Drawing for BELL LESS TOP

USPTO serial 79012023

BELL LESS TOP

Reviewed by CopyMark Law Group

Reg. 3196940Status 706Renewal
Filing date
Status date
Registration date
Jan 9, 2007
Examiner
WILKE, JOHN
Law office
GENERIC WEB UPDATE

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with BELL LESS TOP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $1,795*

Plus Government fees of $3,250

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeffrery H. Greger

Jeffrery H. Greger Hauptman Ham, LLP2318 Mill RoadSuite 1400Alexandria, VA 22314-2866

Goods and services

ClassDescriptionStatusFirst use
006Building materials of metal for industrial users in the steel industry, namely trusses and girders; Prefabricated steel buildings; Sheets, tubes, pipes of steel, cast iron or metal alloys; Metal fluid storage tanks; Metal storage containers for general use; Non mechanical metal hoppers; Metal tube valves, not including machine parts; Reinforcing materials for metal compressed air or gas ducts, namely metal braces; Metal reinforcing materials for building, namely braces; Metal penstock pipes; Pot hooks of metal; Manifolds of metal for pipelines; Tubes of metal; Pipework of metal; Pipes of metal; Slide guides and spillways of metal; Metal turntables for use in the steel industry; Metal cladding for use in buildingACTIVE—
007Conveyors for use with iron and steelworking machines hoists for use with blast furnaces casting machines motors and engines not for land vehicles machine coupling and transmission components not for land vehicles, namely bearings, shafts and coupling, for hydraulic cylinder to actuating lever Foundry machines, namely continuous casting machines industrial manipulators for forging presses and forgoing machines conveyors loading ramps in the form of conveyors feeders for iron-and-steel furnaces or shaft furnaces loaders for iron-and-steel furnaces or shaft furnaces hydraulic controls for machines hydraulic, electric or pneumatic actuators for machines machine parts, namely hydraulic or pneumatic openers or closers for loaders used on iron-and-steel furnaces or for shaft furnaces machines and machine parts, namely, mechanical hoppers for unloading; machines and machines parts, namely, rotary slide guides and spillways; machine stands; machine parts, namely valves for use in casting machines, clack valves being part of casting machines, power transmission gears for use in machines hydraulic valve actuators and parts therefor power transmission components for machines, namely, driving chainsACTIVE—
009Electric and electronic controls for remote control of industrial operations; electric and electronic controls for remote control of loaders for use with iron and steel furnaces or with shaft furnaces; Electronic monitoring apparatus, namely cameras and scanners, ampere meters, voltmeters, screws, heat monitoring apparatus, namely temperature sensors, monitoring for iron and steel furnaces and shaft furnaces, namely temperature indicators, vibration detectors, metal sampling head, thermovision cameras, monitoring instruments for iron-and-steel furnaces and shaft furnaces, namely temperature indicators, detectors and sensors for monitoring and managing loading devices for iron-and-steel or shaft furnacesACTIVE—
037Construction and repair of blast furnaces; Installation, servicing and repair of installations, equipment and machines for iron-and-steel metallurgy; Steel structure construction works; Mechanical engineering; Assembly, installation, servicing, repair and maintenance of loaders for iron-and-steel or shaft furnacesACTIVE—
042Scientific research and development; industrial design; Building engineering services; Scientific research and scientific and technological design with regard to iron-and-steel metallurgy and loaders for iron-and-steel or shaft furnaces; Industrial analysis and research services; Design and development of computers and software for the benefit of industrial users in the steel industry; Software design and development for loaders for iron-and-steel or shaft furnaces to the benefit of industrial users in the steel industry; Engineering consultation; Technical project studies; Engineering; Engineering with regard to loaders for iron-and--steel or shaft furnaces; Construction drafting; Construction drafting with regard to loaders for iron-and-steel or shaft furnaces; Mechanical engineering research; Technical research; Technical consultation and advice relating to the field of engineering especially in connection with installations, equipment and processes for iron-and-steel metallurgy, namely, technical consultation; Patent exploitationACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 9, 2026REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jun 20, 2024RNWLINTERNATIONAL REGISTRATION RENEWED—
Feb 9, 2018NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Feb 9, 201871AGREGISTERED-SEC.71 ACCEPTED—
Jan 10, 2018EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jul 11, 2017PR71POST REGISTRATION ACTION MAILED - SEC.71—
Jul 4, 201771AFREGISTERED-SEC.71 FILED—
Jul 4, 2017ES71TEAS SECTION 71 RECEIVED—
Jan 9, 2016REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Aug 28, 2014RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 2, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 1, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 25, 2013NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jan 25, 201371AGREGISTERED-SEC.71 ACCEPTED—
Jan 25, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jan 9, 2013ES71TEAS SECTION 71 RECEIVED—
Jun 12, 2008NOSUNOTICE OF SUIT—
Jun 11, 2008NOSUNOTICE OF SUIT—
Jun 10, 2008NOSUNOTICE OF SUIT—
May 2, 2008FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Aug 15, 2007FICSFINAL DISPOSITION NOTICE SENT TO IB—
Aug 15, 2007FIMPFINAL DISPOSITION PROCESSED—
Aug 9, 2007FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 29, 2007EXPTEXPARTE APPEAL TERMINATED—
Jan 18, 2007OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 9, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 4, 2007OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 4, 2007OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Oct 24, 2006PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Oct 4, 2006NPUBNOTICE OF PUBLICATION—
Sep 12, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 8, 2006ALIEASSIGNED TO LIE—
Sep 7, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 7, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Sep 5, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Sep 5, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 5, 2006EXPIEX PARTE APPEAL-INSTITUTED—
Sep 5, 2006JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Sep 5, 2006EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Apr 11, 2006UNPRUNRESPONSIVE/DUPLICATE PAPER RECEIVED—
Mar 7, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 7, 2006FAXXFAX RECEIVED—
Mar 3, 2006CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 3, 2006CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Mar 1, 2006ACECAMENDMENT FROM APPLICANT ENTERED—
Feb 17, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 17, 2006FAXXFAX RECEIVED—
Nov 9, 2005DOCKASSIGNED TO EXAMINER—
Sep 2, 2005RFNTREFUSAL PROCESSED BY IB—
Aug 18, 2005RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 18, 2005RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 17, 2005CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2005CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 17, 2005RFWRNON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW—
Aug 13, 2005RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 5, 2005DOCKASSIGNED TO EXAMINER—
Aug 5, 2005NWAPNEW APPLICATION ENTERED—
Aug 4, 2005REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance