Drawing for BSI

USPTO serial 79017082

BSI

Reviewed by CopyMark Law Group

Reg. 3258844Status 404
Filing date
Status date
Registration date
Jul 3, 2007
Examiner
KIM, SOPHIA SUJIN
Law office
TMEG LAW OFFICE 106

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BSI?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
019NON-METALLIC BUILDING MATERIALS, NAMELY, PLASTER, MORTAR BOARD, CONCRETE, TIMBER, LUMBER, BRICKS, CEMENT MIXES, FILLING CEMENT, GLASS BRICKS, GLASS PANES, GLASS TILES, SAFETY GLASS, GLASS PANELS, INSULATED GLASS, LAMINATED FLAT GLASS AND MODIFIED SHEET GLASS; NON-METALLIC RIGID PIPES FOR BUILDING; ASPHALT; PITCH; BITUMEN ASPHALT; TIMBER AND WORKABLE TIMBER; BRICKS; CEMENT MIX FOR BUILDING; CEMENT PARTITIONS AND BUILDING COMPONENTS, NAMELY, SLABS OF CEMENT; NON-METALLIC TRANSPORTABLE BUILDINGS; NON-METALLIC MONUMENTS OF STONE, CONCRETE, OR MARBLE; CONCRETE; CONCRETE BUILDING ELEMENTS, NAMELY, BLOCKS, BRICKS, POSTS, SLABS AND PANELS; NON-METAL EXTERIOR ROLL SHUTTERING FOR CONCRETE; MORTAR FOR BUILDING USESECTION 7(e) - CANCELLED
037CONSTRUCTION AND REPAIR OF STRUCTURES, NAMELY, INDUSTRIAL COMPLEXES, WORKS OF ART, BUILDINGS, AND FACTORIES; CONSTRUCTION OF MARITIME AND RIVER INSTALLATIONS, NAMELY, BRIDGES, ABUTMENTS, BRIDGE ABUTMENTS, DIKES, EMBANKMENTS, DAMS, MILL PONDS, RIVER BASINS, TIDAL BASINS, HOLDING BASINS, AND RESERVOIRS; ASPHALTING; RENTAL OF CONSTRUCTION EQUIPMENT; CONSTRUCTION SUPERVISION AND MANAGEMENT OF BUILDING SITE WORK; INFORMATION ON CONSTRUCTION AND REPAIR SERVICES; DEMOLITION OF BUILDINGS; MASONRY; PLASTERING; SCAFFOLDING ERECTION AND REPAIRSECTION 7(e) - CANCELLED
042ENGINEERING AND SURVEYING SERVICES; ENGINEERING SERVICES, NAMELY, CARRYING OUT EVALUATIONS, APPRAISALS, RESEARCH WORK AND WRITING REPORTS IN SCIENCE AND TECHNOLOGY; SCIENTIFIC RESEARCH; INDUSTRIAL RESEARCH RELATING TO CIVIL AND MECHANICAL ENGINEERING IN THE FIELDS OF RESIDENTIAL CONSTRUCTION, CONSTRUCTION OF BRIDGES, ABUTMENTS, AND BRIDGE ABUTMENTS, STABILIZED STRUCTURES ON LAND, MECHANICAL STABILIZATION OF LAND AND STRUCTURES, FILLS AND EMBANKMENTS, RETAINING WALLS, DIKES, TUNNELS, DAMS, MILL PONDS, RIVER BASINS, TIDAL BASINS, HOLDING BASINS, RESERVOIRS, AND SILOS; CHEMICAL LABORATORIES; MATERIALS TESTING; TECHNICAL PROJECT STUDIES AND RESEARCH RELATING TO CIVIL AND MECHANICAL ENGINEERING, NAMELY, STUDIES IN THE FIELDS OF RESIDENTIAL CONSTRUCTION, CONSTRUCTION OF BRIDGES, ABUTMENTS, AND BRIDGE ABUTMENTS, STABILIZED STRUCTURES ON LAND, MECHANICAL STABILIZATION OF LAND AND STRUCTURES, FILLS AND EMBANKMENTS, RETAINING WALLS, DIKES, TUNNELS, DAMS, MILL PONDS, RIVER BASINS, TIDAL BASINS, HOLDING BASINS, RESERVOIRS, AND SILOS; ARCHITECTURAL CONSULTING; TECHNICAL RESEARCH RELATING TO CIVIL AND MECHANICAL ENGINEERING IN THE FIELDS OF RESIDENTIAL CONSTRUCTION, CONSTRUCTION OF BRIDGES, ABUTMENTS, AND BRIDGE ABUTMENTS, STABILIZED STRUCTURES ON LAND, MECHANICAL STABILIZATION OF LAND AND STRUCTURES, FILLS AND EMBANKMENTS, RETAINING WALLS, DIKES, TUNNELS, DAMS, MILL PONDS, RIVER BASINS, TIDAL BASINS, HOLDING BASINS, RESERVOIRS, AND SILOSSECTION 7(e) - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 12, 2026DETHDEATH OF INTERNATIONAL REGISTRATION
Dec 11, 2025DETHDEATH OF INTERNATIONAL REGISTRATION
Nov 25, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED
Dec 21, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED
Nov 14, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED
Dec 21, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED
Jun 11, 2015RNWLINTERNATIONAL REGISTRATION RENEWED
Jun 5, 2015INNTTOTAL INVALIDATION PROCESSED BY THE IB
Mar 20, 2015INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Mar 20, 2015INPCINVALIDATION PROCESSED
Sep 6, 2014INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Mar 13, 2014GPNXNOTIFICATION PROCESSED BY IB
Jan 6, 2014C7..CANCELLED SECTION 7-TOTAL
Dec 19, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Dec 6, 2013C7RFREQUEST FOR SECT 7 TOTAL SURRENDER FILED
Dec 6, 2013ES7STEAS SECTION 7 SURRENDER RECEIVED
Sep 19, 2008FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Nov 10, 2007FICSFINAL DISPOSITION NOTICE SENT TO IB
Nov 10, 2007FIMPFINAL DISPOSITION PROCESSED
Nov 7, 2007FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jul 3, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 10, 2007OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Apr 26, 2007OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Apr 26, 2007OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Apr 17, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 28, 2007NPUBNOTICE OF PUBLICATION
Mar 1, 2007PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Mar 1, 2007ALIEASSIGNED TO LIE
Jan 26, 2007CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 14, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Dec 14, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Dec 14, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 22, 2006GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 22, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 13, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 22, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 22, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2006TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jan 19, 2006RFNTREFUSAL PROCESSED BY IB
Dec 22, 2005RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Dec 21, 2005RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 20, 2005CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 14, 2005DOCKASSIGNED TO EXAMINER
Nov 30, 2005NWAPNEW APPLICATION ENTERED
Nov 28, 2005REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance