USPTO serial 79018104
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $650
Intellectual Property Holdings AS
N-0114 Oslo, NO
Intellectual Property Holdings AS
Oslo, NO
Intellectual Property Holdings AS
N-0114 Oslo, NO
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Charlene A. Azema
Charlene A. Azema Knobbe, Martens, Olson & Bear, LLP2040 Main Street, 14th FloorIrvine, CA 92614United States| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Oil and gas production machinery, apparatus being parts, equipment, systems or other apparatus or oil and gas well machinery, namely, drilling and workover systems comprising drilling derrick, workover risers, substructures, risers and riser systems, namely, production risers, drilling risers, service/workover risers and riser connectors and riser handling power tools, winches, windlasses, chain stoppers for use in equipping and building sea-going vessels and oil and gas drilling rigs; oil and gas well machinery, apparatus being parts, equipment, systems or other apparatus or oil and gas well machinery, namely, wellheads, and Christmas trees; subsea pumping, compression and processing systems comprising separation, crude oil conditioning, water treatment and/or injection, pumping/compression, and heat exchange mass transfer devices for use in subsea extraction, processing and exporting of oil and natural gas; oil and gas well machinery, apparatus being parts, equipment systems or other apparatus or oil and gas well machinery, namely, wireline, tractor and logging products, comprising wireline tractor devices, for functions such as scale removal, milling/side-tracking, sand-bailing, perforating and plug-setting for use down hole in the extraction, processing and exporting of oil and natural gas; electrical pumps, namely, fluidising pumps for medium consistency pumps, centrifugal pumps, line shaft pumps and multiphase pumps used for crude oil transportation, firefighting and seawater pumping systems, lift pumps, lift caissons, and booster pumps; heaters and heat exchangers being parts of machines, inert gas electric generators for production of liquefied natural gas, natural gas liquids and petroleum products; control modules, namely, pump control valves for products of combustible gases and recovery of chemicals and for the optimization of such processes; oil and gas well drilling machine and parts and fittings therefor ] | SECTION 71 - CANCELLED | — |
| 012 | [ Ships, fast boats, sea-going vessels, and structural parts and fittings therefor for use in equipping, building, maintaining and fitting out sea-going vessels, ships and other fixed and floating vessels for the storage and transportation of gas ] | SECTION 71 - CANCELLED | — |
| 020 | [ Furniture, mirrors, picture frames; all sorts of storage, filing and handling solutions, namely, shelves and brackets sold as a unit ] | SECTION 71 - CANCELLED | — |
| 029 | [ Meat, fish, poultry and game; meat extracts; preserved, dried and cooked fruits and vegetables; jellies, jams, compotes; eggs, milk and milk products, excluding ice cream, ice milk and frozen yogurt; edible oils and fats ] | SECTION 71 - CANCELLED | — |
| 035 | Advertising and business management consultancy; business management; business management and consultation; business administration and management; business administration and office work; business operation, business administration and office functions | ACTIVE | — |
| 037 | [ Building construction; building construction and repair; repair and installation services relating to offshore oil and gas production plants and onshore industrial facilities including plants for the processing of waste water and the processing and manufacturing of nuclear materials, pharmaceuticals, metals, polymers and chemicals, oil refining and onshore oil and gas processing; construction, modification, repair and installation of pulp and paper plants and of chemical recovery, pollution control and energy generating energy plants for use in the chemical, pulp and paper industries; construction, modification, repair and installation of power plants ] | SECTION 71 - CANCELLED | — |
| 040 | [ Treatment of metal ] | SECTION 71 - CANCELLED | — |
| 042 | [ Scientific research, industrial research, development of computer programs, design for others, and technological consultation in the technology field of the following, all in the fields of automated drilling, fixed and floated concrete platform/marine structure technology, down hole technology, reservoir technology, subsea technology, fixed and floating oil and gas platform technology, including hulls, jackets and riser systems, the processing, pumping, storage and transportation of oil and gas, petrochemical and biochemical process technology, pharmaceutical technology, power/recovery boilers, nuclear waste and pumping technology, shipbuilding, ship and fixed and floating concrete platform instrumentations, processing ferrous and non-ferrous metals/ores, seafood, and biomarine product research ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jul 16, 2026 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 3, 2026 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 3, 2026 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Jun 3, 2026 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 3, 2026 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 3, 2026 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jun 3, 2026 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Nov 27, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Mar 8, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 23, 2020 | CORV | REVIEW OF CORRESPONDENCE COMPLETE - ADDRESS UPDATED | — |
| Jun 5, 2020 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 17, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 18, 2018 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jul 1, 2018 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 1, 2017 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 1, 2017 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Oct 30, 2017 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Dec 4, 2016 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Nov 15, 2015 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jul 17, 2015 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jun 26, 2015 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jun 26, 2015 | INPC | INVALIDATION PROCESSED | — |
| Feb 20, 2015 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 20, 2014 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jun 20, 2014 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jun 20, 2014 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 3, 2014 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Dec 22, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 16, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 8, 2011 | CORV | REVIEW OF CORRESPONDENCE COMPLETE - ADDRESS UPDATED | — |
| Aug 25, 2011 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Aug 24, 2011 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 15, 2009 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Apr 10, 2008 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Mar 24, 2008 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 24, 2008 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Mar 4, 2008 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Dec 4, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 18, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Aug 29, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Aug 13, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Aug 10, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Aug 10, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Aug 10, 2007 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Aug 10, 2007 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Aug 10, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Aug 9, 2007 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 23, 2007 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 6, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 6, 2007 | ALIE | ASSIGNED TO LIE | — |
| Jun 25, 2007 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 25, 2007 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 1, 2007 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 1, 2007 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jun 1, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 1, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 1, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 1, 2007 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| May 31, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 31, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 31, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 17, 2007 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 17, 2007 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 5, 2006 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 4, 2006 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 14, 2006 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Oct 30, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 30, 2006 | PAPER RECEIVED | — | |
| May 18, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 28, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 28, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 28, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 28, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 28, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 19, 2005 | NWAP | NEW APPLICATION ENTERED | — |
| Dec 15, 2005 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |