USPTO serial 79024591
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Melanie I. Rauch
Melanie I. Rauch Setter Roche Smith & Shellenberger LLP1860 Blake StreetSuite 500Denver, CO 80202| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Castings for steel-making, mechanical engineering and apparatus construction, slabs, blocks, billets, cold- and hot-rolled fine, medium and coarse steel sheets, cold- and hot-rolled steel strips, surface-treated and refined metal sheets, sheet-metal pressed and stamped parts, namely for the automotive industry, forged metal sheets, surface-treated, refined and welded plates, namely for the automotive industry, steel pipe connection sleeves, flanges, rolled and drawn steel wire, surface-treated, refined and galvanized steel wire, metal screws, metal nuts, nails, metal pins, metal cables, metal rivets, metal bolts, metal rings for sealing, metal chains, metal discs, metal washers, metal clamps, rails made from metal, rail and switch points fixing material made from metal, switch points construction and switch points components, which are used to switch trains between railroad tracks, sleepers for railway tracks made from metal, cold- and hot-rolled and welded tubes made from metal, seamless metal tubes, hot- and cold-rolled profiled sections, namely for the construction, furniture, agriculture and automotive industries, bar steel, rod steel, structural steel mats, reinforcing steel, ribbed reinforcing steel, sectional steel, cold- and hot-rolled metal brackets, rings made from steel for sealing, masts and scaffolding made from metal, metal fence posts and trellises, espaliers, metal road safety rails, metal overhead signs, metal racks, doors and door frames, metal gates, steel frame profiled sections, namely for the construction industry, metal noise prevention walls, metal façade claddings for construction, all of the above goods are made of metal; metal tubes and partly wrought common metals and their alloys; iron ore, pig iron, steel, cast iron | SECTION 70 - CANCELLED | — |
| 035 | Business consultancy, management and supervision of businesses; company and organization management, business management of projects in the field of construction, metallurgy, the railways and automotive engineering; business project management in the field of computer hardware and software | SECTION 70 - CANCELLED | — |
| 037 | Construction management, erection, installation, commissioning, repair and maintenance of metallurgical plants and railway installations; high-bay and high-lift warehouse constructions, repair, maintenance of computer hardware | SECTION 70 - CANCELLED | — |
| 039 | Transport and logistics services, namely the efficient, effective transportation and storage of all types of goods | SECTION 70 - CANCELLED | — |
| 040 | Mechanical and thermomechanical treatment of metals and metal parts; forging, stamping, pressing, cutting and welding of metal parts for vehicle bodies; cutting and welding of metal profiles, sections and rails, custom assembling of materials to form vehicle bodies and vehicle body parts | SECTION 70 - CANCELLED | — |
| 042 | Technical consultancy and planning for metallurgical and automotive industry, railways and construction; conducting project and economic feasibility studies for metallurgical and automotive industry, railways and construction, included in this class | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 22, 2025 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Nov 22, 2025 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 30, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 30, 2022 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Nov 30, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 30, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 6, 2017 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Oct 6, 2017 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Sep 18, 2017 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 30, 2015 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Nov 12, 2013 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Sep 7, 2013 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED | — |
| Sep 7, 2013 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Sep 3, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Aug 19, 2013 | 715F | REGISTERED - SEC. 71 & SEC. 15 FILED | — |
| Aug 19, 2013 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 3, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 1, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 31, 2009 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 20, 2009 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 9, 2008 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 9, 2008 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 18, 2007 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 18, 2007 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 3, 2007 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 13, 2007 | NPUB | NOTICE OF PUBLICATION | — |
| Apr 27, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 27, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 26, 2007 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Apr 25, 2007 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 25, 2007 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 16, 2007 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 14, 2007 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Mar 14, 2007 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 14, 2007 | ALIE | ASSIGNED TO LIE | — |
| Feb 15, 2007 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 25, 2007 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 24, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 24, 2007 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 24, 2007 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 20, 2006 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 10, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 25, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 25, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 22, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 21, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 14, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 14, 2006 | NWAP | NEW APPLICATION ENTERED | — |
| Jul 13, 2006 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |