Drawing for WHESSOE

USPTO serial 78927880

WHESSOE

Reviewed by CopyMark Law Group

Filing date
Status date
Registration date
—
Examiner
BEN, LINDSEY HEATHER
Law office
TMEG LAW OFFICE 108 - EXAMINING ATTORNEY ASSIGNED

What this means

These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances. If abandonment was unintentional, consult counsel about a petition to revive. Otherwise file a new application if protection is still needed.

Status 602: These status codes mean the trademark application is abandoned and no longer pending. Common reasons include missing an Office Action response (600), filing without a valid basis (602), express abandonment by the applicant (604), or failure to respond to an examiner's inquiry (618). Revival may be possible in limited circumstances.

Need help with WHESSOE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mark I. Feldman

MARK I FELDMAN DLA PIPER US LLPPO BOX 64807CHICAGO, IL 60664-0807UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006apparatus made of metal for the storage of liquid gases; apparatus of metal for introducing gases into containers; apparatus of metal for receiving liquefied gas; metal containers for gases; metal containers for holding chemical substances; metal containers for liquefied gases; metal containers for oil; metal containers for the storage of natural gas fuel; metal containers for use in storage; metal containers incorporating a pump to dispense the contents; metal cryogenic containers; metal products for use in the gas industry; metal products for use in the oil industry; metal structures; metal tanks containers; metallic building structures; metallic containers; metallic pressurized gas cylinders; receptacles of metal for compressed gases; receptacles of metal for compressed liquid air; receptacles of metal for the industrial use in the storage of gases; receptacles of metal for industrial use in the storage of liquids; storage installations structures of metal; storage modules structures of metal; receptacles of metal for liquid fuel; storage tanks structures of metal; storage tanks of metal; storage units structures of metal; structures of metal; tanks containers of metal; tanks structures of metal; tanks made principally of metal for use in the industry; tanks of metal; tanks of metal for the manufacture of compressed gases; tanks of metal for the manufacture of liquefied gases; tanks of metal for the storage of compressed gases; tanks of metal for the storage of liquefied gases; tanks of metal incorporating pumps for use in dispensing fuelACTIVE—
011cooling apparatus; cooling apparatus for liquids; cooling appliances and installations; cooling elements; cooling installations and machines; cooling installations for deep freezing; cooling installations for fluids; cooling installations for freezing; cooling installations for gas; cooling installations for liquids; cooling installations for refrigerating; deep freezing apparatus; deep freezing installations; apparatus for fluid processing; apparatus for fluid supply; apparatus for freezing; installations for controlling the flow of gases; installations for cooling; installations for freezing; installations for the collection of gases; installations for the collection of liquids; installations for the cooling of fluids; installations for the heating of fluids; installations for the separation of gases; installations for the treatment of liquid suspensions; installations for the treatment of liquids; apparatus for refrigerating; apparatus for refrigerating purposes; apparatus for the cooling of objects using cold gases; apparatus for the controlled supply of fluids; apparatus for the cooling of objects using liquefied gases; apparatus for the controlled supply of fluids; liquid coolers apparatus; refrigerated chambers; refrigerated containers gas; refrigerating apparatus; refrigerating apparatus and machines; refrigerating enclosures for freezing; refrigerating installationsACTIVE—
019articles (non-metallic) for use in building; articles for building purposes (non-metallic); articles (non-metallic) for use in civil engineering construction; articles of concrete for building purposes; articles of concrete for construction purposes; articles (non-metallic) for use in construction; roofs (non-metallic) for building structures; roofs (non-metallic) for buildings; roofs (non-metallic) for structures; roofs made of concrete; roofs made of reinforced concrete; storage installations structures, not of metal; storage modules structures, not of metal; storage tanks structures, not of metalACTIVE—
037supervision of the engineering of structures; supervision of building work; supervision of construction; supervision of construction contracts; supervision of construction projects; structural engineering; supervision (building construction); supervision of building construction; assembling installation of storage systems; provision of construction advice; provision of construction information; provision of information relating to the building industries; provision of information relating to the construction industries; project preparation relating to civil engineering; project preparation relating to construction engineering; plant installation; pipe installation services; on-site construction supervision; on-site construction supervision of civil engineering works; on site project management relating to the construction of buildings; on site building project management; advisory services relating to the construction of buildings; advisory services relating to the construction of civil engineering structures; advisory services relating to the construction of mechanical engineering structures; advisory services relating to constructionACTIVE—
039advisory services relating to the storage of goods; arrangement for the storage of goods; arrangement for the storage of fuels; arrangement of the storage of goods; provision of refrigerated storage facilities; refrigerated storage of goods; refrigerated storage services; services for the storage of goods; storage; storage of fluids; storage of fuel oil; storage of gas; storage of gaseous fuels; storage of goods; storage of goods before and after transportation; storage of goods for transportation; storage of goods in containers; storage of goods prior to delivery; storage of liquids; storage of petroleum products; transport by pipeline; transport of gas by pipelines; transport of goods; transportation of fluids by pipeline; transportation of oil by pipelineACTIVE—
042advisory services relating to industrial design; analysis of the structural behavior of buildings; advisory services relating to industrial engineering; advisory services relating to the design of engineering products; advisory services relating to the safety of engineering products; advisory services relating to the safety of products; engineering; engineering consultancy; engineering design; engineering design and consultancy; engineering feasibility studies; engineering project management services; engineering project studies; engineering research; engineering services for the design of structures; evaluation of performance against bench-mark references; feasibility studies (conducting of); feasibility studies relating designs; feasibility studies relating to material analysis; industrial design; industrial design services; inspection of industrial installations; inspection of plant and machinery; planning design of cooling apparatus; planning design of heating apparatus; preparation of design reports; preparation of reports relating to design; preparation of drawings; preparation of technical reports; preparation of engineering drawings; preparation of engineering reports; preparation of technical studies; preparation of technological reports; process control; process engineering consultations; project management design; project management technical support; project studies (technical); provision of engineering reports; provision of engineers; provision of information relating to industrial design; provision of information relating to industrial engineering; provision of technical consultancy; structural engineering services; provision of technical consultancy to the oil refining industry; technical assessments relating to design; provision of technical consultancy to the petrochemical industry; technical consultancy services relating to structural engineeringACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

Latest event (MAB2): The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.

DateCodeEventWhat it means
Mar 7, 2014MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 7, 2014ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Aug 9, 2013GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Aug 9, 2013GNSIINQUIRY TO SUSPENSION E-MAILED—
Aug 9, 2013CNSISUSPENSION INQUIRY WRITTEN—
Aug 5, 2013RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jan 31, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 31, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Jan 31, 2013CNSLSUSPENSION LETTER WRITTEN—
Jan 31, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 31, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 25, 2013ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jul 26, 2012GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jul 26, 2012GNSIINQUIRY TO SUSPENSION E-MAILED—
Jul 26, 2012CNSISUSPENSION INQUIRY WRITTEN—
Jul 23, 2012RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jan 23, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 23, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Jan 23, 2012CNSLSUSPENSION LETTER WRITTEN—
Jan 23, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 23, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 12, 2012ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jul 13, 2011GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jul 13, 2011GNSIINQUIRY TO SUSPENSION E-MAILED—
Jul 13, 2011CNSISUSPENSION INQUIRY WRITTEN—
Jul 13, 2011RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jan 13, 2011GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 13, 2011GNSLLETTER OF SUSPENSION E-MAILED—
Jan 13, 2011CNSLSUSPENSION LETTER WRITTEN—
Jan 13, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 13, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 13, 2011ALIEASSIGNED TO LIE—
Dec 27, 2010ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jun 29, 2010GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jun 29, 2010GNSIINQUIRY TO SUSPENSION E-MAILED—
Jun 29, 2010CNSISUSPENSION INQUIRY WRITTEN—
Jun 29, 2010RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Dec 29, 2009GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Dec 29, 2009GNSLLETTER OF SUSPENSION E-MAILED—
Dec 29, 2009CNSLSUSPENSION LETTER WRITTEN—
Dec 29, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 29, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 28, 2009ALIEASSIGNED TO LIE—
Dec 24, 2009ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jul 30, 2009GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jul 30, 2009GNSIINQUIRY TO SUSPENSION E-MAILED—
Jul 30, 2009CNSISUSPENSION INQUIRY WRITTEN—
Jul 30, 2009RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION—
Jan 30, 2009GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jan 30, 2009GNSLLETTER OF SUSPENSION E-MAILED—
Jan 30, 2009CNSLSUSPENSION LETTER WRITTEN—
Jan 14, 2009TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 14, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 14, 2009ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jul 15, 2008GNS2NOTIFICATION OF INQUIRY AS TO SUSPENSION E-MAILED—
Jul 15, 2008GNSIINQUIRY TO SUSPENSION E-MAILED—
Jul 15, 2008CNSISUSPENSION INQUIRY WRITTEN—
Jan 15, 2008RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jul 12, 2007GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jul 12, 2007GNSLLETTER OF SUSPENSION E-MAILED—
Jul 12, 2007CNSLSUSPENSION LETTER WRITTEN—
Jun 26, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 26, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 26, 2007ALIEASSIGNED TO LIE—
Jun 14, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 14, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 11, 2006DOCKASSIGNED TO EXAMINER—
Sep 26, 2006TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 18, 2006NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance