USPTO serial 78800612
WIRED WILD WEST
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Jan 2, 2007
- Examiner
- GRAY, CAROLYN
- Law office
- GENERIC WEB UPDATE
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Deadline: January 2, 2027
Need help with WIRED WILD WEST?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*
Plus Government fees of $650
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Electrical contractor services; carpentry services; construction supervision; electrical contractor services for electric motors for machines, covers for electric outlets, ducting for electric cables, electric cables, electric capacitors, electric connectors, electric control panels, electric cords, electric current switches, electric door bells, electric fuse boxes, electric junction boxes, electric light dimmers, electric light switches, electric luminescent display panels, electric or electronic proximity sensors, electric plugs, electric relays, electric signs, electric sockets, electric switch plates, electric switches, electric transformers, electric wires and cables, fluorescent lamp ballast for electric lights, fuses for electric current, electric candelabras, electric cooking ovens, electric cooktops, electric domestic appliances, electric fans, electric lighting fixtures, electric luminaries, electric night lights, electric space heaters, electric stoves, electric track lighting units, sockets for electric lights, electric lighting apparatus, and electric motors; installation, inspection, repair and maintenance of electrical systems, engine equipment and machines, instrumentation, control systems and electrical equipment; Installation, inspection, repair and maintenance of computer systems, electronics for industrial machinery, office machines, precision mechanical products, computer hardware, and computer peripherals; Installation, inspection, repair and maintenance of HVAC systems, heating systems, cooling systems, air-conditional apparatus, ventilation systems, water and wastewater systems, water flow systems, irrigation systems, wind and water power systems, zone heating, open space, pipe and gutter heating, heat pumps for heating and hot water generation, heat exchange apparatus, heating and cooling control systems and environmental control systems; Installation, inspection, repair and maintenance of electrical, electronic, and heating systems, inspection, repair and maintenance of broadcast receiving systems, telecommunication systems, neon signs, lifting and conveyor systems, pumps, electro acoustic systems, teleconference systems, clock and time recording systems; Installation, inspection, repair and maintenance of power amplifiers, power supplies, GFCI (Ground Fault Circuit Interrupters), transformers, converters, electronic ballasts, electrical control equipment, cables, cable assemblies and harnesses, interconnectors, electrical motors, oscilloscopes, test adapters and fixtures, electronic test equipment, test instrumentation, recording equipment, switching equipment, sensing electronics, security systems, security electronics, LED displays, Center High Mounted Stop Lamps (CHMSL), surface mounted assemblies, surge protection electronic assemblies, sonar electronic assemblies, power modules, magnetron modules, electronic subassemblies and LLPS (Low Level Power Supplies); Installation, inspection, repair and maintenance of custom manufacturing of electronic control panels for use in automated production machinery and automation process control systems, high-speed packaging equipment, inspection equipment, automated assembly equipment, material handling equipment, automated finishing systems, conveyance systems, bundling and transporting systems; Installation, inspection, repair and maintenance of automating projects, machinery upgrade/retrofit projects, new technology upgrades and actuator conversion; Installation, inspection, repair and maintenance of electric devices and computer components, namely, programmable logic controllers, closed-loop position controllers, servo drives, variable frequency drives, actuators, position, velocity and acceleration feedback/measurement devices, human-machine interface (HMI) devices, operator display terminals and marquee displays; Advisory and consulting services relating to the installation, inspection, maintenance or repair of automated control systems | ACTIVE | Jan 13, 2006 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 2, 2026 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Mar 16, 2016 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Mar 16, 2016 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Mar 16, 2016 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Mar 16, 2016 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 7, 2016 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jan 7, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 2, 2016 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Mar 23, 2012 | NAS8 | NOTICE OF ACCEPTANCE OF SEC. 8 - E-MAILED | — |
| Mar 23, 2012 | 8.OK | REGISTERED - SEC. 8 (6-YR) ACCEPTED | The USPTO accepted your Section 8 declaration showing the mark is still in use in commerce (or excusable nonuse). This satisfies the six-year maintenance requirement and keeps the registration active until the next renewal deadline. |
| Mar 22, 2012 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 29, 2012 | ES8R | TEAS SECTION 8 RECEIVED | — |
| Jan 29, 2012 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 29, 2012 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jan 2, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Oct 17, 2006 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 27, 2006 | NPUB | NOTICE OF PUBLICATION | — |
| Aug 25, 2006 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 22, 2006 | ALIE | ASSIGNED TO LIE | — |
| Aug 15, 2006 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 2, 2006 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 1, 2006 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 1, 2006 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 26, 2006 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 26, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 19, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 2, 2006 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Feb 1, 2006 | NWAP | NEW APPLICATION ENTERED | — |