Drawing for D

USPTO serial 78973613

D

Reviewed by CopyMark Law Group

Reg. 3370920Status 800Renewal
Filing date
Status date
Registration date
Jan 15, 2008
Examiner
BUTLER, ANDREA P
Law office
GENERIC WEB UPDATE

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Status 800: Status 800 means the registration was renewed after acceptable combined Section 8 and Section 9 filings. The mark remains registered for another 10-year term with active federal protection.

Need help with D?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*

Plus Government fees of $650

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jennifer A. Van Kirk

Jennifer A. Van Kirk Lewis Roca Rothgerber Christie LLP201 East Washington Street, Suite 1200PHOENIX, AZ 85004UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
042Civil engineering and infrastructure planning services; Airport infrastructure services, namely location studies, airport master planning, construction administration and inspection, design and construction surveys and design of runways, taxiways, parking aprons, t-hangars, grading, pavement rehabilitation, drainage, detention basins, street systems, parking facilities, utilities, fencing and security/access control systems, fuel storage, site infrastructure for airport terminals and building facilities, Drainage and flood control engineering services, namely design of detention/retention basins, open channels, river works, storm drains, drop structures, energy dissipators, spillways, culverts, scour and bank protection, dams; Drainage and flood control engineering services, namely area drainage master studies and plans, preliminary design, administration and inspection, design and construction surveys, flood insurance studies, drainage manuals, 404 permits/401 certification, floodplain delineations, FEMA CLOMR/LOMR, bridge scour analysis, hydrologic and hydraulic modeling and analysis, sediment transport, erosion and degradation studies, two-dimensional modeling and benefit-cost analysis, inundation studies, emergency action plans (EAP), flood damage and risk assessment, dambreak modeling and flood hazard mapping, floodplain delineation and mapping, stream navigability, erosion setback evaluation and mapping; Site infrastructure engineering services, namely fire protection supply, gas services, grading and drainage, master planning, water/sewer system modeling, municipal coordination/permits, NPDES/stormwater permits, off site improvements, retention/detention, traffic analysis, underground, at-grade and elevated parking and water/sewer services; Engineering survey services, namely control surveys, three dimensional imaging, topographic surveys, boundary surveys, right-of-way/easement surveys, global positioning surveys, photogrammetry control surveys, ALTA/ACSM surveys, construction staking, as-built surveys; Geographic information system services, namely asset inventory and management involving water and wastewater, storm drainage, water distribution, and gas pipeline systems, data collection and conversion, street centerlines, database design, development, and management, VB/VBA programming and avenue scripting, web development, data deployment, maintenance, and management, integration of water distribution systems into GIS, integration of sanitary sewer systems into GIS, integration of storm drainage systems into GIS, fire hazard evaluation and mapping; Transportation engineering services, namely major street design, highway location studies, highway design concept reports, highway/freeway design, street systems, sidewalk improvements, roadway signing/striping design, traffic impact analysis, traffic interchange design, traffic control plans, drainage analysis and design, right-of-way analysis and plans, legal descriptions and exhibits, utility design and relocations, construction administration/inspection, quality assurance/quality control, constructability reviews, comprehensive project management, partnering/teamwork leadership, public involvement, agency coordination, English and metric capabilities, parks and trails, utility and agency coordination; Water resource engineering services, namely transmission/distribution main design, booster pump station design, reservoir design, well design, pipeline rehabilitation, water system appraisals, water and sewer master planning, sanitary sewer main design, lift station design, effluent reuse/reclaimed pipelines, water/waste water treatment, irrigation delivery systems, gas pipeline design, infrastructure rehabilitation, agency coordination, phased implementation planning and public involvement programsACTIVEJan 24, 2007

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 8, 2018NA89NOTICE OF ACCEPTANCE OF SEC. 8 & 9 - E-MAILED—
Jan 8, 2018RNL1REGISTERED AND RENEWED (FIRST RENEWAL - 10 YRS)The trademark registration was renewed for another 10-year term after acceptable maintenance filings. RNL1, RNL2, and RNL3 indicate which renewal cycle (first, second, or third 10-year term) was recorded. The registration remains active.
Jan 8, 201889AGREGISTERED - SEC. 8 (10-YR) ACCEPTED/SEC. 9 GRANTEDThe USPTO accepted your combined Section 8 declaration and Section 9 renewal application. The registration is renewed for another 10-year term. The next combined maintenance filing will be due at the following 10-year anniversary.
Jan 8, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 8, 2017E89RTEAS SECTION 8 & 9 RECEIVED—
Jan 15, 2017REM2COURTESY REMINDER - SEC. 8 (10-YR)/SEC. 9 E-MAILED—
Oct 10, 2013NA85NOTICE OF ACCEPTANCE OF SEC. 8 & 15 - E-MAILED—
Oct 10, 2013C15AREGISTERED - SEC. 8 (6-YR) ACCEPTED & SEC. 15 ACK.—
Oct 10, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 3, 2013815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Oct 3, 2013E815TEAS SECTION 8 & 15 RECEIVED—
Jan 15, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 12, 2007REGVLAW OFFICE REGISTRATION REVIEW COMPLETED—
Nov 27, 2007CNPRALLOWED PRINCIPAL REGISTER - SOU ACCEPTED—
Nov 13, 2007SUPCSTATEMENT OF USE PROCESSING COMPLETE—
Oct 30, 2007IUAFUSE AMENDMENT FILED—
Oct 30, 2007EISUTEAS STATEMENT OF USE RECEIVEDThe applicant filed a Statement of Use with specimens showing the mark in actual commerce. The USPTO will review the filing for compliance. If accepted, the mark can proceed to registration; if deficient, the USPTO may issue a requirement or office action.
Aug 21, 2007NOAMNOA MAILED - SOU REQUIRED FROM APPLICANTA Notice of Allowance means your intent-to-use application cleared examination and opposition but is not registered yet. You must file a Statement of Use showing the mark in commerce, or request an extension, before the deadline — usually six months from the notice date.
May 29, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 9, 2007NPUBNOTICE OF PUBLICATION—
Mar 28, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 23, 2007ALIEASSIGNED TO LIE—
Feb 27, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 26, 2007XAECEXAMINER'S AMENDMENT ENTERED—
Feb 26, 2007GNEAEXAMINERS AMENDMENT E-MAILED—
Feb 26, 2007CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 9, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 9, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 5, 2007DOCKASSIGNED TO EXAMINER—
Sep 20, 2006MDSMNOTICE OF DESIGN SEARCH CODE MAILED—
Sep 19, 2006NWAPNEW APPLICATION ENTERED—

Frequently asked questions

Related guidance