USPTO serial 78858592
IMAGINACION EN ACCION
Reviewed by CopyMark Law Group
Status 606
- Filing date
- Status date
- Registration date
- —
- Examiner
- SINGLETON, RUDY
- Law office
- INTENT TO USE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with IMAGINACION EN ACCION?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Catherine Mennenga
Catherine Mennenga GENERAL ELECTRIC COMPANY3135 EASTON TPKECorporate Trademark OperationsFAIRFIELD, CT 06828-0001Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 011 | Electric light bulbs; luminescent, incandescent and fluorescent lighting lamps and tubes; lamps and lights for vehicles; luminaries; electric discharge lamps; electric lights for Christmas trees; electric night lights; flashlights; lights for vehicles; air conditioners; clothes dryers; dehumidifiers; humidifiers; electric fans, ceiling fans, freezers; refrigerators; gas and electric stoves; gas and electric ovens and cook tops; microwave ovens for cooking; ventilation hoods for stoves; ventilating exhaust fans; water heaters; water filtering, electric water softening units; steam and gas turbines and generators; electric and gas cooking appliances; namely, coffee makers and percolators; tea makers, namely, electric tea pots; toasters; toaster ovens; electric and gas grills for cooking purposes; electric deep fryers; electric fry pans; electric skillets; electric griddles; electric food/rice steamers; electric woks; electric popcorn makers; ice cream makers; electric waffle irons and kettles; nuclear reactors; electric cup and bottle warmers; hand held electric dryers; and component parts of all the foregoing; water conditioning units for residential purposes; reverse osmosis units, namely, reverse osmosis filtration units for water treatment and membranes therefore; water purification units and systems consisting of clarifiers, electro deionization systems, condensate polishers, vacuum degasification units, ultra filtration units, ultraviolet sterilizers, ion exchangers, acid and caustic regeneration systems, reverse osmosis systems, forced draft decarbonator units, filters, chemical feed systems and bulk storage units, sold with automatic controls and instruments to monitor operating parameters of the units and systems electrochemical liquid purification units for use in the industrial, commercial and municipal sectors | ACTIVE | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 29, 2010 | MAB6 | ABANDONMENT NOTICE MAILED - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Nov 29, 2010 | ABN6 | ABANDONMENT - NO USE STATEMENT FILED | The intent-to-use application was abandoned because no acceptable Statement of Use (or valid extension) was filed before the Notice of Allowance deadline expired. The application is dead unless revived within a limited window. |
| Apr 28, 2010 | EXRA | NOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED | — |
| Apr 27, 2010 | EX5G | SOU EXTENSION 5 GRANTED | — |
| Apr 20, 2010 | EXT5 | SOU EXTENSION 5 FILED | — |
| Apr 20, 2010 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 15, 2009 | EX4G | SOU EXTENSION 4 GRANTED | — |
| Oct 15, 2009 | AITU | CASE ASSIGNED TO INTENT TO USE PARALEGAL | — |
| Oct 1, 2009 | EXT4 | SOU EXTENSION 4 FILED | — |
| Oct 1, 2009 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Apr 24, 2009 | EX3G | SOU EXTENSION 3 GRANTED | — |
| Apr 24, 2009 | EXT3 | SOU EXTENSION 3 FILED | — |
| Apr 24, 2009 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 23, 2008 | EX2G | SOU EXTENSION 2 GRANTED | — |
| Oct 23, 2008 | EXT2 | SOU EXTENSION 2 FILED | — |
| Oct 23, 2008 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Feb 4, 2008 | EX1G | SOU EXTENSION 1 GRANTED | — |
| Feb 4, 2008 | EXT1 | SOU EXTENSION 1 FILED | — |
| Feb 4, 2008 | EEXT | SOU TEAS EXTENSION RECEIVED | The applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use. |
| Oct 30, 2007 | NOAM | NOA MAILED - SOU REQUIRED FROM APPLICANT | A Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date. |
| Aug 7, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 18, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Jun 30, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 30, 2007 | ALIE | ASSIGNED TO LIE | — |
| May 25, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 25, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 25, 2007 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 25, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 30, 2006 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 30, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 2, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 1, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 1, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 21, 2006 | GEAP | EXAMINER'S AMENDMENT/PRIORITY ACTION E-MAILED | — |
| Sep 21, 2006 | CPEA | EXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED | — |
| Sep 19, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 18, 2006 | NWAP | NEW APPLICATION ENTERED | — |