Drawing for D

USPTO serial 78931664

D

Reviewed by CopyMark Law Group

Reg. 4026815Status 710
Filing date
Status date
Registration date
Sep 13, 2011
Examiner
AIKENS, RONALD E
Law office
PUBLICATION AND ISSUE SECTION

What this means

Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active. Evaluate filing a new application if you still use the mark, or petition if cancellation was erroneous. Consult counsel on remaining common-law rights.

Status 710: Status 710 means the registration was cancelled because a required Section 8 declaration of continued use was not filed within the deadline (including any grace period). The federal registration is no longer active.

Need help with D?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Adam D. Siegartel

ADAM D. SIEGARTEL PROSKAUER ROSE LLPEleven Times SquareTrademark FileroomNEW YORK, NY 10036-8299

Goods and services

ClassDescriptionStatusFirst use
035Economic analysis; regulatory audit reporting and audit planning in the fields of traffic control, congestion management, emergency services integration, all for the transportation industry; business consultation, business management; business services, namely, facilities management and technical operations; business management services, namely, managing logistics, reverse logistics, supply chain services, supply chain visibility and synchronization, supply and demand forecasting and product distribution processes for othersSECTION 8 - CANCELLED—
037Consultation concerning the construction and rehabilitation of water facilitiesSECTION 8 - CANCELLED—
039Inter-modal freight efficiency, namely, consultation in the movement of inter-modal freight through the entire delivery system, aimed at improving safety and delivery times, reducing delays, fuel consumption, costs and emissions, and enhancing delivery operations for all travel modesSECTION 8 - CANCELLED—
042Engineering and technical consultation in the fields of public transportation and intelligent transportation systems; information technology consultation; computer software design for others; and systems engineering for the transportation infrastructure industry; consultation services in the field of traffic engineering; and transportation planning studies; engineering and technical consultation in the fields of designing ports and harbors, railroads, highways, airports, and parking structures; architectural design and planning of railroads and highways; engineering services for the construction of water treatment and purification plants, solid waste treatment plants, intelligent water systems and other municipal infrastructure facilities; consulting services in the field of environmental assessment, compliance and planning; planning of buildings and infrastructure systems for buildingsSECTION 8 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 20, 2018C8..CANCELLED SEC. 8 (6-YR)—
Sep 13, 2016REM1COURTESY REMINDER - SEC. 8 (6-YR) E-MAILED—
Sep 13, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 10, 2011SUNANOTICE OF ACCEPTANCE OF STATEMENT OF USE E-MAILED—
Aug 9, 2011REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Aug 8, 2011CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Jul 5, 2011SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Jul 1, 2011IUAFUSE AMENDMENT FILED—
Jul 1, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jul 1, 2011EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Dec 10, 2010EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Dec 9, 2010EX5GSOU EXTENSION 5 GRANTED—
Dec 7, 2010EXT5SOU EXTENSION 5 FILED—
Dec 7, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 4, 2010EXRANOTICE OF APPROVAL OF EXTENSION REQUEST E-MAILED—
Jun 3, 2010EX4GSOU EXTENSION 4 GRANTED—
Jun 1, 2010EXT4SOU EXTENSION 4 FILED—
Jun 1, 2010EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 4, 2010EX3GSOU EXTENSION 3 GRANTED—
Dec 24, 2009EXT3SOU EXTENSION 3 FILED—
Dec 24, 2009EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jun 25, 2009EX2GSOU EXTENSION 2 GRANTED—
Jun 24, 2009EXT2SOU EXTENSION 2 FILED—
Jun 24, 2009EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jan 9, 2009EX1GSOU EXTENSION 1 GRANTED—
Jan 9, 2009AITUCASE ASSIGNED TO INTENT TO USE PARALEGAL—
Dec 19, 2008EXT1SOU EXTENSION 1 FILED—
Dec 19, 2008EEXTSOU TEAS EXTENSION RECEIVEDThe applicant requested more time to file a Statement of Use before the Notice of Allowance deadline. Each extension typically adds six months. A limited number of extensions are available for intent-to-use applications not yet in use.
Jul 1, 2008NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
Apr 8, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 19, 2008NPUBNOTICE OF PUBLICATION—
Mar 5, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 4, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 19, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Feb 19, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 19, 2008ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 18, 2007GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 18, 2007GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 18, 2007CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 25, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 25, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 25, 2007ALIEASSIGNED TO LIE—
Jun 13, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 13, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 13, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 9, 2006DOCKASSIGNED TO EXAMINER—
Jul 22, 2006MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Jul 21, 2006NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance