USPTO serial 79015216
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction, renovation, installation, maintenance, and repair services for commercial, residential, governmental, retail, industrial, and manufacturing buildings; construction, renovation, installation, maintenance, and repair services for traffic and transport facilities and infrastructure, namely railways, highways, bridges, dams, airports and harbors; construction, renovation, installation, maintenance, and repair services for ports, dams, waterway, river, dredging, sanitation facilities, sediment depots, aquatic disposal facilities, coastal and flood control facilities and infrastructure; construction, renovation, installation, maintenance, and repair services for recreation, coastal protection, and land reclamation; construction, renovation, installation, repair and maintenance for water treatment and purification installations and plants; construction, renovation, installation, maintenance, and repair services for irrigation, drainage, groundwater, surface water, and wastewater management, water treatment, hydrologic and water quality monitoring facilities and infrastructure; and construction, renovation, installation, maintenance, and repair services for specialized premises, commercial and industrial works, facilities, and infrastructure. | SECTION 71 - CANCELLED | — |
| 042 | Architectural design, design, and engineering services in the fields of commercial, industrial, and governmental facilities and infrastructure, ground, water and public transportation, air transportation, port, harbor, and aviation facilities and infrastructure; architectural design and engineering consulting, analysis and design services in the field of highways, streets, roads, tunnels, bridges, right-of-way and traffic management; design and engineering services in the field of traffic management and control, namely adaptive traffic signal controls, tunnel and bridge signaling, and traffic rerouting, emergency and warning signaling and controls; consulting and analysis for environmental protection, namely, detection of contaminants in water and technical consultation in the field of environmental science; design and engineering consulting and analysis services for water irrigation, drainage, treatment, monitoring, transportation and infrastructure; contract and operational architectural design, design in the field of water treatment, monitoring, transportation and infrastructure; engineering and structural design services in the field of commercial, industrial, and governmental buildings and infrastructure; architectural design, design in the field of structural design for commercial, industrial, special use premises, and governmental facilities and infrastructure, highways, streets, roads, tunnels, bridges, right-of-way, water irrigation, drainage, pipelines for water supply, treatment, purification, monitoring, and transportation, and engineering services; engineering analysis, research, planning, and technical engineering consultancy services; planning, design, and engineering in the field of pipelines for water supply, drainage, and irrigation, water purification installations, waste treatment plants, waste water and fresh water plants, and sanitation, sediment depots, aquatic disposal and waste destruction facilities and infrastructure; hydraulic and geotechnologic engineering analysis; technical consulting services in the field of architectural design and engineering in the layout of commercial, industrial, special use, and governmental facilities and premises; technical consulting in the field of environmental engineering, and preparing environmental compliance reports, namely, preparing technical reports and environmental impact statements; architectural design, design, and engineering consultancy services concerning security and survivability of commercial, industrial, and public facilities and infrastructure, ground, water and air transportation facilities and pipelines. | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 5, 2018 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Jan 5, 2018 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jun 5, 2015 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 9, 2015 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Apr 9, 2015 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Oct 7, 2014 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 3, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 15, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 7, 2014 | C71T | CANCELLED SECTION 71 | — |
| Oct 4, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 20, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 3, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 19, 2008 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 10, 2007 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 10, 2007 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 7, 2007 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 12, 2007 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jul 3, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 17, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Mar 28, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 22, 2007 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Mar 8, 2007 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 8, 2007 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 28, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 28, 2007 | ALIE | ASSIGNED TO LIE | — |
| Jan 24, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 28, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 27, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 27, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 27, 2006 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 27, 2006 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 7, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 20, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 20, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 20, 2006 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 19, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 22, 2005 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 21, 2005 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 20, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 14, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 7, 2005 | NWAP | NEW APPLICATION ENTERED | — |
| Oct 6, 2005 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |