Drawing for URS

USPTO serial 78839141

URS

Reviewed by CopyMark Law Group

Reg. 4089448Status 710
Filing date
Status date
Registration date
Jan 24, 2012
Examiner
RAPPAPORT, SETH
Law office
TMEG LAW OFFICE 103

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with URS?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Steven J. Nataupsky

Steven J. Nataupsky KNOBBE MARTENS OLSON & BEAR LLP2040 Main Street, 14th FloorIrvine, CA 92614UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
035Business administration services, namely, management of human resources and office and facility equipment, and materials; Business management services, namely, management of military equipment and materials; Business advisory and consultancy services in relation to defense systems and facilities management and commercial assistance relating to system implementation and system integration in the field of analysis of anti-terrorism protection, base alignment and closure, emergency preparedness, environmental restoration, global threat reduction, installations management, logistics management, military aviation and ground systems, military facilities design, military flight training, nuclear, chemical and biological weapons demilitarization, and weapons systems development and modernization, computer technology implementation, computer systems modification, installation of new computer systems and computer peripheral equipment, and the design and manufacture of computer hardware and software and equipment and integrated logistics support for aviation and ground defense systems; Business services, namely, facilities management in the field of aviation, corporate operations, government, energy, industrial and manufacturing facilities, office buildings, research and development facilities, and transportation facilities managing consultants, costs and scheduling monitoring, construction and renovation monitoring, technical operations, interior design; management of industrial installations and configurations, namely, operation services in the field of manufacturing, processing and assembly plants, processing and refining facilities, distribution centers, power plants, transportation infrastructure, and mining operations; Business consulting services in the field of applicable statutes, regulations, directives and instructions, due diligence, environmental assessments, safety and health assessments, asset management, acquisition planning, technology assessment, licensing and permitting, and risk management; Business services in the field of internal process optimization and on the job process hazards analysis; Business acquisition and merger consultation; Corporate governance consulting services, namely, economic and strategic planning, budgeting, contingency planning, social risk assessment and developing sustainable work systems; Human resource management, namely, project staffing; Business management and business management in the nature of control over secure information distribution on global computer information networks and on local computer networks; Business services, namely, construction project management, namely, cost and schedule control, document control, utility coordination, contract administration, contractor coordination and change order controlSECTION 8 - CANCELLEDNov 2, 1984
037Construction supervision services, namely, construction project management, construction program management and construction management, all for creation, demolition, and decommissioning of facilities and sites; Construction administration, namely, construction consultation, construction planning, and construction of government, commercial and industrial properties, and inspections during building construction; Construction program management and construction management services and maintenance services for large and complex engineering projects to build, maintain and improve healthcare complexes, k-12 schools, colleges and universities, public buildings, power plants, commercial, industrial and manufacturing facilities, and federal, state and municipal infrastructure, namely, bridges, highways, interchanges, tunnels, intelligent transportation systems (ITS), mass transit systems, airports, port and harbor facilities, and water supply, and water and waste treatment and distribution systems; maintenance and improvement in the nature of repair of public buildings, commercial, industrial and manufacturing facilities, and federal, state and municipal infrastructure, namely, bridges, highways, mass transit systems, and airportsSECTION 8 - CANCELLEDMar 29, 1996
039Logistics services for governmental defense and energy entities or their agents or contractors, namely, warehousing services, namely, storage, distribution, and packing for shipment of materials in storage, namely, equipment, apparatus, supplies, ammunition, raw materials, and other associated materials for others; all of the above excluding logistics and distribution services for governmental defense and energy entities or their agents or contractors in the nature of commercial document and package shipping and delivery, warehousing related to the aforementioned excluded logistics and distribution services, and commercial freight forwarding servicesSECTION 8 - CANCELLED—
040Environmental remediation services, namely, soil, waste and/or water treatment services; Waste management; environmental pollution control services, namely, air, water, groundwater, waste water, soil treatment, and environmental remediation services, namely, decontamination of unexploded ordinance and hazardous, toxic and radioactive materials cleanupSECTION 8 - CANCELLEDNov 14, 1997
041Training in the use and operation of computer software and hardware all for use in the fields of assessment and compliance audits for antiterrorism threat and vulnerability risk assessments, transportation infrastructure, power, water and food supply, and security systems; Training in the fields of environmental management and pollution control, waste management and remediation engineering, process engineering and design and corporate reporting; training in the field of aircraft flightSECTION 8 - CANCELLEDNov 14, 1997
042Engineering and architectural design, namely, creating plans, specification and preliminary and final designs for others for large and complex engineering projects to build, maintain and improve healthcare complexes, k-12 schools, colleges and universities, public buildings, power plants, energy facilities, commercial, industrial and manufacturing facilities, and federal, state and municipal infrastructure, namely, bridges, highways, mass transit systems, port and harbor facilities, airports, water supply, and water and waste treatment and distribution systems; Systems engineering for large and complex engineering projects to build, maintain and improve public buildings, power plants, industrial and manufacturing facilities, and federal, state and municipal infrastructure, namely, bridges, mass transit systems, port and harbor facilities, airports, water supply, and water and waste treatment and distribution systems; Technical assistance in the establishment and operation of large and complex engineering projects to build, maintain and improve healthcare complexes, public buildings, commercial, industrial and manufacturing facilities, power plants, and federal, state and municipal infrastructure, namely, highways, mass transit systems, port and harbor facilities, airports, water supply, and water and waste treatment and distribution systems; Technical planning and design services for others in the field of engineering for general building, transportation facilities and infrastructure, manufacturing, sewer waste, power, industrial processes, petroleum, telecommunications, hazardous waste for the energy, defense and security, education, retail, government, manufacturing, industrial, commercial, transportation, transportation security, pollution abatement, air, water, and soil resources and health care industries; Design services for others in the field of defense systems, namely, engineering for development of aviation and ground systems, vehicles, shelters and ground support equipment; Reviewing standards and practices to assure compliance with environmental zoning laws and regulations; reviewing standards and practices to assure compliance with environmental and radiological laws and regulations; Land-use planning services; Design services for others in the field of engineering for air emission control, and flood control; Civil and environmental engineering services, namely, preparing environmental impact assessment, preparing environmental impact assessment in the fields of climate change and bio-diversity, biological, ecological, energy management, and earthquake studies, and compliance reports; Engineering services for water treatment and purification plants and solid waste treatment plants; Computer consultation in the field of computer security; computer security service, namely, restricting access to and by computer networks to and of undesired web sites, media and individuals and facilities; design and development of computer networks; Engineering services with respect to government, commercial and industrial properties; Design of government, commercial and industrial properties for others; Computer and computer network design and engineering, in the fields of geographic information services combining software and information technology to produce visual representations of topographies; Computer application software development for others for simulation and imaging services, Integration of computer systems and networks; Development, updating, and maintenance of databases; Engineering in the field of network and database design and development; Engineering services for large and complex engineering projects to build, maintain and improve healthcare complexes, k-12 schools, colleges and universities, public buildings, power plants, commercial, industrial and manufacturing facilities, and federal, state and municipal infrastructure, namely, bridges, highways, mass transit systems, airports, port and harbor facilities, water supply, and water and waste treatment and distribution systems; Operations for computer systems and computer networks in the nature of computer and network design and engineering, computer application development, computer application integration, development, updating, and maintenance of databases, computer network integration, and computer systems integration for large and complex engineering projectsSECTION 8 - CANCELLEDNov 2, 1984

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 12, 2019C8..CANCELLED SEC. 8 (6-YR)—
May 4, 2019NCS8NOTICE OF CANCELLATION SEC. 8 EMAILED—
Aug 2, 2018PR23POST REGISTRATION ACTION MAILED - SEC. 8 & 15—
Aug 2, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 24, 2018E815TEAS SECTION 8 & 15 RECEIVED—
Jan 24, 2017REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Aug 26, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 26, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Mar 18, 2015TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 24, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 16, 2011MAILPAPER RECEIVED—
Dec 16, 2011TMBNTTAB RELEASE CASE TO TRADEMARKS—
Dec 16, 2011OP.TOPPOSITION TERMINATED NO. 999999—
Dec 16, 2011OP.DOPPOSITION DISMISSED NO. 999999—
Jun 4, 2009OP.IOPPOSITION INSTITUTED NO. 999999—
Jun 4, 2009OPPFOPPOSITION PAPERS RECEIVED AT TTAB—
May 5, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 15, 2009NPUBNOTICE OF PUBLICATION—
Apr 2, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 1, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 25, 2009XAECEXAMINER'S AMENDMENT ENTERED—
Mar 25, 2009GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Mar 25, 2009GNEAEXAMINERS AMENDMENT E-MAILED—
Mar 25, 2009CNEAEXAMINERS AMENDMENT -WRITTEN—
Dec 23, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 23, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 23, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 9, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Dec 9, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Dec 9, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
Dec 9, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 7, 2008GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 7, 2008GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 7, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 1, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Sep 19, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Sep 11, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 10, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 10, 2008XAECEXAMINER'S AMENDMENT ENTERED—
Sep 10, 2008GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 10, 2008GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 10, 2008CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 28, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 27, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 27, 2008ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 6, 2008GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Mar 6, 2008GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 6, 2008CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 5, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Feb 5, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 30, 2008MAILPAPER RECEIVED—
Nov 21, 2007ASCKASSIGNMENT OF OWNERSHIP NOT UPDATED AUTOMATICALLY—
Jul 25, 2007GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 25, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 25, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 18, 2007ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 18, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 18, 2007ALIEASSIGNED TO LIE—
Jun 4, 2007MAILPAPER RECEIVED—
Nov 29, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 29, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 31, 2006DOCKASSIGNED TO EXAMINER—
Aug 31, 2006DOCKASSIGNED TO EXAMINER—
Mar 21, 2006NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance