Drawing for INBA

USPTO serial 79011817

INBA

Reviewed by CopyMark Law Group

Reg. 3187522Status 711
Filing date
Status date
Registration date
Dec 19, 2006
Examiner
HAMMEL, LAURA A
Law office
TMO LAW OFFICE 116

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with INBA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrey H. Handelsman

Jeffrey H. Handelsman Greenblum & Bernstein, P.L.C.1950 Roland Clarke PlaceReston, VA 20191-1411UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007Machines and machine tools, namely casting machines, steel working machines and metalworking machine tools; electric motors and engines not for land vehicles for use in the steel working industry; machine coupling and transmission components not for land vehicles, namely transmission gears for machines and bearings for transmission shafts, being parts of machines; foundry machines, namely casting machines; ore-treating machines; industrial manipulator machines; metalworking machines; electromechanical apparatus and valves, namely spherical valves and butterfly valves being parts of metalworking machines; apparatus and installations for granulation, namely granulation machines for use in the steel working industry; filtering apparatus and installations for materials, namely machine used for process filtration in the steel working industry; compressed air machines, namely compressed air pumps, pneumatic motors and pneumatic cylinder actuators; conveyor belts; engine timing components, namely driving chains other than for land vehicles; transmission chains, other than for land vehicles, namely transmission gears for machines; control mechanisms for machines, engines and motors, namely hydraulic and pneumatic actuators for machines; hydraulic and pneumatic controls for machines, motors and engines, namely hydraulic and pneumatic door closers and openers; hydraulic and pneumatic devices for granulation of cinders and slag, namely granulating machines; parts of machines, namely heat exchangers in the nature of radiators for motors and engines; ignition parts for internal combustion engines, namely condensers; pumps, namely piston type pumps for cooling engines; centrifugal pumps; filters for steel working machinesSECTION 7(e) - CANCELLED—
011Heating, drying, ventilation and water distribution apparatus, namely industrial dryers for heating and dehumidifying, heat exchangers not being part of machines, multiple hearth furnaces; drying drums, namely kilns; water conduit installations, namely water purification settling tanks; water distribution installations, namely water purification settling tanks; water supply installations, namely water purification settling tanks; water cooling installations, namely water cooling towers that feature cooling fans; water and gas filtering units for industrial use; pressurized water tanks, namely hot water tanks; water cooling apparatus, namely pipe heat exchangers not being part of machines that feature cooling fans; air filters for industrial iron-and-steel metallurgy installations; coolers for liquids, namely pipe heat exchangers not being part of machines that feature cooling fans; cooling apparatus and installations, namely pipe heat exchangers not being part of machines that feature cooling fans; steam accumulators.SECTION 7(e) - CANCELLED—
037Construction of blast furnaces; repair of blast furnaces; installation of blast furnaces; installation, maintenance and repair of hardfacing apparatus for surface treatment, namely installation, maintenance and repair of oxygen converters for steel production and granulation tanks; construction supervision and managementSECTION 7(e) - CANCELLED—
040Treatment of materials, namely treatment of metal or steel; information concerning treatment of materials; material treatment services, namely granulation of slag of blast furnaces and of copper matte of copper production units; material treatment services, namely filtration of slag of blast furnaces and of copper matte of copper production units; material treatment services, namely granulation and filtration of blast furnace slag and converter slag.SECTION 7(e) - CANCELLED—
042Scientific research in the steelmaking industry; design and development of computers and software for others; legal services; building consultancy, namely planning of buildings and infrastructure systems for buildings; construction drafting; technical project studies, namely conducting of feasibility studies; technical advice about steel; conducting engineering surveys; engineering; mechanical research; technical research services in the field of iron-and-steel metallurgy; scientific, technical and mechanical research with regard to granulation of materials, as well as relating to iron-and-steel metallurgy and non-ferrous metallurgy.SECTION 7(e) - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 14, 2025RNWLINTERNATIONAL REGISTRATION RENEWED—
Jan 4, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Nov 30, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Nov 30, 2018INPCINVALIDATION PROCESSED—
Nov 14, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Nov 2, 2018FINVFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 14, 2018C7..CANCELLED SECTION 7-TOTAL—
Feb 22, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 19, 2018C7RFREQUEST FOR SECT 7 TOTAL SURRENDER FILED—
Jan 19, 2018ES7STEAS SECTION 7 SURRENDER RECEIVED—
Jan 18, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 18, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 27, 2017RFNTREFUSAL PROCESSED BY IB—
Dec 19, 2015REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jun 24, 2015ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 24, 2015REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 20, 2015RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 2, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 1, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 7, 2013NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Jan 7, 2013C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Jan 7, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Dec 11, 2012715FREGISTERED - SEC. 71 & SEC. 15 FILED—
Dec 11, 2012ES75TEAS SECTION 71 & 15 RECEIVED—
Mar 28, 2008FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 23, 2007FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 23, 2007FIMPFINAL DISPOSITION PROCESSED—
Jul 10, 2007FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 19, 2006R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 3, 2006PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 13, 2006NPUBNOTICE OF PUBLICATION—
Aug 10, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Aug 4, 2006ALIEASSIGNED TO LIE—
Aug 3, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 3, 2006CNEAEXAMINERS AMENDMENT MAILED—
Aug 2, 2006XAECEXAMINER'S AMENDMENT ENTERED—
Aug 2, 2006CNEAEXAMINERS AMENDMENT -WRITTEN—
Jul 25, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 20, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 20, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 21, 2006CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Apr 21, 2006CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 30, 2006DOCKASSIGNED TO EXAMINER—
Mar 9, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 30, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 30, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 4, 2006ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 4, 2006REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 4, 2006TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Sep 30, 2005RFNTREFUSAL PROCESSED BY IB—
Sep 6, 2005RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 3, 2005RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 2, 2005CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 1, 2005DOCKASSIGNED TO EXAMINER—
Jul 22, 2005NWAPNEW APPLICATION ENTERED—
Jul 21, 2005REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—