USPTO serial 79021487
Reviewed by CopyMark Law Group
This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Plus Government fees of $3,250
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Steel constructions, namely, surge bins, apron feeders, spreaders, sizers; metal silos; metal hoppers, not as part of a machine | ACTIVE | — |
| 007 | Machines, machine parts, devices and installations assembled therefrom for conveying and preparing mineral, metallic and organic raw materials and piece goods, comprising substantially stationary, semi-mobile and mobile band conveyors, belt conveyors, chain conveyors, roller conveyors, jointed-band conveyors, platform conveyors, box conveyors, [ vibrating conveyors, mechanical vibration generators, ] feeder troughs, scraper conveyors, [ screw conveyors, ] bucket-type machines, mechanical mixed-bed devices, scrapers, belt sedimenters, waste dumping devices, waste recovery devices, mechanical ship loading equipment, namely, mechanical shiploaders and barge loading devices; mechanical ship unloading equipment, namely, mechanical ship unloaders, mechanical ship unloaders with grab and hook, and mechanical continuous ship unloaders; mechanical wagon loading equipment, namely, mechanical railcar loaders, wagon loading stations, and train loading stations; mechanical wagon unloading equipment, namely, mechanical railcar unloaders and mechanical wagon tipplers; bunker draw-off devices, excavators, chassis, breakers, crushers, hopper wagons, hoist towers, conveyor bridges and cranes [, and mechanical sorters ] | ACTIVE | — |
| 012 | Vehicles, namely, skips, mining cars, mobile conveyors, mobile stacking conveyors, mobile reclaiming conveyors, mobile transfer conveyors, mobile mining conveyors, mobile crushers, mobile sizers, cable reel cars, hopper cars; apparatus for conveying overland, namely, overland conveyors; chassis specifically crawlers and rail mounted travel wheel assemblies; dump wagons, belt wagons, cable-drum wagons, cableways and winches as part of cableways, * all aforementioned goods, excluding acoustic alarms and electrical accessories for motor vehicles and motorcycles * | ACTIVE | — |
| 037 | Installation, assembly, maintenance and repair of machines, machine parts, devices and installations assembled therefrom for conveying and preparing mineral, metallic and organic raw materials and piece goods; assembly of steel structures; painting work | ACTIVE | — |
| 040 | [ Metal machining, specifically cutting metal to size, such as flame cutting and laser cutting, metal shaping, such as press-folding and rolled-sheet bending, joining and connecting metals, such as welding, material-removing machining, such as turning, boring, drilling and milling; metal surface finishing, specifically zinc phosphating and powder-coating ] | SECTION 71 - CANCELLED | — |
| 042 | Building and construction planning and consultancy, technical project planning and consultancy, inspection of machines, machine parts, devices and installations assembled therefrom for materials handling plants used for conveying, crushing, processing, storage handling, loading and unloading of ores, minerals and raw materials as a technical check, services of engineers, research in the area of machine construction, software programming and acquisition and evaluation of operating and process data, all relating to machines, machine parts, devices and installations assembled therefrom for conveying and preparing mineral, metallic and organic raw materials and piece goods | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 16, 2026 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Mar 13, 2026 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Sep 26, 2025 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Sep 25, 2025 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jan 26, 2024 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 9, 2023 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 4, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 4, 2021 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Feb 4, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 4, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 29, 2021 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Jan 21, 2021 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Jan 21, 2021 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jan 21, 2021 | EWOR | TEAS WITHDRAWAL AS DOMESTIC REPRESENTATIVE RECEIVED | — |
| Jan 21, 2021 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 21, 2021 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 21, 2021 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 11, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 6, 2018 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 8, 2018 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Feb 8, 2018 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Feb 5, 2018 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 5, 2017 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jun 5, 2017 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Jun 5, 2017 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 19, 2017 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Sep 10, 2015 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jun 12, 2015 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 28, 2015 | XXSS | GENERIC MADRID TRANSACTION SENT TO IB | — |
| Feb 28, 2015 | XXCR | GENERIC MADRID TRANSACTION CREATED | — |
| Feb 17, 2015 | IRIV | IRREGULARITY ON INVALIDATION RECEIVED FROM IB | — |
| Jun 26, 2014 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 8, 2014 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 8, 2013 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED | — |
| May 8, 2013 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 8, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 22, 2013 | 715F | REGISTERED - SEC. 71 & SEC. 15 FILED | — |
| Apr 22, 2013 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jun 4, 2009 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Jun 4, 2009 | PLGL | ASSIGNED TO PARALEGAL | — |
| Jun 3, 2009 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| May 14, 2009 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jun 27, 2008 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 18, 2007 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 18, 2007 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 17, 2007 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 13, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 26, 2006 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 6, 2006 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 3, 2006 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 2, 2006 | ALIE | ASSIGNED TO LIE | — |
| Oct 17, 2006 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Oct 6, 2006 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 20, 2006 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 20, 2006 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 20, 2006 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 20, 2006 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 20, 2006 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 25, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 12, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 5, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 5, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 5, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 4, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 26, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 25, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 23, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 22, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 14, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 14, 2006 | NWAP | NEW APPLICATION ENTERED | — |
| Apr 13, 2006 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |