USPTO serial 78813342
Reviewed by CopyMark Law Group
These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | COMPUTER OPERATING PROGRAMS AND APPLICATIONS PROGRAMS FOR EVALUATING, MONITORING, MANAGING, CONTROLLING, SUPPLYING, CONVERTING, CONDITIONING AND TESTING ENERGY OPERATIONS, USAGE, POWER QUALITY AND ENERGY EFFICIENCY WITHIN INDUSTRIAL AND BUSINESS ENVIRONMENTS, AND MANUALS SOLD AS A UNIT, ENERGY FACILITIES AND INFRASTRUCTURE, NAMELY, POWER PLANTS, SUBSTATIONS, COGENERATION UNITS, GENERATORS, ENERGY GENERATION, TRANSMISSION, STORAGE AND DISTRIBUTION FACILITIES AND INFRASTRUCTURE,BUSINESS MANAGEMENT CONSULTATION, AUDITING UTILITY RATES FOR OTHERS, AND ENERGY BILL PAYMENT, ENERGY BILL AUDITING AND RATE ANALYSIS; OPERATION OF FACILITIES AND INFRASTRUCTURE FOR OTHERS FOR ENERGY GENERATION, TRANSMISSION, STORAGE AND DISTRIBUTION, ELECTRICITY, GAS AND ENERGY COMMODITIES BROKERAGE SERVICES; ENERGY BILL PAYMENT SERVICES, PROVISION OF SERVICES DESIGNED TO PROTECT ELECTRICALLY POWERED EQUIPMENT (INCLUDING COMPUTER HARDWARE AND RELATED SOFTWARE SYSTEMS) FROM DAMAGE AND DISTURBANCE, NAMELY THE INSTALLATION OF SURGE PROTECTORS AND MAINTENANCE SERVICES WITH RESPECT TO THE SAME, COMPUTER SERVICES, NAMELY, INSTALLING COMPUTER NETWORKS AND/OR SYSTEMS, INSTALLATION, MAINTENANCE AND REPAIR OF OUTDOOR LIGHTING FIXTURES; CONSTRUCTION OF FACILITIES AND INFRASTRUCTURE FOR OTHERS FOR ENERGY GENERATION, TRANSMISSION, STORAGE AND DISTRIBUTION; INSTALLATION, MAINTENANCE OF FACILITIES AND INFRASTRUCTURE FOR OTHERS FOR ENERGY GENERATION, TRANSMISSION, STORAGE AND DISTRIBUTION; INSTALLATION AND MAINTENANCE OF INDUSTRIAL EQUIPMENT AND POWER COGENERATION AND OTHER POWER SUPPLY EQUIPMENT; INSTALLATION OF COMPUTERIZED ENERGY MANAGEMENT SYSTEMS; HVAC CONSTRUCTION AND MAINTENANCE SERVICES; INSTALLATION OF OUTDOOR ARCHITECTURAL LIGHTING FOR OTHERS, ELECTRONIC TRANSMISSION OF DATA AND DOCUMENTS VIA COMPUTER TERMINALS; ELECTRONIC TRANSMISSION OF MESSAGES AND DATA; TELEPHONE VOICE MESSAGING SERVICES, PROVISION OF TELECOMMUNICATION SERVICES, NAMELY, TRADITIONAL LONG DISTANCE SERVICES,TOLL-FREE SERVICES, CONFERENCE CALLING, ADVANCED DATA SOLUTION, PCS WIRELESS SERVICES, PREPAID CALLING CARDS AND TRAVEL CARDS, NATURAL GAS, OIL, COAL, AND LIQUID FUELS, NAMELY, LIQUEFIED NATURAL GAS, PROPANE, ETHANOL, METHANOL, DIESEL FUEL AND SYNTHETIC FUELS, PUBLIC UTILITY SERVICES IN THE NATURE OF ELECTRICITY; TRANSMITTING, TRANSPORTING, STORING AND DISTRIBUTING OF ENERGY COMMODITIES, NAMELY, ELECTRICITY AND NATURAL GAS; ARRANGING FOR TRANSMISSION, TRANSPORTATION, STORAGE AND DISTRIBUTION OF ENERGY COMMODITIES, NAMELY, ELECTRICITY AND NATURAL GAS; UTILITY SERVICES, NAMELY, TRANSMISSION OF CHILLED WATER, HOT WATER AND STEAM FOR USE IN AIR CONDITIONING, HEATING AND CLIMATE CONTROL SYSTEMS, ENERGY CONVERSION AND GENERATION SERVICES, OUTDOOR ARCHITECTURAL LIGHTING DESIGN FOR OTHERS; LEASING OF OUTDOOR LIGHTING FIXTURES; CONSULTING SERVICES RELATING TO ENERGY USE, ENERGY PURCHASING AND ENERGY EFFICIENCY; CONSULTING SERVICES RELATING TO THE DESIGN, PURCHASING, INSTALLATION AND MAINTENANCE OF INDUSTRIAL EQUIPMENT AND POWER CO-GENERATION AND OTHER POWER SUPPLY EQUIPMENT; CONSULTING SERVICES RELATING TO THE DESIGN AND INSTALLATION OF COMPUTERIZED ENERGY MANAGEMENT SYSTEMS; LABORATORY SERVICES, NAMELY, EQUIPMENT CALIBRATION AND METROLOGY AND PREDICTIVE MAINTENANCE, COMPUTER SERVICES, NAMELY, DESIGNING AND IMPLEMENTING COMPUTER NETWORKS, PROVISION OF TECHNICAL CONSULTING SERVICES IN THE FIELD OF ELECTRICALLY POWERED EQUIPMENT, NAMELY, DIAGNOSTIC SERVICES | ACTIVE | Nov 7, 1997 |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 27, 2007 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Mar 27, 2007 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Aug 17, 2006 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 17, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 1, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Feb 18, 2006 | MDSC | NOTICE OF DESIGN SEARCH CODE MAILED | — |
| Feb 17, 2006 | NWAP | NEW APPLICATION ENTERED | — |