Drawing for NOVONOX

USPTO serial 79021596

NOVONOX

Reviewed by CopyMark Law Group

Reg. 3658126Status 404
Filing date
Status date
Registration date
Jul 21, 2009
Examiner
BLANE, SUZANNE
Law office

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with NOVONOX?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
001[ Glues, namely, epoxy glue for general bonding and repair purposes; gelatine glue; gum arabic glue; latex glue; glue for use in metal industry ]SECTION 71 - CANCELLED
003[ Cleaning preparations for refined steel and for plastic ]SECTION 71 - CANCELLED
004[ All purpose lubricants; industrial lubricants ]SECTION 71 - CANCELLED
006METAL HARDWARE, NAMELY, DOWELS, ANCHORS, SCREW ANCHORS, BOLTS, COUPLING ANCHORS, SCREWS, NUTS, WASHERS, BALL-LOCK PINS, COTTER PINS, SUPPORT PINS, THREADED STUDS, RIVETS, TOOTH LOCK WASHERS, THREADED RODS, THREADED BOLTS, CABLE JUNCTION CLAMPING SLEEVES, METAL EXPANDING CLAMPING SLEEVES FOR AFFIXING SCREWS, FLAT KEYS FOR HEIGHT ADJUSTMENT, SPRINGS, SPRING LOCK WASHERS, NON-ELECTRIC CABLES, METAL CABLE WIRE, WIRES, SCREW PITCH COUPLINGS, COUPLINGS, PIPE COUPLINGS FOR USE WITH LIQUID PIPES, STEAM PIPES; MANUALLY OPERATED METAL VALVES, METAL VALVESSECTION 70 - CANCELLED
007[ Components and parts of machines made of metal, of plastic materials, of precious metal, or of rubber, namely, slider bearings, anti-friction bearings, bearing supports, flange bearings, guide elements used for machine parts, bearing ends, spherical bearing rod ends, angle hinges, lubricators, shafts, namely, cam shafts and shafts for pumps, hubs for bearing bushings, printing rollers, wheels, ball chutes, ball elements, retractable legs, linchpins, hinges, fasteners, clamping elements and supports, brackets, shims, clamping ties, positioning elements, fixing elements, pressure arms, stops, stop bolts, lock bolts, drive chains, articulated shafts, threaded spindles, chain guides, clutches, shaft connections, sprockets, racks, protection devices for machines, namely, air filters for mechanical purposes, operating fly-wheels, operating control buttons, control buttons, tensioning levers, clamp levers, cables for lifts and for cranes, wire coiling machines, wire brushes, ignition wires, wire hoists, control levers, pneumatic control elements, protective covers and hoods for parts of machines ]SECTION 71 - CANCELLED
008HAND-OPERATED TOOLS AND TOOL PARTS MADE OF COMMON METALS, OF PRECIOUS METALS, OR OF RUBBER, NAMELY, SLIDER BEARINGS, ANTI-FRICTION BEARINGS, BEARING SUPPORTS, FLANGE BEARINGS, GUIDE ELEMENTS BEARING ENDS, SPHERICAL BEARING ROD ENDS, ANGLE HINGES, LUBRICATORS, LAWN ROLLERS, SHARPENING WHEELS FOR KNIVES AND BLADES, RETRACTABLE LEGS FOR SUPPORTING TOOLS, LINCHPINS, HINGES FASTENERS, CLAMPING BLOCKS, NAMELY,CLAMPING BUSHINGS,CARPENTER'S CLAMP LEVERS, HOOK CLAMPS, SWIVELING CLAMPS, CLAMPING VICE JAWS, CARPENTER'S FLAT CLAMPS, RETAINING STRIP CLAMPS, HOLD-DOWN CLAMPS, SIDE CLAMPS, MOUNTED CLAMPS, HEIGHT CLAMPS, QUICK-ACTION CLAMPS, SUPPORTS; SHIMS; CLAMPING TIES, VICE WORK PIECE STOPS, STOP BOLTS, LOCK BOLTS, GARDEN TOOLS, NAMELY, CULTIVATORS; HAND TOOLS, NAMELY, DRILLS, FILES, HAMMERS, SAWS, PLIERS, CHISELS, SCREWDRIVERS, WRENCHES, MOUNTING TOOLS, NAMELY, EXTENSION BARS FOR HAND TOOLS, PRODUCTION TOOLS, NAMELY, PLIERS AND GRIPPING TOOLSSECTION 70 - CANCELLED
009[ Electric and electronic control panels; measuring instrumentation and apparatus, namely, digitizers, bevels, derived-unit measuring machines and apparatus, resistance measuring instruments; computer programs recorded on data media for use in database management ]SECTION 71 - CANCELLED
014[ Hardware made of precious metals, namely, dowels, anchors, screw anchors, bolts, coupling anchors, screws, nuts, washers, ball-lock pins, cotter pins, support pins,threaded studs, rivets, tooth lock washers, threaded rods, threaded bolts, cable junction clamping sleeves, metal expanding clamping sleeves for affixing screws, flat keys for height-adjustment,springs, spring lock washers, non-electric cables, precious metal cable wire ]SECTION 71 - CANCELLED
017RUBBER OR VULCANIZED FIBER SPRING WASHERS, NAMELY MULTI-PURPOSE HIGH PRESSURE WASHERS FOR MACHINESSECTION 70 - CANCELLED
018[ Leather goods, namely, unfitted leather for the covering of machines ]SECTION 71 - CANCELLED
020[ hardware not of metal, namely, dowels, anchors, screw anchors, bolts, coupling anchors, screws, nuts, washers, ball- lock pins, cotter pins, support pins, threaded studs, rivets, tooth lock washers, threaded rods,threaded bolts,cable junction clamping sleeves, expanding clamping sleeves for affixing screws, flat keys for height-adjustment, spring lock washers ]SECTION 71 - CANCELLED
042[ Development of computer programs for use as a substitute for catalogues ]SECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Feb 26, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Feb 26, 2026DETHDEATH OF INTERNATIONAL REGISTRATION
Jun 13, 2021INNPPARTIAL INVALIDATION PROCESSED BY THE IB
May 19, 2021INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
May 19, 2021INPCINVALIDATION PROCESSED
May 17, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jan 1, 2021CHLDCHANGE OF OWNER RECEIVED FROM IB
Sep 17, 2020NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Sep 17, 202071.PREGISTERED - PARTIAL SEC 71 ACCEPTED
Sep 14, 2020EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Sep 4, 2020PR71POST REGISTRATION ACTION MAILED - SEC.71
Aug 31, 2020EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Mar 11, 2020PR71POST REGISTRATION ACTION MAILED - SEC.71
Mar 10, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jan 21, 2020ES71TEAS SECTION 71 RECEIVED
Jul 26, 2018CHLDCHANGE OF OWNER RECEIVED FROM IB
Jul 21, 2018REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Jun 23, 2017INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Apr 20, 2017INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Apr 20, 2017INPCINVALIDATION PROCESSED
Apr 16, 2017INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Mar 31, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED
Dec 22, 2016CHLDCHANGE OF OWNER RECEIVED FROM IB
Sep 7, 2016PRANPOST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED
Aug 16, 2016NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Aug 16, 201671.PREGISTERED - PARTIAL SEC 71 ACCEPTED
Jan 21, 2016PR71POST REGISTRATION ACTION MAILED - SEC.71
Jan 19, 2016EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Sep 10, 2015RNWLINTERNATIONAL REGISTRATION RENEWED
Jul 17, 2015PR71POST REGISTRATION ACTION MAILED - SEC.71
Jul 17, 2015APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jun 19, 201571AFREGISTERED-SEC.71 FILED
Jun 19, 2015ES71TEAS SECTION 71 RECEIVED
Mar 17, 2014TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
May 18, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Oct 27, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB
Oct 27, 2009FIMPFINAL DISPOSITION PROCESSED
Oct 21, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jul 21, 2009R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 5, 2009PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 15, 2009NPUBNOTICE OF PUBLICATION
Mar 27, 2009PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Mar 25, 2009CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 25, 2009ACECAMENDMENT FROM APPLICANT ENTERED
Mar 25, 2009CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 23, 2009MAILPAPER RECEIVED
Sep 22, 2008CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 22, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 15, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 15, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 9, 2008MAILPAPER RECEIVED
May 30, 2008CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 29, 2008CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 23, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Apr 11, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Mar 28, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Mar 27, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 27, 2008CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Mar 21, 2008CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Feb 7, 2008ACECAMENDMENT FROM APPLICANT ENTERED
Feb 7, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 4, 2008MAILPAPER RECEIVED
Sep 28, 2007OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Sep 13, 2007OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Sep 13, 2007OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Sep 6, 2007CHLDCHANGE OF OWNER RECEIVED FROM IB
Jul 31, 2007CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 30, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 9, 2007ACECAMENDMENT FROM APPLICANT ENTERED
Jul 9, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jul 9, 2007ALIEASSIGNED TO LIE
Jun 25, 2007MAILPAPER RECEIVED
Dec 12, 2006CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 11, 2006CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 8, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 23, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 23, 2006MAILPAPER RECEIVED
May 5, 2006RFNTREFUSAL PROCESSED BY IB
Apr 19, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 19, 2006RFRRREFUSAL PROCESSED BY MPU
Apr 16, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 15, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 14, 2006DOCKASSIGNED TO EXAMINER
Apr 14, 2006NWAPNEW APPLICATION ENTERED
Apr 13, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance