Drawing for ENGINE 3E

USPTO serial 78748244

ENGINE 3E

Reviewed by CopyMark Law Group

Reg. 3524226Status 710
Filing date
Status date
Registration date
Oct 28, 2008
Examiner
SNAPP, TINA LOUISE
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with ENGINE 3E?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Diane Donnelly

DIANE DONNELLY VON MALTITZ, DERENBERG, KUNIN, JANSSEN60 E 42ND ST RM 4410NEW YORK, NY 10165-0133UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Metal gaskets, namely, brush sealing gaskets, labyrinth sealing gaskets, and slide ring gasketsSECTION 8 - CANCELLED—
007AIRCRAFT JET ENGINES; AIRCRAFT PROPELLER TURBINE JET ENGINES; AIR TURBO COMPRESSORS FOR AIRCRAFT; AIRCRAFT EXHAUST GAS TURBO-SUPERCHARGERS; MECHANICALLY DRIVEN AIRCRAFT COMPRESSORS; LIQUID AND FUEL PUMPS FOR AIRCRAFT; PUMP DRIVES FOR AIRCRAFT; RADIAL AND AXIAL AIRCRAFT COMPRESSORS; POWER-OPERATED BLOWERS; GUIDE BAFFLES FOR AIRCRAFT TURBO-ENGINES; AXIAL AND RADIAL TURBINES; FUEL INJECTION PUMPS, NOZZLES AND CONTROL VALVES FOR AIRCRAFT; COMPRESSED-AIR STARTERS; HYDRAULIC DRIVES AND RELATED COUPLERS; OIL AND FUEL FILTERS; LIQUID FILTERS; CENTRIFUGES; MACHINE PARTS, NAMELY, BEARING HOUSINGS; ROTORS, NAMELY, ROTORS FOR TURBO-ENGINES; PROPELLING NOZZLES FOR AIRCRAFT ENGINES AND STRUCTURAL PARTS THEREFOR; BLADES FOR TURBO-ENGINES; AND STRUCTURAL PARTS OF TURBO-ENGINES MADE FROM FIBER COMPOUND MATERIALS, CERAMIC AND METALS; FUEL REGULATORS FOR USE IN GAS TURBINES, ESPECIALLY AIRCRAFT ENGINES; METAL ENGINE GASKETS FOR AIRCRAFT; SPARK IGNITERS AND IGNITION COILERS FOR USE IN GAS TURBINES, NAMELY, IN AIRCRAFT ENGINES; AND PROFILE AND DISTRIBUTING PIPES FOR USE IN GAS TURBINES, NAMELY, IN AIRCRAFT ENGINESSECTION 8 - CANCELLED—
009Fuel meters, electric and electronic controls for internal combustion and aircraft driving gears, computer software data carriers dealing with internal combustion engines and aircraft driving gearsSECTION 8 - CANCELLED—
011HEAT EXCHANGERS, NAMELY, CROSS-COUNTERFLOW HEAT EXCHANGERS, RECUPERATIVE HEAT EXCHANGERS, REGENERATIVE HEAT EXCHANGERS; GAS BURNERS AND FLAME RETAINERS FOR USE IN GAS TURBINES, NAMELY, IN AIRCRAFT ENGINES; COMBUSTION CHAMBERS; COOLERS, NAMELY, OIL, FUEL, AND COOLANT COOLERS; AND RADIATORSSECTION 8 - CANCELLED—
012Aircraft drive gears; gas turbines for aircraft, namely, shaft power driving gears; fuel supply lines for aircraft; bearings for aircraft shafts, axles, rotors and drives; gear wheels; mounting devices for driving gearSECTION 8 - CANCELLED—
017Architectural acoustic products, namely, sound absorbers for aircraft engines; non-metal gaskets, namely, brush sealing gaskets, labyrinth sealing gaskets, and slide ring gasketsSECTION 8 - CANCELLED—
037Technical maintenance and repair of aircraft driving gear and internal combustion enginesSECTION 8 - CANCELLED—
042Consultation in the field of aircraft driving gear technology and internal combustion engine technology, research and development in the field of aircraft driving gear, preparation and updating of computer software programs dealing with all aspects of aircraft driving gear and internal combustion enginesSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 29, 2015C8..CANCELLED SEC. 8 (6-YR)—
Jan 1, 2014ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Oct 28, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 23, 2008DP1B1(B) BASIS DELETED; PROCEED TO REGISTRATION—
Sep 23, 2008AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Sep 17, 2008IUCNNOTICE OF ALLOWANCE CANCELLED—
Sep 17, 2008MAILPAPER RECEIVED—
Sep 9, 2008NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Jun 17, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 28, 2008NPUBNOTICE OF PUBLICATION—
May 9, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 8, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 7, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 7, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 7, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 4, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 4, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 23, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Nov 16, 2007PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Nov 7, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 1, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 31, 2007XAECEXAMINER'S AMENDMENT ENTERED—
Oct 31, 2007GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 31, 2007GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 31, 2007CNEAEXAMINERS AMENDMENT -WRITTEN—
Sep 6, 2007GPRNNOTIFICATION OF PRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Sep 6, 2007GPRAPRIORITY ACTION E-MAILEDA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Sep 6, 2007CPRAPRIORITY ACTION WRITTENA priority action is a type of Office Action the USPTO treats as time-sensitive. It usually means the examining attorney needs a specific response or amendment quickly — often relating to a foreign priority claim or a formal requirement. Respond within the stated deadline.
Aug 30, 2007ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Aug 13, 2007PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jul 31, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 27, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 25, 2007ACECAMENDMENT FROM APPLICANT ENTERED—
Jul 25, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2007ALIEASSIGNED TO LIE—
Jul 12, 2007MAILPAPER RECEIVED—
May 1, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 30, 2007ACECAMENDMENT FROM APPLICANT ENTERED—
Apr 30, 2007ALIEASSIGNED TO LIE—
Mar 30, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 30, 2007MAILPAPER RECEIVED—
Dec 7, 2006GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 7, 2006CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 16, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 3, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 3, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 13, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 13, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 11, 2006DOCKASSIGNED TO EXAMINER—
Nov 10, 2005NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance