USPTO serial 79017458
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Pina M. Campagna
Pina M. Campagna Carter, DeLuca & Farrell LLP576 Broad Hollow RoadMelville, NY 11747United States| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Electric motors, namely, asynchronous motors, synchronous motors, linear motors, reluctance motors, and motors with integrated inverters; planetary geared motors; parts to electric motors, namely, gearboxes; torque converters, not for land vehicles; reduction gears for machines; machine parts, namely, servo gears, angular gears, variable speed gears, heavy industrial gears; compact drives, namely, integrated drives consisting of electric motor, reduction gear and frequency inverter in one casing; parts to electric motors, namely, drives for overhead monorails; gearwheels; electric generators; machine parts, namely, controllers; machine parts, namely, housings for motors and gears; parts to electric motors, namely, adapters; machine motor parts, namely, stators; fans for machine engines; fans for machine motors; machine parts and fittings, namely, bearings, metal gaskets, mechanical sealing rings, couplings, brakes, magnetic brakes, transmission drive shafts; parts of all aforesaid goods, all aforesaid goods not for land craft ] | SECTION 71 - CANCELLED | — |
| 009 | [ Electronic controls for motors; programmable electronic controls for motors; electronic positioning and processing controls for drives; ] software for controlling machines and drives; software for controlling industrial processes; software for monitoring industrial processes; software for projecting of drives; software for projecting industrial systems; [ electrical parameter boxes, namely, computer hardware for machine readable data collections; devices for monitoring and controlling electric motors and geared motors, namely, electronic controls for motors; drive converters, namely, frequency converters for the electronic control of rotary speed; computer hardware, namely, drive converters with integrated positioning and processing control; electric cables; electric switches; electric wires; electrical distribution boxes, namely, distributors for electric energy and/or information; electrical connectors, namely, electric connecting devices; electronic displays, namely, LCD displays; LED displays; electric indicator panels, namely, electronic operator panels for controlling machines; remote control devices, namely, radio transmitters; electronic and electro technical measuring devices, namely, instruments for measuring torque, revolution speed, angular position voltage or current; rev meters; encoders and incremental encoders, namely, devices for measuring rotary speed and/or position of drives; integrated circuits; semiconductors; electric and electronic controlling devices; oil level sensors; temperature sensors; electrical body sound sensors; ] downloadable electronic publications in the nature of brochures and manuals in the field of industrial machinery; [ connection cables, namely, field bus cables; electrical switches, namely, field bus switches; electric signs, namely, electronic nameplates; personal computers; laptop computers; industrial personal computers; network devices, namely, field bus cables and switches; network devices for wireless networks, namely, radio transmitters; transformers; devices and systems for the contactless transmission of electric energy and information comprised of pick-up coils, transformers, line cables, and converters; electronic and electro technical devices for the safe monitoring of drives, namely, safety guards; computer hardware, namely, drive converters with integrated monitoring and safety function; parts of all aforesaid goods ] | ACTIVE | — |
| 037 | [ Installation of industrial machinery; maintenance of electric motors, gearboxes and drive electronics; repair and upkeep of electronic, electric and/or mechanical controls, drives and drive components; maintenance and installation of brakes; vehicle lubrication change service; mobile upkeep services, namely, repair of electric motors, gearboxes and drive electronics ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 9, 2026 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Sep 9, 2026 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 7, 2026 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 18, 2026 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 15, 2026 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Mar 13, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 28, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 28, 2021 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jan 28, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 28, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Feb 23, 2018 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Dec 20, 2017 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Dec 20, 2017 | INPC | INVALIDATION PROCESSED | — |
| Dec 12, 2017 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 12, 2017 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Apr 12, 2017 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Apr 12, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Oct 23, 2016 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 14, 2015 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 3, 2015 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jun 26, 2014 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 16, 2014 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 16, 2013 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED | — |
| May 16, 2013 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 16, 2013 | 715F | REGISTERED - SEC. 71 & SEC. 15 FILED | — |
| May 16, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 29, 2013 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 1, 2008 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 24, 2007 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 24, 2007 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 15, 2007 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 17, 2007 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| May 15, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| May 3, 2007 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 3, 2007 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 27, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 7, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Jan 9, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 4, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 3, 2007 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jan 3, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 3, 2007 | ALIE | ASSIGNED TO LIE | — |
| Nov 27, 2006 | PAPER RECEIVED | — | |
| Nov 15, 2006 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 14, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 14, 2006 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Nov 4, 2006 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Sep 30, 2006 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 25, 2006 | ALIE | ASSIGNED TO LIE | — |
| Sep 15, 2006 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 8, 2006 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Aug 11, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Aug 11, 2006 | PAPER RECEIVED | — | |
| Jul 11, 2006 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 10, 2006 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 10, 2006 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jun 5, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 5, 2006 | PAPER RECEIVED | — | |
| Dec 31, 2005 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 12, 2005 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 9, 2005 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 8, 2005 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 2, 2005 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 2, 2005 | NWAP | NEW APPLICATION ENTERED | — |
| Dec 1, 2005 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |