| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Pipework of metal, pipes of metal and metal piping, corrosion and erosion resistant coated pipes of metal, general purpose metal storage containers; all of the aforementioned goods for power, incinerator and industrial plants | SECTION 70 - CANCELLED | — |
| 007 | Machines and mechanical apparatuses for milling of solid fuel and raw materials, namely, grinding mills for chemical processing, portable saw mills, rolling and tubing mills for metal working, conveyors, power operated machine blower, dust exhausting equipment for cleaning purposes, namely, dust separators, apparatuses for power generation and power generating machines, namely, electric generators; compressors, namely, gas and air compressors, compressors for machines; turbines, namely, steam and gas turbines, machine parts in the nature of steam condensers, pumps, namely, vacuum pumps, centrifugal pumps, compressed air pumps, pneumatic pumps, rotary lobe pumps, rotary pumps, screw pumps, sludge pumps, submersible pumps, suction pumps, vertical turbine pumps; control units for machines and engines, namely, electro and control technology systems for operating of power, waste combustion and industrial plants composed of all or some of the aforementioned goods | SECTION 70 - CANCELLED | — |
| 011 | Heating and steam producing apparatuses and machines, for constructions for power plant engineering and combustion technology, consisting of heat exchangers, burners in the nature of gas and solid fuel burners for industrial use, acetylene burners, separators for steam heating systems that are not automatically operated for cleaning and purification of gases and air, furnaces, hot gas generators; air, water and gas filters for industrial installations, waste heat boilers, pre-heaters in the nature of hot-air space heating apparatuses, spinning air pre-heaters in the nature of electric and gas and solid fuel heating fans, heating surfaces in the nature of gas, water, fluid, solid fuel and electrical heated surfaces for industrial purposes, namely, power generation. gas condenser in the nature of separators for the cleaning and purification of gases, cooling plant in the nature of cooling domes, water cooling towers, evaporators, fan systems for wall ovens, chillers, namely, peltier cooling and heating apparatus, pipe freezing unit comprised of cooling aggregates with refrigerant hoses and deep freezer heads, chemical, nuclear and heating reactors for power generation, superheaters for power generation, namely, part of steam boiler apparatuses overheating water steam above evaporating temperature, ventilators for climatisation, burner valves in the nature of steam and thermostatic valves apparatuses for gas reduction in the nature of separators for the cleaning and purification of gases, gas-oil-combination-burner and gas surface burners for industrial, commercial and domestic use, fumes purification plants and their components, namely, separators for the cleaning and purification of gases, water and wastewater reprocessing and conditioning plants, and parts thereof for wastewater treatment, namely, chemical and biological sterilization units, reverse osmosis filtration units | SECTION 70 - CANCELLED | — |
| 037 | Construction of industrial plants in the nature of power, waste treatment and combustion plants and installation of industrial equipment in the nature of steam generators, piping and steel construction, heat utilization systems, ash removal systems, installations and machines for fragmentation of carbon; repair, maintenance of the aforementioned goods and building inspections of the aforementioned plants; rental of construction machines | SECTION 70 - CANCELLED | — |
| 039 | Transport by rail, bus, truck, ferry, ship, boat, and air and transport brokerage, namely, coordination and conduction of special transports, packaging articles for transportation and storage of documents, packages, raw materials and other freight | SECTION 70 - CANCELLED | — |
| 042 | Technological services, namely, technical planning of industrial plants in the nature of power, waste treatment and combustion plants, technical calculation, namely, technical design services in the field of power generation, waste incineration and industrial plants, construction planning, technical inspection of power, waste treatment and combustion plants for initiation and trial operations, technical remote monitoring of construction parts for maintenance purposes; technical development services, namely, development of new technology for others in the field of process optimization and industrial analysis for power, waste incineration and industrial plants | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 16, 2014 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Oct 16, 2014 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jan 5, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 29, 2012 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 24, 2012 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 5, 2009 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 5, 2009 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 28, 2009 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 28, 2008 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 12, 2008 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 23, 2008 | NPUB | NOTICE OF PUBLICATION | — |
| Jul 9, 2008 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 1, 2008 | ALIE | ASSIGNED TO LIE | — |
| Jun 30, 2008 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 18, 2008 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Jun 18, 2008 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 13, 2008 | PAPER RECEIVED | — | |
| Feb 6, 2008 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 6, 2008 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 24, 2008 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 10, 2008 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 10, 2008 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 10, 2007 | CNFR | FINAL REFUSAL MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 7, 2007 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 1, 2007 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Nov 1, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 31, 2007 | PAPER RECEIVED | — | |
| May 2, 2007 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 1, 2007 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 5, 2007 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Apr 5, 2007 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 5, 2007 | ALIE | ASSIGNED TO LIE | — |
| Mar 1, 2007 | PAPER RECEIVED | — | |
| Sep 15, 2006 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 30, 2006 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 30, 2006 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 26, 2006 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 25, 2006 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 11, 2006 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 11, 2006 | NWAP | NEW APPLICATION ENTERED | — |
| Aug 10, 2006 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |