Drawing for PACKERS PLUS

USPTO serial 78817035

PACKERS PLUS

Reviewed by CopyMark Law Group

Reg. 3348283Status 800Renewal
Filing date
Status date
Registration date
Dec 4, 2007
Examiner
LEWIS, MICHAEL
Law office
GENERIC WEB UPDATE

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with PACKERS PLUS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $748*

Plus Government fees of $1,300

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

C. Dennis Loomis

C. Dennis Loomis Buchalter, A Professional Corporation1000 Wilshire BoulevardSuite 1500Los Angeles, CA 90017

Goods and services

ClassDescriptionStatusFirst use
007[ OIL AND GAS WELL COMPLETION TOOLS, namely, DOWNHOLE TOOLS, namely, PACKERS, BRIDGE PLUGS, OPEN HOLE PACKERS, LANDING NIPPLES, SEAL BORE PACKERS, WIRE LINE SET PACKERS, HYDRAULIC SET PACKERS, TUBING ANCHORS, WIRE LINE PLUGS, SLIDING SLEEVES, INFLATABLE PACKERS, CEMENT RETAINERS; SERVICE TOOLS, namely, RETRIEVABLE PACKERS AND BRIDGE PLUGS, CEMENT RETAINERS, INFLATABLE PACKERS, WIRE LINE LANDING NIPPLES, TREATING PACKERS, WIRE LINE PLUGS; FRACTURING SYSTEMS, namely, CASED HOLE AND OPEN HOLE MULTISTAGE PACKERS USED TO PLACE FLUIDS IN SECTIONS OF AN OIL AN GAS WELL TO STIMULATE PRODUCTION; ACIDIZING SYSTEMS, namely, CASED HOLE AND OPEN HOLE MULTISTAGE PACKERS USED TO PLACE ACIDS IN SECTIONS OF AN OIL AN GAS WELL TO STIMULATE PRODUCTION; INTELLIGENT COMPLETION SYSTEMS, namely, PACKERS, VALVES, GAUGES AND CONTROL SYSTEMS USED TO CONTROL THE MOVEMENT OF FLUIDS IN A WELL; SPECIALTY SERVICE TOOLS, namely, OPEN HOLE STRADDLE TEST AND ACID TOOLS, MULTILATERAL TESTING PACKERS AND BRIDGE PLUGS, OPEN HOLE CEMENT RETAINERS; FLOW CONTROL EQUIPMENT, namely, LANDING NIPPLES, SLIDING SLEEVES, WIRE LINE PLUGS, WIRE LINE CHOKES, PRESSURE GAUGES, SHIFTING AND RUNNING TOOLS; AND TUBULARS ]SECTION 8 - CANCELLED—
037OIL AND GAS WELL COMPLETION SERVICES, NAMELY, CEMENTING SERVICES.ACTIVE—
040OIL AND GAS WELL SERVICES, NAMELY, FRACTURING SERVICES, PERFORATING SERVICES, WELL STIMULATION AND WATER AND SAND CONTROL SERVICES.ACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 22, 2024EWAFTEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS—
Nov 22, 2024TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Nov 22, 2024ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 22, 2024REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Aug 30, 2022NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Aug 30, 2022NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Aug 30, 2022RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Aug 30, 20229G8PREGISTERED - SEC. 9 GRANTED/CHECK RECORD FOR SEC. 8—
Aug 30, 20228PRTREGISTERED - PARTIAL SEC. 8 (10-YR) ACCEPTED—
Aug 30, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 9, 2022TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 9, 2022ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 9, 2022REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 17, 2021TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 17, 2021ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2021REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 19, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Oct 19, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 19, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 19, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 18, 2019APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jun 12, 2019CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jun 12, 2019COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Jun 5, 2018PRANPOST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED—
Jun 4, 2018EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Dec 28, 2017PR89POST REGISTRATION ACTION MAILED - SEC. 8 & 9—
Dec 28, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 30, 2017E89RTEAS SECTION 8 & 9 RECEIVED—
Dec 4, 2016REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Jun 8, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 8, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Nov 28, 2014CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Nov 28, 2014COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Dec 2, 2013NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Dec 2, 2013C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Dec 2, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 20, 2013E815TEAS SECTION 8 & 15 RECEIVED—
Dec 4, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 18, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 29, 2007NPUBNOTICE OF PUBLICATION—
Aug 9, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 9, 2007XAECEXAMINER'S AMENDMENT ENTERED—
Aug 9, 2007GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Aug 9, 2007GNEAEXAMINERS AMENDMENT E-MAILED—
Aug 9, 2007CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 8, 2007ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jul 31, 2007PBIRWITHDRAWN FROM PUB - TQR/NON-ATTY REQUEST—
May 21, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 18, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 18, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 18, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 16, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 27, 2007GNSLLETTER OF SUSPENSION E-MAILED—
Mar 27, 2007CNSLSUSPENSION LETTER WRITTEN—
Mar 15, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 15, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 15, 2007ALIEASSIGNED TO LIE—
Feb 6, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 5, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 5, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 4, 2006DOCKASSIGNED TO EXAMINER—
Feb 24, 2006MDSCNOTICE OF DESIGN SEARCH CODE MAILED—
Feb 23, 2006NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance