USPTO serial 78776169
FORTUM
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- COLLIER, DAVID E
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with FORTUM?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Amy F. Divino
Amy F. Divino Cozen O'Connor277 Park AvenueNew York, NY 10172UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Automotive chemicals and their derivatives, namely, coolants, brake fluids, and antifreezes; chemicals used in refining and production of oil; chemical additives to motor fuels and solvents for use in paints, coatings and degreasing agents | ACTIVE | — |
| 003 | Windscreen cleaners | ACTIVE | — |
| 004 | Gases, namely, butane, propane, liquefied petroleum gas and liquefied natural gas; coals; gasoline; diesel oils; light and heavy oils; aviation fuel; non-chemical additives to motor fuels; base oils for use in the manufacture of engine oils, gear oils and circulation oils; lubricants for engines; lubricant components, namely, paraffinic based oils, high viscosity index base oils, extra high viscosity index base oils, synthetic base oils; napthenic oils, namely, napthene used in process oils and hydraulic oils; specialty fuels for use in motors, lawnmowers, chain saws and outboard motors | ACTIVE | — |
| 009 | Equipment for electrochemical storage of energy, namely, accumulators, batteries, dry fuel cells; electrical apparatus and instruments used in connection with electrochemical storage of energy, namely, battery rechargers; equipment for power conditioning and power conversion, namely, converters; electric storage batteries; electrical apparatus and instruments used in connection with storage batteries, namely, battery rechargers; electrical ducts | ACTIVE | — |
| 011 | Oil heating apparatus, electrical heating apparatus, gas heating apparatus, and central heating apparatus, namely, furnaces | ACTIVE | — |
| 036 | Services relating to the distribution of electricity, namely, brokerage of electricity | ACTIVE | — |
| 037 | Installation of electrical apparatus, installation and repair of heating apparatus and central heating apparatus; asphalting, laying of oil pipelines; covering, coating and maintenance of oil pipelines; regulation and repair of oils-burners; service station services; drilling of oil wells; construction and maintenance of nuclear power plants, hydro power plants, combined heat and power plants, heat production plants, waste disposal, processing and treatment plants | ACTIVE | — |
| 039 | Services relating to distribution of electricity, namely, transmission of electricity; services relating to transport by land, air and water, namely, transportation of passengers and/or goods by boat, rail or truck; shipping of freight by land, air and sea; freighting and renting of ships; transfer of oil through pipelines; transmission of oil or gas through pipelines; distribution of energy; consultancy concerning the transmission and distribution of energy | ACTIVE | — |
| 040 | Generation of electricity; production of energy; municipal waste processing, namely, decontamination of nuclear waste; incineration of waste; consulatancy concerning the production of energy | ACTIVE | — |
| 042 | Drawing up of expert technical opinions in connection with oil deposits; product development; consultancy concerning geographical surveys; oil prospecting; test, control and analysis of oil wells; geological estimation, geological prospecting; geological surveys; consultation services in the field of electrical engineering; design of computer network services for others in the oil and petroleum industries; website design services and computer consultation, namely, consultations in the field of information and data system services; testing services relating to production, transmission and distribution of energy for the purposes of certification; environmental protection services relating to industry, namely, reviewing standards and practices to assure compliance with environmental laws; pipeline inspection services; engineering services for the construction of nuclear power plants, hydro power plants, combined heat and power plants, heat production plants; inspection of oil burners | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Fortum Corporation
- Other trademarks owned by Fortum Corporation
- Other trademarks in Class 001
- Other trademarks in Class 003
- Other trademarks in Class 004
- Other trademarks in Class 009
- Other trademarks in Class 011
- Other trademarks in Class 036
- Other trademarks in Class 037
- Other trademarks in Class 039
- Other trademarks in Class 040
- Other trademarks in Class 042
- Similar marks named FORTUM
- Prosecution event MAB6 explained
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 12, 2010 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Jul 12, 2010 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Mar 1, 2010 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 2, 2009 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Dec 1, 2009 | EXT5 | SOU EXTENSION 5 FILED | — |
| Dec 1, 2009 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 17, 2009 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Jun 17, 2009 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| May 29, 2009 | EXT4 | SOU EXTENSION 4 FILED | — |
| May 29, 2009 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 29, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 21, 2008 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Oct 21, 2008 | EXT3 | SOU EXTENSION 3 FILED | — |
| Oct 21, 2008 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 15, 2008 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Apr 15, 2008 | EXT2 | SOU EXTENSION 2 FILED | — |
| Apr 15, 2008 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 29, 2007 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Oct 29, 2007 | EXT1 | SOU EXTENSION 1 FILED | — |
| Oct 29, 2007 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Jun 12, 2007 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Mar 20, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 28, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Feb 7, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 6, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 6, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 6, 2007 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 6, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 6, 2007 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jan 22, 2007 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jan 3, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 3, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 3, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 3, 2007 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 3, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jan 3, 2007 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Dec 29, 2006 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Dec 8, 2006 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 8, 2006 | ALIE | ASSIGNED TO LIE | — |
| Nov 21, 2006 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 20, 2006 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 20, 2006 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 20, 2006 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 14, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 13, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 13, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 13, 2006 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 13, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 8, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 6, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 6, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 13, 2006 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 27, 2006 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 27, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 25, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 22, 2005 | NWAP | NEW APPLICATION ENTERED | — |