Drawing for SAG

USPTO serial 78755283

SAG

Reviewed by CopyMark Law Group

Status 606
Filing date
Status date
Registration date
—
Examiner
MCCAULEY, BRENDAN D
Law office
INTENT TO USE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with SAG?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey H. Kaufman

JEFFREY H KAUFMAN OBLON, SPIVAK, MCCLELLAND, MAIER, & NE1940 DUKE STALEXANDRIA, VA 22314-3451UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Building materials of metal, namely, metal building flashing, soffits and fascia; metal poles; poles of metal for electric power lines; metal power line towers in the nature of metal utility polesACTIVE—
007Electric motors for machines, electric generators, electric power generators, turbines not for land vehicles, electric compressors, air compressors; air condensers and turbo electric compressorsACTIVE—
009Condensers, namely, capacitors; apparatuses and instruments for heavy current engineering and lines transmission, conversion, storage, regulation and control, namely, current converters, current rectifiers, computers, and circuits for heavy electrical current; electric cables, electric wires, electrical conductors and parts therefore, namely, electric cable and wire connection fittings; electric switches; electrical distribution boxes; electrical fuses; electrical transformers; electrical relays; electric measuring instruments; electrical indicating equipment, namely, electrical meters, current meters, voltage meters, and computers for monitoring electrical current; electrical switching devices and electrical switchgear, namely, switchgears, power switches, switch boxes, and voltage boosting devices for electric power lines; counters and meters, namely, voltage testers; power rectifiersACTIVE—
035Commercial business and business organizational consulting regarding the preparation for, erection and construction of, and the operation of energy supply facilities, energy generation facilities, power engineering installations and systems, electrical systems, supply and distribution systems for power, gas, water and heat, waste disposal systems, particularly for waste water, telecommunications equipment, lighting equipment, traffic signal equipment and overhead traction equipment; commercial business planning and business organizational planning of construction projects; business management consulting, business management and administration; personnel management, namely, temporary transfer of personnel for othersACTIVE—
036Financial consulting and financing for others of the construction and the operation of energy supply facilities, energy generation facilities, power engineering installations and systems, electrical systems, supply and distribution systems for power, gas, water and heat, waste water disposal systems, telecommunications equipment, lighting equipment, traffic signal equipment and overhead traction equipment; financial planning for construction projects; investment services, namely, assets management in connection with construction projectsACTIVE—
037Commercial construction and construction organizational consulting regarding building and construction of energy supply facilities, energy generation facilities, power engineering installations and systems, electrical systems, supply and distribution systems for power, gas, water and heat, waste disposal systems, particularly for waste water, telecommunications equipment, lighting equipment, traffic signal equipment and overhead traction equipment; services of an electrician, namely, electrical contracting services; construction of buildings; construction of energy supply facilities and energy generation facilities, power engineering installations and systems, electrical systems, supply and distribution systems for power, gas, water and heat, disposal systems, particularly for waste water; installation, maintenance and repair of telecommunications equipment, lighting equipment, traffic signal equipment and overhead traction equipment; electrical installations of electrical systems; repair and maintenance of towers for power distribution and for telecommunicationsACTIVE—
038Telecommunications, namely, providing electronic telecommunication connections; telecommunication services, namely, transmission of voice, data and documents; rental of telecommunications equipmentACTIVE—
039Distribution of power, gas, water and heatACTIVE—
041Providing training and seminars in the field of engineering, construction, electrical systems, energy generation, energy supply, energy distribution and telecommunicationsACTIVE—
042Technical engineering consultation for the erection, construction and operation of energy supply facilities, energy generation facilities, power engineering installations and systems, electrical systems, supply and distribution systems for power, gas, water and heat, disposal systems, particularly for waste water, telecommunications equipment, lighting equipment, traffic signal equipment and overhead traction equipment; services of an engineer, namely, engineering; services of a physicist, namely, consultation and research in the field of physics; services of a chemist, namely, chemist servicesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB6): The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.

DateCodeEventWhat it means
Jan 3, 2011MAB6ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Jan 3, 2011ABN6ABANDONMENT - NO USE STATEMENT FILEDThe intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window.
Apr 9, 2010EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Apr 7, 2010EX1GSOU EXTENSION 1 GRANTED—
Apr 7, 2010EXT1SOU EXTENSION 1 FILED—
Apr 7, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Dec 1, 2009NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Sep 8, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 19, 2009NPUBNOTICE OF PUBLICATION—
Aug 6, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 31, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 29, 2009ASGNAUTOMATIC UPDATE OF ASSIGNMENT OF OWNERSHIP—
Jul 29, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 23, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 23, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 22, 2009TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 11, 2009GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2009GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 11, 2009CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 10, 2009ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 23, 2009PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Jan 13, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jan 13, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jan 3, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 2, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 2, 2009ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jul 11, 2008GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jul 11, 2008GNSIINQUIRY TO SUSPENSION E-MAILED—
Jul 11, 2008CNSISUSPENSION INQUIRY WRITTEN—
Jan 10, 2008GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 10, 2008GNSLLETTER OF SUSPENSION E-MAILED—
Jan 10, 2008CNSLSUSPENSION LETTER WRITTEN—
Jan 10, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 8, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 8, 2008TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 9, 2007GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jul 9, 2007GNSIINQUIRY TO SUSPENSION E-MAILED—
Jul 9, 2007CNSISUSPENSION INQUIRY WRITTEN—
Jul 9, 2007RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jan 9, 2007GNSLLETTER OF SUSPENSION E-MAILED—
Jan 9, 2007CNSLSUSPENSION LETTER WRITTEN—
Jan 5, 2007ACECAMENDMENT FROM APPLICANT ENTERED—
Jan 5, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 4, 2007ALIEASSIGNED TO LIE—
Nov 29, 2006MAILPAPER RECEIVED—
May 29, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 29, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 22, 2006DOCKASSIGNED TO EXAMINER—
Feb 15, 2006CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jan 18, 2006MAILPAPER RECEIVED—
Nov 23, 2005MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Nov 22, 2005NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance