the fields of energy exploration and production; help in the management of business affairs and commercial functions of an industrial or commercial enterprise in the fields of energy exploration and production; services relating to the functioning, namely, help in the management of functions of docks, airports and helipads, and management of docks, airports and helipads ] | SECTION 8 - CANCELLED | — |
| 036 | [ Insurance and financial services, namely, services rendered in financial and monetary affairs, namely, financial management, and services rendered in relation to insurance and escrow contracts, namely, maintaining escrow accounts for investments in the fields of energy exploration and production; and services rendered in connection with the issuance, receipt and transfer of lines of credit, namely, advancing and holding the proceeds of lines of credit; rental of shop and work spaces ] | SECTION 8 - CANCELLED | — |
| 037 | [ Building construction and repair, namely, building, construction, maintenance and repair of buildings used in the fields of energy exploration and production; services rendered by contractors and subcontractors in the construction of temporary and permanent buildings, namely, mechanical and electrical contractor services, painting and surfacing contractor services; services rendered by individuals or organizations, namely, restoration of objects and the environment, namely, the physical locations of exploration and drilling projects, to their original condition, and in their preservation without altering their physical properties; services auxiliary to construction services, namely, inspection of construction sites; maintenance and repair of ships and other sea vessels, namely, water-borne modular exploration and production systems; rental of energy exploration and production power tools and building materials, namely, construction equipment ] | SECTION 8 - CANCELLED | — |
| 039 | [ Transportation and storage services, namely, transportation of goods, materials, personnel, equipment packages and technical facilities in the fields of energy exploration and production by trucks, automobiles, boats, ships, skiffs, helicopters, airplanes and gliders, and storage of goods, materials, equipment packages and technical facilities in the fields of energy exploration and production; services connected with maritime tugs, namely, providing tugging of large boats for others; loading and unloading of goods, materials and personnel from transport vehicles ] | SECTION 8 - CANCELLED | — |
| 040 | Treatment of materials, namely, services rendered through the mechanical and chemical processing and transformation of objects and organic and inorganic substances, namely, natural gas, liquid natural gas, oil, and gasses obtained from oil wells | SECTION 8 - CANCELLED | — |
| 042 | Scientific and legal services, namely, services rendered by persons, both individually and collectively, relating to the theoretical and practical aspects of complex fields of activities, namely, legal services, engineering, chemist services, physicists services, namely, research in the fields of oceanography, physics, and geophysics, all in the fields of energy exploration and production; services auxiliary to construction services, namely, inspection of construction plans; inspection or goods, namely, exploration and production equipment, oil and gas, materials, namely, oils and gasses, namely, natural gas, liquid natural gas, oil and gasses obtained from wells, prior to dispatch, while in transit and upon delivery in the field of energy exploration and production | SECTION 8 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 12, 2021 | CAEX | CANCELLED SEC. 8 (10-YR)/EXPIRED SECTION 9 | — |
| Mar 31, 2020 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Mar 31, 2020 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Mar 31, 2020 | C15P | REGISTERED - PARTIAL SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Mar 31, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 31, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 31, 2020 | XXXX | POST REGISTRATION ACTION CORRECTION | — |
| Mar 30, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 26, 2020 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Mar 10, 2020 | A7OK | AMENDMENT UNDER SECTION 7 - PROCESSED | — |
| Mar 9, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 5, 2020 | PCDE | PETITION TO DIRECTOR DENIED | — |
| May 22, 2019 | APET | ASSIGNED TO PETITION STAFF | — |
| Oct 29, 2018 | TPDR | TEAS PETITION TO DIRECTOR RECEIVED | — |
| Apr 27, 2018 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Feb 21, 2018 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Sep 28, 2017 | PRAM | POST REGISTRATION ACTION MAILED - SEC. 7 | — |
| Sep 25, 2017 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Mar 24, 2017 | PR23 | POST REGISTRATION ACTION MAILED - SEC. 8 & 15 | — |
| Mar 23, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 21, 2017 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jul 20, 2010 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 20, 2010 | NOAM | NOA E-MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Jun 14, 2010 | FIXD | ELECTRONIC RECORD REVIEW COMPLETE | — |
| Jun 11, 2010 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| May 19, 2010 | ISPO | WITHDRAWN FROM ISSUE - PETITIONS OFFICE REQUEST | — |
| May 11, 2010 | D1BR | TEAS DELETE 1(B) BASIS RECEIVED | — |
| May 11, 2010 | ERTD | TEAS REQUEST TO DIVIDE RECEIVED | — |
| Apr 27, 2010 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 27, 2010 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 23, 2010 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 18, 2010 | DMCC | DATA MODIFICATION COMPLETED | — |
| Mar 17, 2010 | DMCC | DATA MODIFICATION COMPLETED | — |
| Mar 9, 2010 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Mar 8, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 4, 2010 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Mar 4, 2010 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Mar 4, 2010 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Mar 4, 2010 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 25, 2010 | DMCC | DATA MODIFICATION COMPLETED | — |
| Feb 24, 2010 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Feb 24, 2010 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Feb 23, 2010 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Feb 22, 2010 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Sep 29, 2009 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Sep 29, 2009 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 29, 2009 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 12, 2009 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Mar 12, 2009 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Mar 11, 2009 | ALIE | ASSIGNED TO LIE | — |
| Feb 2, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Sep 11, 2008 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Mar 11, 2008 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Mar 10, 2008 | ALIE | ASSIGNED TO LIE | — |
| Sep 7, 2007 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Sep 7, 2007 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Sep 7, 2007 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Sep 6, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 6, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 6, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 12, 2007 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| May 12, 2007 | ALIE | ASSIGNED TO LIE | — |
| Nov 1, 2006 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Nov 1, 2006 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Oct 12, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 10, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 10, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 10, 2006 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 10, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 7, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 14, 2005 | AMPX | PRELIMINARY/VOLUNTARY AMENDMENT - ENTERED | — |
| Oct 14, 2005 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Oct 7, 2005 | NWAP | NEW APPLICATION ENTERED | — |