Drawing for RITTAL LIQUID COOLING PACKAGE

USPTO serial 79020959

RITTAL LIQUID COOLING PACKAGE

Reviewed by CopyMark Law Group

Reg. 3233642Status 404
Filing date
Status date
Registration date
Apr 24, 2007
Examiner
HIRSCHMAN, PAMELA
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with RITTAL LIQUID COOLING PACKAGE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Douglas H. Pauley

Douglas H. Pauley PAULEY PETERSEN & ERICKSON2800 W HIGGINS RD STE 365HOFFMAN ESTATES, IL 60169UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Claddings made of sheet metal for construction and building of walls and doors; securement apparatus made of metal, namely retaining brackets; assembly apparatus and assembly aids, fixed or displaceable, made of metal, namely assembly plates, and pivot frames; closure apparatus, namely metal door locking cylinders and keys for locks; labelling bars made of metal for switchgear cabinet doorsSECTION 70 - CANCELLED
009Cabinets for the accommodation of electrical and electronic components; switchgear cabinets, made of metal or plastic material which are composed of frames, housings and desks adapted for the accommodation of electrical components, in the fields of industry, installations, electronics, computers, interactive terminal systems and data transfer, which are also earthquake, vandalism and explosion proof; switchgear cabinets used in connection with support-arm systems composed primarily of support arms, angle adaptors and wall or base mountings for use as supports for surfaces; assembly carriers, namely, plug-in subassemblies for insertable assemblies having electronic circuits; signaling devices that emit sounds and light for monitoring and security of switchgear cabinets; electric current distribution components, namely, electronic connectors and electronic apparatus adaptors and load splitters; electronic devices for monitoring gas pipelines, namely, gas pressure adjustment stations; cabling aids made of metal or plastic material, for electrical cables, namely, cable collection bars, cable inserts, rubber clamping profiles; current supply apparatus, namely, power packs; inserts for electronic assembly carriers, namely, cards equipped with electronic components, bus plates, cassettes; electrical plug connectors; claddings made of glass or plastic for doors and walls for switchgear cabinets sold as a unit therewith; compartment bases made of metal for switchgear cabinets sold as a unit therewith; furniture rollers made of metal for switchgear cabinets sold as a unit therewith; bases made of metal for switchgear cabinets sold as a unit therewithSECTION 70 - CANCELLED
011Equipment for air conditioning, namely evaporative air cooling units, heat exchangers, filter fans, heaters, in particular for switchgear cabinets; installation accessories, namely switchgear cabinet lightsSECTION 70 - CANCELLED
020[ Labelling bars made of plastic material for switchgear cabinet doors ]SECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 16, 2015DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED
Oct 16, 2015DETHDEATH OF INTERNATIONAL REGISTRATION
Nov 7, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED
Oct 23, 2014INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Jun 24, 2014NA71NOTICE OF ACCEPTANCE OF SEC. 71 - MAILED
Jun 24, 2014INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Dec 23, 2013INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Oct 21, 2013NA15SEC. 15 ACKNOWLEDGEMENT - MAILED
Oct 21, 201315AKREGISTERED - SEC. 15 ACKNOWLEDGED
Oct 18, 201315AFREGISTERED - SEC. 15 AFFIDAVIT FILED
Oct 18, 2013E15RTEAS SECTION 15 RECEIVED
Apr 23, 2013NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Apr 23, 201371.PREGISTERED - PARTIAL SEC 71 ACCEPTED
Apr 23, 2013APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Apr 8, 201371AFREGISTERED-SEC.71 FILED
Apr 8, 2013ES71TEAS SECTION 71 RECEIVED
Nov 11, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED
Aug 6, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED
Jul 11, 2008FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Oct 4, 2007FICSFINAL DISPOSITION NOTICE SENT TO IB
Oct 4, 2007FIMPFINAL DISPOSITION PROCESSED
Sep 27, 2007FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Apr 24, 2007R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 6, 2007PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jan 17, 2007NPUBNOTICE OF PUBLICATION
Dec 13, 2006PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Dec 13, 2006ALIEASSIGNED TO LIE
Nov 27, 2006CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 27, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 27, 2006CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Sep 20, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 20, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 20, 2006TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Apr 21, 2006RFNTREFUSAL PROCESSED BY IB
Mar 30, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Mar 29, 2006RFRRREFUSAL PROCESSED BY MPU
Mar 28, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 27, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 24, 2006DOCKASSIGNED TO EXAMINER
Mar 24, 2006NWAPNEW APPLICATION ENTERED
Mar 23, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance