Drawing for CONZERV

USPTO serial 79023307

CONZERV

Reviewed by CopyMark Law Group

Reg. 3540428Status 404
Filing date
Status date
Registration date
Dec 2, 2008
Examiner
FENNESSY, EDWARD JOHN
Law office
MADRID PROCESSING UNIT

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CONZERV?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Machines for use in the generation, transmission, distribution, supply and conservation of energy and parts and fittings for said machines, namely, electric current generators, generators of electricity; fuel economizers for motors and engines; starters for motors and engines; regulators as parts of machines used for monitoring and controlling electrical energy generation and usage, parts and fittings for said machinesSECTION 71 - CANCELLED—
009Instruments to measure, monitor, record, display, analyze, secure, protect and control processes and parameters, namely, digital power and energy meters, power consumption monitors, power consumption data loggers, data processors and controllers for use in monitoring, measuring and distributed control of consumption of power, energy and the wastage of materials and energy; sensors for the detection of physical and environmental parameters, namely, heat sensors, light, pressure, motion and distance sensors, gas and flow sensors, power and energy sensors, parts, fittings and testing apparatus for the aforesaid goods; computer software for monitoring and controlling use of electrical power; computer hardware, central processing units, and data converters for monitoring and controlling use of electrical power; computer and telecommunications networking hardware, data transmitters, and data receivers for use in power usage monitoring and control systems; transformers, active and passive power conditioners, namely, rectifiers, converters, inverters, filters, used in electrical applications; high-frequency electric switches for use in the generation, conduction, switching, transformation, inversion, distribution, storage, supply, regulation, conservation and management of processes and energy in its various forms; energy conservation apparatus, namely, electricity and emissions quality meters, electronic meters, capacitors, block reactors, relays, filters and generator controllers; solar and photovoltaic cells, solar collector arrays, inverters, batteries; downloadable electronic publications in the nature of newsletters and magazines in the field of energy, safety and environment, database management software in the field of energy management, instructional and training computer software for training employees in the field of energy management, efficient energy use and the use and operation of energy management hardware, software and power measuring and control devices; rechargeable batteries to provide powerSECTION 71 - CANCELLED—
011Uninterruptible power supplies for the generation of energy, namely, wind energy power plants; refrigerators, hot water tanks, plate and rotary heat exchangers not being part of machines, steam generators and pressure vessels, air filters for domestic use and industrial installations, air conditioning units, water purification and filtering units, water regulators for water supply and sanitation apparatus and conduits, environmentally friendly or waterless toilets, chemical and biological waste treatment units, parts, fittings for the aforesaid goodsSECTION 71 - CANCELLED—
016Printed material, namely, brochures, books, newsletters, periodicals, leaflets, data sheets, case studies, reports and manuals about energy conservation, control and management and environmental control and protection; photographs; stationery; instructional and teaching material in the area of energy conservation, control and management, and environmental control and protection, printed material for packaging and display, namely, paper bags, cardboard cartons, printed display materials like posters and point of purchase displaysSECTION 71 - CANCELLED—
035Compilation and systematization of parametric and statistical data in databanks for energy audits; energy auditing on buildings; energy conservation services, namely, energy auditing, inspection of energy supply and energy management systems in buildings and business consultation services relating to efficient and cost effective energy use, promoting awareness about energy conservation and efficient power utilization by business customers through energy use audits on buildings and studies and research in the field of efficient power generation and energy and environmental conservation; providing consulting and information on energy efficiency, financial analysis of cost of adopting more energy efficient equipment and energy management devices versus the savings which will result from the use of these goods and services; corporate consulting concerning energy managementSECTION 71 - CANCELLED—
037Building construction and repair; Installation, repair and maintenance of energy generation, transmission, distribution and conservation equipment not for facility management, building automation, electronic and pneumatic temperature control, fire alarm, and security control, namely, energy meters, power analyzers, load managers, computerized capacitors, block reactors, harmonic filters, generator controllers and protection relays not for facility management, building automation, electronic and pneumatic temperature control, fire alarm, and security controlSECTION 71 - CANCELLED—
041Education services, namely, organizing and providing classes, seminars, and workshops in the fields of energy, safety and environment, work, work environment, safety, living environment, organization of work, work profitability and work productivity, heating, air conditioning, lighting and local and remote computing; providing of classes, seminars, workshops and training in the field of energy generation and utility distributionSECTION 71 - CANCELLED—
042Energy auditing; Engineering services for building instrumentation and monitoring, and environmental consulting; technical project studies, namely, technical consultation, design, research and modeling in the field of energy management and conservation and environmental protection and control, work environment, safety, living environment, organization of work, work profitability and work productivity, heating, air conditioning, lighting and local and remote computing; Environmental services, namely, technical consultation in the field of design for others in the field of environmental engineering; Construction planning; design and development of computer hardware and software; quality control for othersSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 7, 2017INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 13, 2016DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
May 13, 2016DETHDEATH OF INTERNATIONAL REGISTRATION—
Apr 25, 2016INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Apr 25, 2016INPCINVALIDATION PROCESSED—
Mar 3, 2016INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jul 3, 2015C71TCANCELLED SECTION 71—
Nov 7, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 5, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 10, 2009CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Sep 4, 2009CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Mar 19, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 19, 2009FIMPFINAL DISPOSITION PROCESSED—
Mar 2, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Dec 2, 2008EXPTEXPARTE APPEAL TERMINATED—
Dec 2, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 16, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 27, 2008NPUBNOTICE OF PUBLICATION—
Aug 11, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 23, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 3, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 3, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 3, 2008ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jun 6, 2008GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Jun 6, 2008GECDACTION DENYING REQ FOR RECON E-MAILED—
Jun 6, 2008CNCFACTION CONTINUING A FINAL - COMPLETED—
Jun 3, 2008ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
May 5, 2008PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Apr 21, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 19, 2008ALIEASSIGNED TO LIE—
Apr 15, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 24, 2008TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 24, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 24, 2008ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 13, 2008CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED—
Mar 7, 2008CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Feb 23, 2008GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Feb 23, 2008GECDACTION DENYING REQ FOR RECON E-MAILED—
Feb 23, 2008CNCFACTION CONTINUING FINAL - COMPLETED—
Feb 22, 2008GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Feb 22, 2008GECDACTION DENYING REQ FOR RECON E-MAILED—
Feb 22, 2008CNCFACTION CONTINUING FINAL - COMPLETED—
Jan 25, 2008ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 25, 2008EXPIEX PARTE APPEAL-INSTITUTED—
Jan 25, 2008JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jan 25, 2008EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Aug 7, 2007GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 7, 2007GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 7, 2007CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 6, 2007TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 6, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 6, 2007TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 3, 2007CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jan 10, 2007GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 10, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 12, 2006TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 11, 2006CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 11, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 11, 2006TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 11, 2006TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jun 29, 2006RFNTREFUSAL PROCESSED BY IB—
Jun 13, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jun 13, 2006RFRRREFUSAL PROCESSED BY MPU—
Jun 11, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jun 10, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 9, 2006DOCKASSIGNED TO EXAMINER—
Jun 9, 2006NWAPNEW APPLICATION ENTERED—
Jun 8, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance