Drawing for BABCOCK NOELL

USPTO serial 79025614

BABCOCK NOELL

Reviewed by CopyMark Law Group

Reg. 3534217Status 404
Filing date
Status date
Registration date
Nov 18, 2008
Examiner
MORRIS, KRISTINA KLOIBER
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BABCOCK NOELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Pipework of metal, pipes of metal and metal piping, corrosion and erosion resistant coated pipes of metal, general purpose metal storage containers; all of the aforementioned goods for power, incinerator and industrial plantsSECTION 71 - CANCELLED—
007Machines and mechanical apparatuses for milling of solid fuel and raw materials, namely, grinding mills for chemical processing, portable saw mills, rolling and tubing mills for metal working, conveyors, power operated machine blower, dust exhausting equipment for cleaning purposes, namely, dust separators, apparatuses for power generation and power generating machines, namely, electric generators; compressors, namely, gas and air compressors, compressors for machines; turbines, namely, steam and gas turbines, machine parts in the nature of steam condensers, pumps, namely, vacuum pumps, centrifugal pumps, compressed air pumps, pneumatic pumps, rotary lobe pumps, rotary pumps, screw pumps, sludge pumps, submersible pumps, suction pumps, vertical turbine pumps; control units for machines and engines, namely, electro and control technology systems for operating of power, waste combustion and industrial plants composed of all or some of the aforementioned goodsSECTION 71 - CANCELLED—
011Heating and steam producing apparatuses and machines, for constructions for power plant engineering and combustion technology, consisting of heat exchangers, burners in the nature of gas and solid fuel burners for industrial use, acetylene burners, separators for steam heating systems that are not automatically operated for cleaning and purification of gases and air, furnaces, hot gas generators; air, water and gas filters for industrial installations, waste heat boilers, pre-heaters in the nature of hot-air space heating apparatuses, spinning air pre-heaters in the nature of electric and gas and solid fuel heating fans, heating surfaces in the nature of gas, water, fluid, solid fuel and electrical heated surfaces for industrial purposes, namely, power generation, gas condenser in the nature of separators for the cleaning and purification of gases, cooling plant in the nature of cooling domes, water cooling towers, evaporators, fan systems for wall ovens, chillers, namely, peltier cooling and heating apparatus, pipe freezing unit comprised of cooling aggregates with refrigerant hoses and deep freezer heads, chemical, nuclear and heating reactors for power generation, superheaters for power generation, namely, part of steam boiler apparatuses overheating water steam above evaporating temperature, ventilators for climatisation, burner valves in the nature of steam and thermostatic valves, apparatuses for gas reduction in the nature of separators for the cleaning and purification of gases, gas-oil-combination-burner and gas surface burners for industrial, commercial and domestic use, fumes purification plants and their components, namely, separators for the cleaning and purification of gases, water and wastewater reprocessing and conditioning plants, and parts thereof for wastewater treatment, namely, chemical and biological sterilization units, reverse osmosis filtration unitsSECTION 71 - CANCELLED—
037Construction of industrial plants in the nature of power, waste treatment and combustion plants and installation of industrial equipment in the nature of steam generators, piping and steel construction, heat utilization systems, ash removal systems, installations and machines for fragmentation of carbon; repair, maintenance of the aforementioned goods and building inspections of the aforementioned plants; rental of construction machinesSECTION 71 - CANCELLED—
039Transport by rail, bus, truck, ferry, ship, boat, and air and transport brokerage, namely, coordination and conduction of special transports, packaging articles for transportation and storage of documents, packages, raw materials and other freightSECTION 71 - CANCELLED—
042Technological services, namely, technical planning of industrial plants in the nature of power, waste treatment and combustion plants, technical calculation, namely, technical design services in the field of power generation, waste incineration and industrial plants, construction planning, technical inspection of power, waste treatment and combustion plants for initiation and trial operations, technical remote monitoring of construction parts for maintenance purposes; technical development services, namely, development of new technology for others in the field of process optimization and industrial analysis for power, waste incineration and industrial plantsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 18, 2026DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jun 18, 2026DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 5, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 14, 2020INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 14, 2020INPCINVALIDATION PROCESSED—
Feb 21, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 21, 2019C71TCANCELLED SECTION 71—
Nov 18, 2017REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Dec 17, 2015RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 15, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jun 22, 2015NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 22, 201571AGREGISTERED-SEC.71 ACCEPTED—
Jun 15, 2015EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jun 15, 2015PR71POST REGISTRATION ACTION MAILED - SEC.71—
Jun 1, 2015EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
May 1, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 1, 2014PR71POST REGISTRATION ACTION MAILED - SEC.71—
Dec 1, 2014APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 17, 2014ES71TEAS SECTION 71 RECEIVED—
Jan 5, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 9, 2009FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 9, 2009FIMPFINAL DISPOSITION PROCESSED—
Feb 18, 2009FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 18, 2008R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 2, 2008PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 13, 2008NPUBNOTICE OF PUBLICATION—
Jul 28, 2008PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 12, 2008CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 17, 2008ACECAMENDMENT FROM APPLICANT ENTERED—
Jun 17, 2008CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 13, 2008MAILPAPER RECEIVED—
Feb 6, 2008ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 6, 2008REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 24, 2008OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jan 10, 2008OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jan 10, 2008OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Dec 10, 2007CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 7, 2007CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 8, 2007ACECAMENDMENT FROM APPLICANT ENTERED—
Nov 8, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 31, 2007MAILPAPER RECEIVED—
May 2, 2007CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 1, 2007CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2007ACECAMENDMENT FROM APPLICANT ENTERED—
Apr 5, 2007CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 5, 2007ALIEASSIGNED TO LIE—
Mar 1, 2007MAILPAPER RECEIVED—
Sep 15, 2006RFNTREFUSAL PROCESSED BY IB—
Aug 30, 2006RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Aug 30, 2006RFRRREFUSAL PROCESSED BY MPU—
Aug 26, 2006RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Aug 25, 2006CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 11, 2006DOCKASSIGNED TO EXAMINER—
Aug 11, 2006NWAPNEW APPLICATION ENTERED—
Aug 10, 2006REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance