USPTO serial 78973607
DIBBLE ENGINEERING
Reviewed by CopyMark Law Group
- Filing date
- Status date
- Registration date
- Sep 25, 2007
- Examiner
- BUTLER, ANDREA P
- Law office
- GENERIC WEB UPDATE
What this means
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
Need help with DIBBLE ENGINEERING?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
Owner
Dibble & Associates Consulting Engineers
Phoenix, AZ, US
Other trademarks owned by Dibble & Associates Consulting Engineers
Dibble & Associates Consulting Engineers
Phoenix, AZ, US
Other trademarks owned by Dibble & Associates Consulting Engineers
Dibble & Associates Consulting Engineers
Phoenix, AZ, US
Other trademarks owned by Dibble & Associates Consulting Engineers
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jennifer A. Van Kirk
Jennifer A. Van Kirk Lewis Roca Rothgerber Christie LLP201 East Washington Street, Suite 1200PHOENIX, AZ 85004UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 042 | Civil engineering and infrastructure planning services; Airport infrastructure services, namely location studies, airport master planning, inspection, design and construction surveys and design of runways, taxiways, parking aprons, t-hangars, grading, pavement rehabilitation, drainage, detention basins, street systems, parking facilities, utilities, fencing and security/access control systems, fuel storage, site infrastructure for airport terminals and building facilities; Drainage and flood control engineering services, namely design of detention/retention basins, open channels, river works, storm drains, drop structures, energy disipators, spillways, culvertss, scour and bank protection, dams; Drainage and flood control engineering services, namely area drainage master studies and plans, preliminary design, administration and inspection, design and construction surveys, flood insurance studies, drainage manuals, 404 permits/401 certification, floodplain delineations, FEMA CLOMR/LOMR, bridge scour analysis, hydrologic and hydraulic modeling and analysis, sediment transport, erosion and degradation studies, two-dimensional modeling and benefit-cost analysis, inundation studies, emergency action plans (EAP), flood damage and risk assessment, dambreak modeling and flood hazard mapping, floodplain delineation and mapping, stream navigability, erosion setback evaluation and mapping; Site infrastructure engineering services, namely fire protection supply, gas services, grading and drainage, master planning, water/sewer system modeling, municipal coordination/permits, NPDES/stormwater permits, off site improvements, retention/detention, traffic analysis, underground, at-grade and elevated parking and water/sewer services; Engineering survey services, namely control surveys, three dimensional imaging, topographic surveys, boundary surveys, right-of-way/easement surveys, global positioning surveys, photogrammetry control surveys, ALTA/ACSM surveys, construction staking, as-built surveys; Geographic information system services, namely asset inventory and management involving water and wastewater, storm drainage, water distribution, and gas pipeline systems, data collection and conversion, street centerlines, database design, development, and management, VB/VBA programming and avenue scripting, web development, data deployment, maintenance, and management, integration of water distribution systems into GIS, integration of sanitary sewer systems into GIS, integration of storm drainage systems into GIS, fire hazard evaluation and mapping; Transportation engineering services, namely major street design, highway location studies, highway design concept reports, highway/freeway design, street systems, sidewalk improvements, roadway signing/striping design, traffic impact analysis, traffic interchange design, traffic control plans, drainage analysis and design, right-of-way analysis and plans, legal descriptions and exhibits, utility design and relocations, construction administration/inspection, quality assurance/quality control, constructability reviews, comprehensive project management, partnering/teamwork leadership, public involvement, agency coordination, English and metric capabilities, parks and trails, utility and agency coordination; Water resource engineering services, namely transmission/distribution main design, booster pump station design, reservoir design, well design, pipeline rehabilitation, water system appraisals, water and sewer master planning, sanitary sewer main design, lift station design, effluent reuse/reclaimed pipelines, water/waste water treatment, irrigation delivery systems, gas pipeline design, infrastructure rehabilitation, agency coordination, phased implementation planning and public involvement programs | ACTIVE | Jan 24, 2007 |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Dibble & Associates Consulting Engineers
- Other trademarks owned by Dibble & Associates Consulting Engineers
- Other trademarks owned by Dibble & Associates Consulting Engineers
- Other trademarks in Class 042
- Similar marks named DIBBLE ENGINEERING
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 25, 2026 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Oct 5, 2017 | NA89 | NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED | — |
| Oct 5, 2017 | RNL1 | REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS) | The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active. |
| Oct 5, 2017 | 89AG | REGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTED | The USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary. |
| Oct 5, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 1, 2017 | E89R | TEAS SECTION 8 & 9 RECEIVED | — |
| Jul 12, 2017 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jul 12, 2017 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Sep 25, 2016 | REM2 | COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED | — |
| Sep 13, 2013 | NA85 | NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED | — |
| Sep 13, 2013 | C15A | REGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK. | — |
| Sep 13, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 30, 2013 | 815F | REGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED | — |
| Aug 30, 2013 | E815 | TEAS SECTION 8 & 15 RECEIVED | — |
| Jan 18, 2008 | A7OK | AMENDMENT UNDER SECTION 7 - PROCESSED | — |
| Dec 12, 2007 | PLGL | ASSIGNED TO PARALEGAL | — |
| Nov 7, 2007 | AMD7 | SEC 7 REQUEST FILED | — |
| Nov 7, 2007 | PAPER RECEIVED | — | |
| Sep 25, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 10, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 20, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Apr 30, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 24, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 23, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 23, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 20, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 18, 2007 | IUAA | USE AMENDMENT ACCEPTED | — |
| Apr 17, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 17, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 17, 2007 | AUPC | AMENDMENT TO USE PROCESSING COMPLETE | — |
| Apr 17, 2007 | ALIE | ASSIGNED TO LIE | — |
| Mar 23, 2007 | IUAF | USE AMENDMENT FILED | — |
| Mar 23, 2007 | EAAU | TEAS AMENDMENT OF USE RECEIVED | — |
| Mar 7, 2007 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 7, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Mar 3, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 2, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 2, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 9, 2007 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 9, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 5, 2007 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 19, 2006 | NWAP | NEW APPLICATION ENTERED | — |